SEARCH TOOLS SITEMAP HOME ABOUT US FUNCTIONS RESOURCES NEWSFEEDS VIDEOS EVENTS
Departmental Representative
to the DNFSB
Home
Welcome
Archive
Chronological Listing
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
1990-2001
Board Recommendations
Board Recommendations
Rec.2012-2
Rec.2012-1
Rec.2011-1
Rec.2010-2
Rec.2010-1
Rec.2009-2
Rec.2009-1
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2000-1
Public Meetings and Hearings
SIMS
SIMS Logon
Letter Commitments
Recommendation Commitments
Board Review of Directives
About Our Office
Mission and Functions
Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Office Assignments
Our Office Contacts
Interface Workshop
Web Sites Related to Our Office
Interface Manual
About the Board
General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Performance Report
Board Web Site
Road Map to the Board
Board Web Site
Contact Us
Quick Reference
Facility Representative
Safety System Oversight
Federal Technical Capability Program
DOE Integrated Safety Management
DOE Directives Program
DOE Technical Standards Program
DOE Phone Book
HSS Logo
Information Archive Homepage
RECOMMENDATION DOCS.  

Rec. 2009-2
Los Alamos National Laboratory Plutonium Facility Seismic Safety

  • 2009-2 BY YEAR:
2013 2012 2011 2010 2009 
 
This page last updated Friday, January 04, 2013


  • Board Recommendation:  from Vice Chairman John E. Mansfield to Secretary Chu, dated October 26, 2009. [PDF]
  • Department Response:  from Secretary Chu to Vice Chairman John E. Mansfield, dated February 2, 2010. [PDF]
  • Department Implementation Plan:  dated July 13, 2010. [PDF]
  • Contact Information



2013
  • January 3, 2013, Board letter establishing a 60-day reporting requirement for DOE senior leadership’s assessment of the current state of public and worker protection for seismic accident scenarios, and the risk reduction measures to be applied to mitigate near term seismic risks of the Plutonium Facility (PF-4) at Los Alamos National Laboratory.  [PDF]

2012
  • March 20, 2012, Department letter informing the Board of the completion of deliverable 5.4.4 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety. [PDF]
  • March 8, 2012, Board letter enclosing a copy of the Board’s Report to Congress on the Status of Significant Unresolved Issues with the Department of Energy's Design and Construction Projects. [PDF]
  • January 30, 2012, Department letter detailing the technical basis, actions taken to improve safety, and plans for safety improvements to continuously ensure adequate protection of public safety from operations at the Los Alamos National Laboratory's Plutonium Facility (PF-4). [PDF]

2011
  • November 15, 2011, Department letter informing the Board of completion of Commitment 5.2.3, and updating the completion date for Commitment 5.4.4 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility (PF-4) Seismic Safety [PDF]
  • September 29, 2011, Department letter transmitting deliverable 5.4.5, and requesting due date extensions for deliverables 5.2.3 and 5.4.4 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4) Seismic Safety. [PDF]
  • September 23, 2011, Board letter forwarding a copy of the Report to Congress on the Status of Significant Unresolved Issues with the Department of Energy Design and Construction Projects. [PDF]
  • July 20, 2011, Department letter requesting 60-day extension to complete Implementation Plan deliverables 5.2.3 and 5.4.4 of Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety [PDF]
  • June 28, 2011, Department letter forwarding deliverables 5.2.2 and 5.3.2 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety. [PDF]
  • June 15, 2011, Board letter forwarding a copy of the Report to Congress on the Status of Significant Unresolved Issues with the Department of Energy's Design and Construction Projects (dated June 15, 2011). [PDF]
  • June 8, 2011, Department letter requesting 30-day extension on two Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety, Implementation Plan deliverables. [PDF]
  • April 29, 2011, Department letter transmitting Deliverable 5.4.3 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety. [PDF]
  • April 1, 2011, Department letter transmitting Deliverable 5.4.2 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety. [PDF]
  • January 31, 2011, Department letter transmitting Deliverable 5.4.1 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety to the Board. [PDF]
  • January 7, 2011, Department letter transmitting deliverable 5.1 of IP for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety, documenting near-term actions completed to reduce consequences of a seismically-induced fire. [PDF]

2010
  • December 30, 2010, Board letter forwarding the Quarterly Report to Congress on the Status of Significant Unresolved Issues with the Department of Energy Design and Construction Projects. [PDF]
  • December 17, 2010, Board letter accepting the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • November 9, 2010, Department letter transmitting Deliverable 5.2.1 for the Implementation Plan for Board Recommendation 2009-2 Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • November 9, 2010, Department letter elaborating the process and criteria being used to evaluate control strategies for seismically-induced events for the Implementation Plan for Board Recommendation 2009-2 Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • September 30, 2010, Department letter transmitting Deliverable 5.3.1 for IP 2009-2 Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • September 3, 2010, Board letter forwarding a copy of the Report to Congress on the Status of Significant Unresolved Issues with the Department's Design and Construction Projects. [PDF]
  • August 25, 2010, Department letter concerning the Clarification on the Decision Logic and Criteria for the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • July 13, 2010, Department letter forwarding the Department's Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • June 3, 2010, Department letter requesting a 45-day extension to complete the Implementation Plan for Recommendation 2009-2. [PDF]
  • March 1, 2010, Federal Register publication of the Department's response to Board recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • February 2, 2010, Department letter accepting Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety, and providing key recent and near-term actions to improve facility safety at the LANL Plutonium Facility. [PDF]
  • January 20, 2010, Department letter requesting an extension to February 3, 2010 for responding to Board Recommendation 2009-2. [PDF]
  • January 6, 2010, Board letter responding to public comments on Recommendation 2009-2 (see letter posted on December 10, 2009). [PDF]

2009
  • December 10, 2009, Board letter forwarding Think Outside the Bomb organization comments on Board Recommendation 2009-2. [PDF]
  • November 6, 2009, Federal Register publication of DNFSB Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]
  • October 26, 2009, Board letter forwarding Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety[PDF]