Bonding high-density polyethylene piping for the DX Groundwater Treatment Facility
Installing lighting in DX Process Building
Protective transfer piping placed
Treatment tanks arrive for DX
Media visits DX facility
Loading HDPE piping for 200 West Groundwater Treatment Facility
200 West pump and treat transfer building excavation
Constructing a transfer building foundation (June 2010)
Fill project at 200 West pump and treat
200 West Pump & Treat steel construction 10-1-10
Concrete pouring for 200W pump and treat facility
Concrete for groundwater treatment facilities
Installing well in 200-ZP-1 operable unit
200 West Area aerial (8-13-10)
Tanks lifted for placement
Tank placed for pump and treat system
200 West Groundwater Treatment Facility Aerial 3-4-11
Construction of the Biological Process Building 3-11-11
200 West pump and treat 50 percent complete
Piping for a pump and treat
Equipment moved into pump and treat facility
Concrete placed for lime stabilization building
Piping supports for pump and treat
Piping and steel for Biological Treatment Pad
Blower motors for 200 West Groundwater Treatment Facility
Overhead crane rails installed for pump and treat system
HX Construction site July 2010
100-HX concrete slab
100-HX construction Oct 2010
100-hx resin trains
100-HX monitoring device
200W groundwater treatment facility exterior
Exterior of 200 West Groundwater Treatment Facility in August 2011
Vapor off-gas assembly
Exterior of 200 West Groundwater Treatment Facility in April 2012
200W P&T Biological Process Building
200W P&T Process Building exterior
Bird’s Eye View of the 200 West Groundwater Treatment Facility
Radiological Building
Translucent panels for sustainable design
Managing construction of the 200 West Groundwater Treatment Facility
Energy-efficient translucent panels
Sustainable construction practices
Managing sustainable design and construction
Groundwater treatment facility operator training
Closeup of groundwater treatment resin
New resin delivers savings
Engineers optimize groundwater treatment
200 West Pump and Treat Celebration