1 NPD RESERVOIR CONTROL CENTER PROJECT- CGR COUGAR DAM HOURLY OPERATION DATA REPORT Friday March 1, 2013 GROSS STA ------ OUTFLOW ------ EL AT POWERHOUSE AVG SUPR UNIT STATUS GEN USE -- IN KCFS -- IN FEET + MSL HEAD CAP ON ON MW MW TOTAL POWER SPILL FOREBAY TAILWATR FT MW RMT LINE AVL 1 0 0.46 0.46 0.00 1574.20 1253.00 321.20 2 0 0.47 0.46 0.00 479.84 1253.01 -773.17 3 0 0.47 0.47 0.00 1574.37 1253.01 321.36 4 0 0.47 0.47 0.00 1574.46 1253.03 321.43 5 0 0.47 0.47 0.00 1574.55 1252.97 321.58 6 0 0.47 0.47 0.00 1574.65 1253.00 321.65 7 0 0.47 0.47 0.00 1574.72 1252.99 321.73 8 0 0.47 0.47 0.00 1574.81 1253.00 321.81 9 0 0.47 0.47 0.00 1574.90 1252.99 321.91 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TOT 0 AVG 0 0.47 0.47 0.00 1452.94 1253.00 199.94 MAX 0.47 0.47 0.00 1574.90 1253.03 321.91 MIN 0.46 0.46 0.00 479.84 1252.97 -773.17