|
Hurricane & Storm Damage Risk Reduction |
|
Existing Pump Station Repair Area Wide (July 2008)
Work Description
- Repair existing pump stations
- Install storm proofing measures at existing pump stations
- Install SCADA system for ICS temporary pumps
- Install generator at PS#6
- Install temporary pumps
|
|
Repairs |
Projects |
30 |
Complete |
18 |
In Construction |
8 |
In Design |
4 |
Prepping for P & S |
0 |
|
Contact
Webmaster
504-862-1606
webmaster-mvn@usace.army.mil
Updated 8/29/2011
|
|