Loading Box 29
Hand-excavation of Box 5 and 8
Mock-up for working with Boxes 80 and 82
Preparing to lift a waste box from a trench
Survey of the lid of Box 82
Directing a lift from the TV7 vault
Night-time TRU retrieval from vaults
Box 82 and cover boxes
Installing a well casing
Cleaning a well casing
Sampling the 216-S-19 waste site
Future Site of 200 West Groundwater Treatment Facility
Protective transfer piping placed
Well casing inventory
Loading HDPE piping for 200 West Groundwater Treatment Facility
Groundbreaking for the 200 West Pump and Treat
Preparing Box 82 for removal (Jan 2010)
200 West pump and treat transfer building excavation
Constructing a transfer building foundation (June 2010)
Fill project at 200 West pump and treat
Preparing for waste retrieval
Preparing to lift Box 3 (July 2010)
Setting Box 3 on the ground (July 2010)
200 West Pump & Treat steel construction 10-1-10
Concrete pouring for 200W pump and treat facility
Concrete for groundwater treatment facilities
Installing well in 200-ZP-1 operable unit
Lifting TRU waste cover box
200 West Area aerial (8-13-10)
Ground-penetrating radar scanning
Separating 284-W baghouses
Planning to lower the 284-W exhaust stacks
284-W chimneys marked for charges
Separating 284-W structures
Preparing Power House structures for demolition
Preparing two chimneys for demolition
284-W chimneys and baghouses isolated
Isolating 284-W baghouses
284-W baghouses prepped for demolition
284-W baghouse debris
200-West Water tower before demolition
200-West water tower during demolition
200-West water tower after demolition
284-W structures explosive demolition begins
284-W structures during explosive demolition
284-W structures after explosive demolition
Remains of 284-W chimneys and baghouses
Crew watches explosive demolition
Next generation in waste retrieval technology
Size reducing PFP process vacuum system piping 2-4-11
Removing contaminated piping from PFP
Lifting a box from 4B Trench 11
Grout batch plant constructed
Last glovebox removed from PFP vault complex
Labeling section of piping from PFP
Labeling drum of TRU waste
Tanks lifted for placement
Tank placed for pump and treat system
200 West Groundwater Treatment Facility Aerial 3-4-11
Construction of the Biological Process Building 3-11-11
Mixed low-level waste loaded for shipment
Lifting a box of transuranic waste
200 West pump and treat 50 percent complete
Debris from the 284-W explosive demolition
Cleanup at the 284-W site April 2011
Piping for a pump and treat
Grout truck arrives for U Canyon
Preparing grout for U Canyon
Grout test at U Canyon
Equipment moved into pump and treat facility
Demolishing the 284-W conveyor
HA19 glovebox section removed
Concrete placed for lime stabilization building
Waste covered with container for shipment
Piping supports for pump and treat
Piping and steel for Biological Treatment Pad
Box 27 removed from trench
Six drums in container for Perma-Fix Northwest
Blower motors for 200 West Groundwater Treatment Facility
Overhead crane rails installed for pump and treat system