2Q/2012 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 0 0 1.0 0 0 1.0 0
Critical hours 2208.0 2209.0 2159.0 2163.4 2208.0 1849.9 1247.7 814.0
                 
Indicator value 1.8 1.8 1.8 0.8 0.8 0.8 1.9 1.1


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 0 0 0 0 0 0 0 0
Critical hours 2208.0 2209.0 2159.0 2163.4 2208.0 1849.9 1247.7 814.0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 2 0 1 1 1 0 0 0
                 
Indicator value 3 2 3 4 3 3 2 1

Licensee Comments:

3Q/11: LER # 50-306/2011-003-00. Report date 8/23/2011 - Unit 2 Offsite Power Sources Declared Inoperable as a Consequence of the Loss of the 2RY Transformer Bus Duct (L-PI-11-066).

2Q/11: LER 50306/2011-001-00 Unit 2 Shield Building Inoperable

1Q/11: LER 50-282/2010-004-00 - 1/28/2011 - Battery Charger Inoperability due to Potential Undervoltage Conditions

3Q/10: 7/16/2010 - LER 50-306/2010-003-00, Unit 2 Fuel Oil Transfer Pumps are Vulnerable To A Potential Common Mode Failure, 8/9/2010 - LER 50-282/2010-003-00, Postulated Flooding of Battery Rooms Due To Inadequate Battery Room Door Threshold Seals






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 1.25E-07 5.28E-08 9.44E-08 9.46E-08 1.17E-07 7.89E-07 4.00E-07 3.26E-07
URI (ΔCDF) -1.08E-07 -1.08E-07 -1.08E-07 -1.08E-07 3.92E-07 -1.50E-07 -1.37E-07 -1.24E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.80E-08 -5.50E-08 -1.30E-08 -1.30E-08 5.10E-07 6.40E-07 2.60E-07 2.00E-07

Licensee Comments:

2Q/12: Risk Cap Invoked.

1Q/12: Risk Cap Invoked.

4Q/11: Risk Cap Invoked. Changed PRA Parameter(s).

3Q/11: Risk Cap Invoked.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 6.24E-09 1.11E-08 1.00E-08 1.00E-08 9.53E-09 2.34E-08 2.56E-08 2.55E-08
URI (ΔCDF) -1.69E-08 -1.69E-08 -1.69E-08 -1.69E-08 -1.69E-08 -3.13E-08 -3.14E-08 -3.17E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.10E-08 -5.90E-09 -6.90E-09 -6.90E-09 -7.40E-09 -7.90E-09 -5.80E-09 -6.20E-09

Licensee Comments:

4Q/11: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 7.87E-09 8.61E-09 1.41E-08 1.42E-08 1.29E-08 1.57E-08 2.01E-08 1.17E-09
URI (ΔCDF) -1.32E-07 -1.32E-07 -1.32E-07 -1.34E-07 -1.33E-07 -1.81E-07 -1.86E-07 -1.88E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.70E-07 -1.70E-07 -1.90E-07

Licensee Comments:

4Q/11: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 8.87E-09 8.87E-09 8.90E-09 8.93E-09 8.60E-09 1.49E-08 -2.94E-08 -2.94E-08
URI (ΔCDF) -1.31E-07 -1.31E-07 -1.31E-07 -1.31E-07 -1.12E-07 -1.21E-07 -1.38E-07 3.06E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.20E-07 -1.20E-07 -1.20E-07 -1.20E-07 -1.00E-07 -1.10E-07 -1.70E-07 2.80E-07

Licensee Comments:

4Q/11: Changed PRA Parameter(s).






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 1.42E-06 9.98E-07 9.78E-07 1.03E-06 9.39E-07 3.45E-07 3.51E-07 2.86E-07
URI (ΔCDF) -4.54E-07 -4.50E-07 -4.47E-07 -4.47E-07 -4.41E-07 -2.59E-07 -2.61E-07 -3.29E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 9.60E-07 5.50E-07 5.30E-07 5.80E-07 5.00E-07 8.60E-08 9.00E-08 -4.20E-08

Licensee Comments:

4Q/11: Changed PRA Parameter(s).






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.000119 0.000108 0.000150 0.000140 0.000147 0.000161 0.000152 0.000160 0.000162 0.000169 0.000173 0.000177
Technical specification limit 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity 0.000211 0.000181 0.000182 0.000195 0.000201 0.000200 0.000213 0.000212 N/A N/A N/A 0.000106
Technical specification limit 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
                         
Indicator value 0 0 0 0 0 0 0 0 N/A N/A N/A 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 0.101 0.076 0.100 0.273 0.391 0.268 0.242 0.164 0.150 0.267 0.204 0.169
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.0 0.8 1.0 2.7 3.9 2.7 2.4 1.6 1.5 2.7 2.0 1.7
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage 0.125 0.339 0.355 0.109 0.133 0.102 0.144 0.156 0 0 0.208 0.169
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 1.3 3.4 3.6 1.1 1.3 1.0 1.4 1.6 0 0 2.1 1.7

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 60.0 22.0 40.0 6.0 29.0 27.0 26.0 14.0
Total opportunities 60.0 23.0 40.0 6.0 32.0 27.0 28.0 14.0
                 
Indicator value 97.3% 97.6% 97.1% 97.1% 96.2% 96.3% 96.8% 97.4%

Licensee Comments:

1Q/12: Revised February and March 2012 Drill and Exercise Performance based on previously unaccounted for opportunities. No change to performance indicator color.Revised February and March 2012 Drill and Exercise Performance based on previously unaccounted for opportunities. No change to performance indicator color.

4Q/10: Error was discovered in 4th quarter 2010 data. DEP credit was taken for unanticipated notification.






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 150.0 153.0 141.0 141.0 143.0 145.0 156.0 155.0
Total Key personnel 151.0 154.0 142.0 141.0 143.0 145.0 156.0 155.0
                 
Indicator value 99.3% 99.4% 99.3% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests 1516 1517 1519 1512 1463 1514 1520 1516
Total sirens-tests 1521 1521 1521 1521 1521 1521 1521 1521
                 
Indicator value 99.6% 99.6% 99.7% 99.7% 98.8% 98.8% 98.8% 98.8%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 1 1 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 