Sludge treatment preparation at MASF
Sludge treatment training
Excavation beneath the K East fuel storage basin
Applying fixative to the site of the former K East fuel storage basin
110KE gas storage facility before demolition
Lifting the roof of the 117KE exhaust air filter building
110KE Gas Storage Facility during demolition
1706KE buildings during demolition
183.2KW Sedimentation Basin demolition
Inside bay 1 of the 183.2KW sedimentation basin
183KW chlorine vault slab demolition
183.2KW Sedimentation Basin debris removal
183KW chemical storage silo demolition
183KW Sedimentation Basin Complex before demolition
Entering the 183.2KW Sedimentation Basin
Demolition of K East fuel storage basin nears completion
Demolition of the K East fuel storage basin March 2009
K East fuel storage basin demolition May 2009
Removal of K East ion exchange and sand filters
Size reducing tools used in the K West Basin
K East core boring (May 2010)
183.1KW Headhouse demolition begins (Feb 2010)
183.1KW Headhouse after demolition (March 2010)
183.3KW Filter Basin demolition (April 2010)
183.6KW Lime Feeder Building during demoliion (April 2010)
Core boring at 4th location (June 2010)
183.3KW Filter Basin demolition (June 2010)
183.7KW Pipe Tunnel demolition
Remediation in the 100K Area (June 2010)
183KW Sedimentation Basin Demolition (April 2010)
Removing 183.1KW Headhouse substructures
Asbestos abatement in the lower 1706KE structures (June 2010)
Remains of the 116KE Reactor Exhaust Stack
Lowering the 116KE Reactor Exhaust Stack
Detonation at the base of 116KE Reactor Exhaust Stack
Placing explosives for the 116KE Reactor Exhaust Stack
Demolition of the 183KW Sedimentation Basin(December 2009)
Aerial of 183KW Sedimentation Basin (January 2010)
Close-up of 183KW Sedimentation Basin demolition (January 2010)
Demolition of the 183K West Filter Basin (April 2010)
Demoliton of the 183K West Sedimentation Basin (May 2010)
Remediation beneath the 183K West Headhouse (June 2010)
Demolition of the 183K West Sand Filter (June 2010)
Demolition of the 183K West Filter Basin (July 2010)
Demolition of the 183K West Sedimentation Basin (August 2010)
Aerial of 183K West Sedimentation Basin (September 2010)
Completing demolition of the 183KW Sedimentation Basin (October 2010)
Water truck at D&D of 183KW Sedimentation Basin (October 2010)
Last of the 183KW Sedimentation Basin D&D (October 2010)
Debris from the 183K West Sedimentation Basin (October 2010)
183KW Sedimentation Basin Complex after demolition (October 2010)
Demolition of 115KE building beings
Demolition of the 115KE Building continues
Demolishing the 115KE building
Aerial of the 100K-East Area (9-10-10)
183.7KW Pipe Tunnel during demolition
Removing soil beneath 183KW Headhouse
Opening a wall into the K East Reactor Building
117KE Exhaust Air Filter building before demolition
117KE filter removed
Demolition of 105-KE admin area
Silter barrier construction begins
Draining the K East sedimentation basins
100K Water Treatment Facility nears completion
K East sedimentation basins drained
Aerial of the 183KE Sedimentation Basins
Clearwell demolition begins
Removing an asbestos containment
Demolition of the K West Clearwell
K East Clearwell demolition
Equipment enters K East Clearwell
Northwest corner of the 183KE Sedimentation Basin
183-KE headhouse demolition
Clearwell D&D nearly complete
Headhouse debris loaded for disposal
Moving river pump casing
183KE sand filter demolition
Cutting casings from River Pump House
183KW Sand Filter demolition continues
KW River Pumphouse Demolition