Fort Calhoun has been shutdown since April 2011. Because the Unplanned Scrams with Complications (USwC) and Mitigating Systems Performance Index (MSPI) performance indicators (PIs) are heavily influenced by the operational status of the reactor, NRC staff has evaluated the validity of these PIs. Because the reactor has not been critical, there have been no recent opportunities for a scram that would count in the USwC indicator. Similarly, the MSPI values can become skewed because of a lack of critical hours. For these reasons, the staff has determined that these PIs no longer provide valid indications of performance.

Licensee's General Comments: none



Link to Notes

Unplanned Scrams per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned scrams 0 1.0 0 0 0 0 0 0
Critical hours 2208.0 2160.0 2135.4 215.8 0 0 0 0
                 
Indicator value 0 0.8 0.8 1.0 1.6 N/A N/A N/A


Licensee Comments: none




Link to Notes

Unplanned Power Changes per 7000 Critical Hrs 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Unplanned power changes 0 1.0 0 0 0 0 0 0
Critical hours 2208.0 2160.0 2135.4 215.8 0 0 0 0
                 
Indicator value 1.9 1.6 1.6 1.0 1.6 N/A N/A N/A

Licensee Comments: none






Link to Notes

Unplanned Scrams with Complications 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Scrams with complications 0 0 0 0 0 0 0 0
                 
                 
Indicator value 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Licensee Comments: none






Link to Notes

Safety System Functional Failures (PWR) 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Safety System Functional Failures 1 0 1 1 1 0 1 3
                 
Indicator value 1 1 2 3 3 3 3 5

Licensee Comments:

2Q/12: LER 2012-001, Inadequate Flooding Protection Procedure; LER 2012-005, TS violation due to inadequate testing of DG fuel pumps; LER 2012-004, Inadequate Analysis of Drift Affects Safety Related Equipment

1Q/12: LER 2011-010, "Fire Causes a Circuit Breaker to Open Outside Design Assumptions" was issued January 2012 and LER 2011-006, "Inoperability of Both Trains of Containment Coolers Due to a Mispositioned Valve" was cancelled removing the item from earlier reporting.

3Q/11: The following information is being provided to correct an oversight in the original submittals. LER 2011-003, "Inadequate Flooding Protection Due To Ineffective Oversight," effective first quarter 2011. LER 2011-004, "Isolation of Both Trains of Safety Related Auxiliary Feedwater," effective second quarter 2011. LER 2011-006, "Inoperability of Both Trains of Containment Coolers Due to a Mispositioned Valve,"effective second quarter 2011. LER 2011-008, "Fire in Safety Related 480 Volt Electrical Bus" effective third quarter 2011.

1Q/11: LER 2011-001 "Inadequate Flooding Protection Due To Ineffective Oversight"

3Q/10: LER 2010-003, "Inadequate Margin Renders Auxiliary Feedwater Pump Inoperable"






Link to Notes

Mitigating Systems Performance Index, Emergency AC Power System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) 1.93E-07 1.76E-07 1.89E-08 4.38E-08 1.14E-07 2.86E-07 3.94E-07 3.09E-07
URI (ΔCDF) -1.13E-06 -1.11E-06 -1.01E-06 -9.90E-07 -9.27E-07 -8.99E-07 -4.62E-07 -4.38E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -9.40E-07 -9.40E-07 -1.00E-06 -9.50E-07 -8.10E-07 -6.10E-07 -6.80E-08 -1.30E-07

Licensee Comments:

2Q/12: Risk Cap Invoked.

1Q/12: Risk Cap Invoked.






Link to Notes

Mitigating Systems Performance Index, High Pressure Injection System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -8.92E-08 -8.90E-08 -8.65E-08 -6.91E-08 -7.33E-08 -7.07E-08 -7.03E-08 -5.54E-08
URI (ΔCDF) -8.46E-08 -9.21E-08 -9.22E-08 -9.10E-08 -9.02E-08 -8.96E-08 -8.93E-08 -8.89E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.70E-07 -1.80E-07 -1.80E-07 -1.60E-07 -1.60E-07 -1.60E-07 -1.60E-07 -1.40E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -1.38E-09 -6.39E-09 -3.49E-08 -3.47E-08 -2.78E-08 -1.58E-08 -3.05E-08 -7.37E-08
URI (ΔCDF) 6.47E-07 6.57E-07 6.77E-07 7.49E-07 7.95E-07 8.54E-07 5.92E-07 2.55E-07
PLE NO NO NO NO NO NO NO NO
                 
