United States Nuclear Regulatory Commission - Protecting People and the Environment

Nine Mile Point 1

2Q/2012 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 1.0 0 1.0 0 0 0 0
Critical hours 2208.0 2138.5 1898.0 1390.7 2208.0 2209.0 2065.3 2184.0
                 
Indicator value 0.8 0.8 0.8 1.8 1.8 0.9 0.9 0


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 0 0 1.0 0 0 0 1.0 0
Critical hours 2208.0 2138.5 1898.0 1390.7 2208.0 2209.0 2065.3 2184.0
                 
Indicator value 0 0 0.8 0.9 0.9 0.9 0.9 0.8

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -4.26E-09 -4.25E-09 -4.24E-09 -4.18E-09 -3.27E-09 -3.28E-09 -2.95E-09 -2.84E-09
URI (ΔCDF) 1.57E-08 1.72E-08 1.59E-08 1.62E-08 1.25E-08 1.19E-08 1.35E-08 1.39E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.10E-08 1.30E-08 1.20E-08 1.20E-08 9.20E-09 8.60E-09 1.10E-08 1.10E-08

Licensee Comments:

1Q/11: MSPI Planned Unavailability Coefficients were updated to align with changes in maintenance strategies including newly identified work, offline work being performed online, and unavailability activities no longer being performed in parallel






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.13E-08 -1.13E-08 -1.13E-08 -1.09E-08 -1.09E-08 -1.09E-08 -1.09E-08 -1.09E-08
URI (ΔCDF) -1.90E-09 -1.98E-09 -2.06E-09 9.18E-09 9.15E-09 9.51E-09 9.69E-09 9.99E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.30E-08 -1.30E-08 -1.30E-08 -1.70E-09 -1.70E-09 -1.40E-09 -1.20E-09 -8.90E-10

Licensee Comments:

1Q/11: MSPI Planned Unavailability Coefficients were updated to align with changes in maintenance strategies including newly identified work, offline work being performed online, and unavailability activities no longer being performed in parallel






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.11E-09 -1.11E-09 -1.24E-09 -1.24E-09 -1.24E-09 -1.24E-09 -1.24E-09 -1.24E-09
URI (ΔCDF) -5.06E-10 -4.98E-10 -5.14E-10 -5.25E-10 -5.14E-10 -5.06E-10 -4.69E-10 -4.42E-10
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.60E-09 -1.60E-09 -1.80E-09 -1.80E-09 -1.80E-09 -1.70E-09 -1.70E-09 -1.70E-09

Licensee Comments:

1Q/11: MSPI Planned Unavailability Coefficients were updated to align with changes in maintenance strategies including newly identified work, offline work being performed online, and unavailability activities no longer being performed in parallel






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.47E-10 -1.47E-10 -1.46E-10 -1.46E-10 -1.46E-10 -1.46E-10 -1.46E-10 -1.46E-10
URI (ΔCDF) -1.43E-09 -1.44E-09 -1.44E-09 -1.54E-09 -1.53E-09 -1.54E-09 -1.55E-09 -1.46E-09
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.60E-09 -1.60E-09 -1.60E-09 -1.70E-09 -1.70E-09 -1.70E-09 -1.70E-09 -1.60E-09

Licensee Comments:

1Q/11: MSPI Planned Unavailability Coefficients were updated to align with changes in maintenance strategies including newly identified work, offline work being performed online, and unavailability activities no longer being performed in parallel






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.57E-08 -1.57E-08 -1.57E-08 -1.57E-08 -1.57E-08 -1.57E-08 -1.57E-08 -1.57E-08
URI (ΔCDF) 1.33E-08 1.33E-08 1.33E-08 1.33E-08 1.33E-08 1.33E-08 1.33E-08 1.34E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -2.40E-09 -2.40E-09 -2.40E-09 -2.40E-09 -2.40E-09 -2.40E-09 -2.40E-09 -2.30E-09

Licensee Comments:

1Q/11: MSPI Planned Unavailability Coefficients were updated to align with changes in maintenance strategies including newly identified work, offline work being performed online, and unavailability activities no longer being performed in parallel






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.000006 0.000005 0.000008 0.000007 0.000007 0.000005 0.000004 0.000005 0.000005 N/A N/A 0.000009
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 N/A N/A 0
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity 0.000008 0.000007 0.000006 0.000007 0.000007 0.000009 0.000007 0.000007 0.000007 0.000016 0.000007 0.000008
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 5.135 5.347 4.660 4.511 5.339 5.382 5.753 5.947 6.214 4.657 4.480 5.562
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 20.5 21.4 18.6 18.0 21.4 21.5 23.0 23.8 24.9 18.6 17.9 22.2
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage 5.664 4.717 4.583 5.057 5.452 5.834 5.469 5.174 6.457 6.434 6.881 6.480
Technical specification limit 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
                         
Indicator value 22.7 18.9 18.3 20.2 21.8 23.3 21.9 20.7 25.8 25.7 27.5 25.9

Licensee Comments:

6/11: Change reflects Maximum RCS Identified leakage value since 1Q2010. Unit 1 does not have a technical specification limit on identified leakage. Per NEI 99-02, the total leakage must be entered instead of the identified leakage. However, identified leakage was entered since 1Q2010. This was corrected in 3Q2011. This change has no impact on the color of the indicator.

3/11: Change reflects Maximum RCS Identified leakage value since 1Q2010. Unit 1 does not have a technical specification limit on identified leakage. Per NEI 99-02, the total leakage must be entered instead of the identified leakage. However, identified leakage was entered since 1Q2010. This was corrected in 3Q2011. This change has no impact on the color of the indicator.

12/10: Change reflects Maximum RCS Identified leakage value since 1Q2010. Unit 1 does not have a technical specification limit on identified leakage. Per NEI 99-02, the total leakage must be entered instead of the identified leakage. However, identified leakage was entered since 1Q2010. This was corrected in 3Q2011. This change has no impact on the color of the indicator.

9/10: Change reflects Maximum RCS Identified leakage value since 1Q2010. Unit 1 does not have a technical specification limit on identified leakage. Per NEI 99-02, the total leakage must be entered instead of the identified leakage. However, identified leakage was entered since 1Q2010. This was corrected in 3Q2011. This change has no impact on the color of the indicator.






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 21.0 50.0 33.0 11.0 26.0 60.0 37.0 3.0
Total opportunities 21.0 51.0 33.0 11.0 26.0 61.0 38.0 3.0
                 
Indicator value 97.8% 98.3% 98.5% 98.5% 99.0% 98.9% 98.8% 98.8%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 101.0 96.0 100.0 102.0 97.0 90.0 88.0 83.0
Total Key personnel 101.0 96.0 100.0 102.0 97.0 90.0 88.0 83.0
                 
Indicator value 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests 256 296 222 258 258 295 222 296
Total sirens-tests 259 296 222 259 259 296 222 296
                 
Indicator value 99.7% 99.7% 99.7% 99.6% 99.8% 99.7% 99.7% 99.8%

Licensee Comments:

3Q/10: Change reflect correction to Successful siren-test and Total siren-test for August 2010. They were reported as 74 each. The actual numbers should have been 111 each. This change has no impact on the color of the indicator which continues to be in GREEN






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process