Advanced Search
Applying fixative to the site of the former K East fuel storage basin
Sampling 200 North Area waste sites
Aerial survey of BC Control Area
Steel skeleton for the DX Groundwater Treatment Facility
Well pad construction in the 100 D Area
Remediation of the 600-40 waste site
Remediation in the BC Control Area April 2010
Removing 183.1KW Headhouse substructures
Seeding of BC Controlled Area Begins
Seeding of BC Control Area continues
Spraying seed at the BC Control Area
Seeding the BC Control Area
100-K-63 waste site sampling
Exterior of 200 West Groundwater Treatment Facility in April 2012
200W P&T Biological Process Building
200W P&T Process Building exterior
Bird’s Eye View of the 200 West Groundwater Treatment Facility
Radiological Building
Translucent panels for sustainable design
Managing construction of the 200 West Groundwater Treatment Facility
Energy-efficient translucent panels
Sustainable construction practices
Managing sustainable design and construction
Groundwater treatment facility operator training
200 West Pump and Treat Celebration
A random sampling of photo tags throughout the site.