Hatch 2

2Q/2012 Performance Indicators

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 0 0 0 0 1.0 0 0
Critical hours 2208.0 2209.0 2065.1 1324.7 2208.0 1954.3 2183.0 2063.2
                 
Indicator value 0 0 0 0 0 0.9 0.9 0.8


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 0 0 0 1.0 1.0 0 0 0
Critical hours 2208.0 2209.0 2065.1 1324.7 2208.0 1954.3 2183.0 2063.2
                 
Indicator value 0.8 0.8 0 0.9 1.8 1.9 1.8 0.8

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (BWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 0 0 0 0 0 1 0 0
                 
Indicator value 1 1 0 0 0 1 1 1

Licensee Comments:

4Q/11: LER 2011-001, Rev. 1






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 1.32E-07 2.07E-07 2.22E-07 1.75E-07 1.61E-07 1.60E-07 1.69E-07 2.17E-07
URI (ΔCDF) 5.79E-08 1.35E-07 1.30E-07 1.44E-07 -5.97E-08 -6.34E-08 -4.61E-08 -3.43E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.90E-07 3.40E-07 3.50E-07 3.20E-07 1.00E-07 9.60E-08 1.20E-07 1.80E-07

Licensee Comments:

1Q/11: Changed PRA Parameter(s). All PRA inputs were revised effective 4Q10 to reflect Rev 4 of the PRA model revised 3Q10. Version E of the Hatch MSPI Basis Document was approved on 12/28/2010.

4Q/10: Changed PRA Parameter(s). All PRA inputs were revised to reflect the Rev 4 PRA model (effective September 14, 2010), updated EDG mission time per Rev. 6 changes to NEI-99-02. These changes were incorporated into MSPI Basis Document, effective 12/28/2010.

3Q/10: Risk Cap Invoked.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -2.62E-08 -1.46E-08 -2.24E-08 -2.24E-08 -2.24E-08 -2.24E-08 -2.24E-08 -2.24E-08
URI (ΔCDF) 1.52E-07 9.27E-08 -3.61E-08 -3.51E-08 -3.37E-08 -3.49E-08 -3.46E-08 -3.20E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.30E-07 7.80E-08 -5.80E-08 -5.70E-08 -5.60E-08 -5.70E-08 -5.70E-08 -5.40E-08

Licensee Comments:

1Q/11: Changed PRA Parameter(s). All PRA inputs were revised effective 4Q10 to reflect Rev 4 of the PRA model revised 3Q10. Version E of the Hatch MSPI Basis Document was approved on 12/28/2010.

4Q/10: Changed PRA Parameter(s). All PRA inputs were revised to reflect the Rev 4 PRA model (effective September 14, 2010), updated EDG mission time per Rev. 6 changes to NEI-99-02. These changes were incorporated into MSPI Basis Document, effective 12/28/2010.






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 5.54E-09 1.01E-08 1.51E-08 1.61E-08 1.56E-08 1.60E-08 1.43E-08 1.27E-08
URI (ΔCDF) -8.34E-08 -1.88E-08 -1.57E-08 -1.63E-08 -1.53E-08 -1.53E-08 -1.52E-08 -1.40E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -7.80E-08 -8.70E-09 -6.30E-10 -2.30E-10 3.30E-10 7.10E-10 -9.00E-10 -1.30E-09

Licensee Comments:

1Q/11: Changed PRA Parameter(s). All PRA inputs were revised effective 4Q10 to reflect Rev 4 of the PRA model revised 3Q10. Version E of the Hatch MSPI Basis Document was approved on 12/28/2010.

4Q/10: Changed PRA Parameter(s). All PRA inputs were revised to reflect the Rev 4 PRA model (effective September 14, 2010), updated EDG mission time per Rev. 6 changes to NEI-99-02. These changes were incorporated into MSPI Basis Document, effective 12/28/2010.






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 3.29E-08 5.86E-08 6.81E-08 7.23E-08 2.03E-08 2.13E-08 1.69E-08 1.45E-08
URI (ΔCDF) 2.82E-08 3.47E-08 4.73E-08 5.41E-08 6.51E-08 6.14E-08 -1.16E-07 -1.13E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 6.10E-08 9.30E-08 1.20E-07 1.30E-07 8.50E-08 8.30E-08 -9.90E-08 -9.90E-08

Licensee Comments:

1Q/11: Changed PRA Parameter(s). All PRA inputs were revised effective 4Q10 to reflect Rev 4 of the PRA model revised 3Q10. Version E of the Hatch MSPI Basis Document was approved on 12/28/2010.

4Q/10: Changed PRA Parameter(s). All PRA inputs were revised to reflect the Rev 4 PRA model (effective September 14, 2010), updated EDG mission time per Rev. 6 changes to NEI-99-02. These changes were incorporated into MSPI Basis Document, effective 12/28/2010.






