![DOT logo](https://webarchive.library.unt.edu/web/20130228042941im_/http://www.volpe.dot.gov/sbir/images/dot.gif)
U.S. Department of Transportation
Office of the Secretary
of Transportation
Previous Section | Program Contents | Next Section
Phase I research topics for DOT Operating Administrations are listed below. These topics indicate the specific areas for which proposals are to be considered for acceptance by DOT. The topics are not listed in any order of priority. Each proposal must respond to one (and only one) topic as described in this section. A proposal may, however, indicate and describe its relevance to other topics.
05-FH11 | Compact Laser Shearography System for Crack Detection |
05-FH21 | Low Cost Workzone Collision Warning System |
05-FH31 | Accurate Measurement of Signature, Speed, Acceleration and Jerk (SSAJ) with inductive loops for Intersection Collision Avoidance (ICA), Red Light Running Prevention (RLRP) Systems and Origin Destination (O-D) |
1 Phase I may be up to $96,000 and Phase II may be up to $720,00
05-RT1 | Use of Remotely Piloted Vehicles (RPV) to conduct traffic analysis audits for transportation management systems |
05-RT2 | Use of Remotely Piloted Vehicles (RPV) - Zeppelins to create "as built" plans for transportation infrastructures and roadway inventory |
05-RT3 | Use of Remotely Piloted Vehicles (RPV) - to create "as built" plans for transportation infrastructures and roadway inventory for improved maintenance, and emergency preparedness and management |
05-PH1 | Innovative Safety, Reliability and Inspection Technologies for Pipeline Safety |
05-FA1 | Development of a low cost, voice activated cockpit for General Aviation (GA) aircraft and helicopters for use in Precision Visual Flight Rules (PVFR) operations. |