Indicator value 6.50E-07 6.50E-07 6.40E-07 7.10E-07 7.70E-07 8.40E-07 5.60E-07 1.80E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Residual Heat Removal System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -8.67E-08 -8.65E-08 -5.36E-08 3.84E-09 -1.48E-07 -1.45E-07 -1.43E-07 -1.39E-07
URI (ΔCDF) -6.45E-08 -6.48E-08 -6.51E-08 -6.62E-08 -6.70E-08 -6.95E-08 -6.99E-08 -7.22E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -1.50E-07 -1.50E-07 -1.20E-07 -6.20E-08 -2.10E-07 -2.10E-07 -2.10E-07 -2.10E-07

Licensee Comments: none






Link to Notes

Mitigating Systems Performance Index, Cooling Water Systems 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
UAI (ΔCDF) -3.14E-07 -2.95E-07 -3.52E-07 -3.53E-07 -3.17E-07 -3.09E-07 -2.85E-07 -2.46E-07
URI (ΔCDF) 4.96E-09 -1.98E-08 -4.71E-08 -4.64E-08 -4.60E-08 -4.55E-08 -4.51E-08 -4.45E-08
PLE NO NO NO NO NO NO NO NO
                 
Indicator value -3.10E-07 -3.10E-07 -4.00E-07 -4.00E-07 -3.60E-07 -3.50E-07 -3.30E-07 -2.90E-07

Licensee Comments: none






Link to Notes

Reactor Coolant System Activity 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum activity 0.001780 0.001950 0.001990 0.001960 0.002010 0.002140 0.002140 0.002110 0.002290 0.002090 N/A N/A
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 N/A N/A
Reactor Coolant System Activity 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum activity N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Technical specification limit 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
                         
Indicator value N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Licensee Comments: none






Link to Notes

Reactor Coolant System Leakage 7/10 8/10 9/10 10/10 11/10 12/10 1/11 2/11 3/11 4/11 5/11 6/11
Maximum leakage 0.213 0.277 0.386 0.284 0.248 0.245 0.231 0.336 0.286 0.196 N/A N/A
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value 2.1 2.8 3.9 2.8 2.5 2.5 2.3 3.4 2.9 2.0 N/A N/A
Reactor Coolant System Leakage 7/11 8/11 9/11 10/11 11/11 12/11 1/12 2/12 3/12 4/12 5/12 6/12
Maximum leakage N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
Technical specification limit 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
                         
Indicator value N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

Licensee Comments: none






Link to Notes

Drill/Exercise Performance 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful opportunities 73.0 49.0 61.0 11.0 33.0 12.0 59.0 41.0
Total opportunities 73.0 50.0 62.0 13.0 36.0 12.0 62.0 43.0
                 
Indicator value 98.1% 97.7% 97.5% 96.7% 96.3% 96.4% 96.5% 96.6%

Licensee Comments: none






Link to Notes

ERO Drill Participation 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Participating Key personnel 122.0 118.0 123.0 124.0 118.0 107.0 102.0 107.0
Total Key personnel 122.0 118.0 124.0 124.0 119.0 108.0 103.0 108.0
                 
Indicator value 100.0% 100.0% 99.2% 100.0% 99.2% 99.1% 99.0% 99.1%

Licensee Comments: none






Link to Notes

Alert & Notification System 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
Successful siren-tests 804 808 707 801 737 876 704 806
Total sirens-tests 808 808 707 802 737 878 705 808
                 
Indicator value 99.6% 99.6% 99.7% 99.8% 100.0% 99.9% 99.9% 99.8%

Licensee Comments: none






Link to Notes

Occupational Exposure Control Effectiveness 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
High radiation area occurrences 0 0 0 0 0 0 0 0
Very high radiation area occurrences 0 0 0 0 0 0 0 0
Unintended exposure occurrences 0 0 0 0 0 0 0 0
Indicator value 1 0 0 0 0 0 0 0

Licensee Comments: none






Link to Notes

RETS/ODCM Radiological Effluent 3Q/10 4Q/10 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12
RETS/ODCM occurrences 0 0 0 0 0 0 0 0
                 
Indicator value 0 0 0 0 0 0 0 0

Licensee Comments: none






Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.





 
 
 
 

Top of page    Action Matrix Summary |  Inspection Findings Summary |  PI Summary |  Reactor Oversight Process

Last Modified: July 24, 2012