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 6.63E-08 1.40E-07 1.41E-07 7.78E-08 7.80E-08 5.26E-08 3.55E-08 5.68E-08
URI (ΔCDF) 4.87E-08 1.32E-07 1.37E-07 8.92E-08 9.28E-08 5.08E-09 9.56E-09 1.08E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 1.20E-07 2.70E-07 2.80E-07 1.70E-07 1.70E-07 5.80E-08 4.50E-08 6.80E-08

Licensee Comments:

1Q/11: Changed PRA Parameter(s). All PRA inputs were revised effective 4Q10 to reflect Rev 4 of the PRA model revised 3Q10. Version E of the Hatch MSPI Basis Document was approved on 12/28/2010.

4Q/10: Changed PRA Parameter(s). All PRA inputs were revised to reflect the Rev 4 PRA model (effective September 14, 2010), updated EDG mission time per Rev. 6 changes to NEI-99-02. These changes were incorporated into MSPI Basis Document, effective 12/28/2010.

3Q/10: Changed PRA Parameter(s). Update for change file: Version D of the Basis Document shows that the FVUAP values for Unit 2 RHRSW divisions 1 and 2 should be 3.90e-02 and 7.22e-02, respectively. However, the January Unit 2 Cooling Water Derivation Report shows that the FVUAP values for U2 RHRSW divisions 1 and 2 are still Version C values. Since the values in Version E of the Basis Document went into effect October 2010, the FVUAP values were overridden from January 2009 through September 2010 for U2 RHRSW Divisions 1 and 2 to be 3.90e-02 and 7.22e-02, as described in Version D of the Basis. This change did not affect the ???color??? of the indicator.






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.000127 0.000143 0.000143 0.000136 0.000128 0.000126 0.000121 0.000115 0.000111 N/A 0.000045 0.000054
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 N/A 0 0
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity 0.000058 0.000060 0.000048 0.000038 0.000084 0.000048 0.000062 0.000064 0.000116 0.000063 0.000062 0.000062
Technical specification limit 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2
                         
Indicator value 0 0 0 0 0 0 0 0 0.1 0 0 0

Licensee Comments:

6/11: Unit 2 was in a refueling outage the month of April.






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 1.740 1.610 1.520 1.500 1.420 1.420 1.350 1.360 1.440 N/A 1.770 1.770
Technical specification limit 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
                         
Indicator value 5.8 5.4 5.1 5.0 4.7 4.7 4.5 4.5 4.8 N/A 5.9 5.9
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage 1.790 1.770 1.790 1.690 1.730 1.730 1.710 1.650 1.620 1.670 1.750 1.710
Technical specification limit 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0 30.0
                         
Indicator value 6.0 5.9 6.0 5.6 5.8 5.8 5.7 5.5 5.4 5.6 5.8 5.7

Licensee Comments:

6/11: Unit 2 was in a Refueling Outage during the month of April






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 38.0 8.0 6.0 30.0 27.0 20.0 10.0 70.0
Total opportunities 40.0 8.0 6.0 32.0 27.0 21.0 10.0 72.0
                 
Indicator value 96.4% 96.4% 96.5% 95.3% 95.8% 96.6% 96.5% 96.8%

Licensee Comments:

3Q/11: During NRC EP Inspection, 10/31/11, did not have supporting documentation for drill DEP Opportunity, had to remove ERO participation credit for individuals involved and opportunities.

1Q/11: During NRC EP Inspections, 10/31/11, did not have supporting documentation for drill DEP Opportunity, had to remove ERO participation credit for individuals involved and opportunities.






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 136.0 138.0 134.0 141.0 145.0 150.0 150.0 149.0
Total Key personnel 136.0 138.0 134.0 143.0 145.0 150.0 150.0 149.0
                 
Indicator value 100.0% 100.0% 100.0% 98.6% 100.0% 100.0% 100.0% 100.0%

Licensee Comments:

2Q/11: During NRC EP Inspection, 10/31/11, did not have supporting documentation for drill DEP Opportunity, had to remove ERO participation credit for individuals involved and Opportunities.

1Q/11: During NRC EP Inspectin, 10/31/11, did not have supporting doucmentation for drill DEP Opportunity, had to remove ERO participation credit for individuals involved and opportunities.






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests                
Total sirens-tests                
                 
Indicator value                

Licensee Comments:

2Q/12: Plant Hatch does not use sirens as an emergency notification system.

1Q/12: Plant Hatch does not use sirens as an emergency notifications system.

4Q/11: Plant Hatch does not use sirens as an emergency notification system.

3Q/11: Plant Hatch does not use sirens as an emergency notification system.

2Q/11: Plant Hatch does not use sirens as an emergency notification system.

1Q/11: Plant Hatch does not use sirens as an emergency notification system.

4Q/10: Plant Hatch does not use sirens as an emergency notificaton system.

3Q/10: Plant Hatch does not use sirens as an emergency notification system.






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 