Obligated High Speed Intercity Passenger Rail Funding by Region

The Federal Railroad Administration, along with its 33 state partners and the District of Columbia, is laying the foundation for a 21st century passenger rail network. With $10.1 billion in federal funding available through the High-Speed Intercity Passenger Rail Program, they are moving forward with 152 planning and construction projects.

To date, 50 construction projects in 19 states and the District of Columbia worth more than $3.2 billion are either complete, under construction, or set to begin construction within 6 months. 

 

All Regions

RegionStateFunding SourceProject NameProject CorridorProject SummaryObligated FRA Funding
Gulf AL FY 2009 New Passenger Rail Service in Alabama Other Projects Completion of a feasibility study to restore intercity passenger rail service from Birmingham to Montgomery to Mobile, AL.  $100,000
Heartland KS FY 2009 Kansas Service Development Plan (SDP)          Other Projects This project plans for new service between Kansas City, MO, Oklahoma City and points south.  $250,000
Heartland KS FY 2010 Lawrence: PE and FD for Station Improvements Other Projects This project completes the prerequisite engineering needed to renovate the Lawrence, KS station.  $87,563
Heartland OK FY 2010 Oklahoma City Depot Control Signaling and Power Switch Installment Other Projects This project funds the construction of a track extension and installation of new signal and power switches that will allow the Heartland Flyer to exit the Oklahoma City station without having to make a reverse move.   $1,660,793
Heartland OK FY 2010 Oklahoma State Rail Plan Other Projects This project funds the completion of updates to Oklahoma's 1992 State Rail Plan to meet the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements.  $375,000
Heartland OK FY 2010 Tulsa-Oklahoma City Corridor Plan Other Projects This project is for the completion of a Service Development Plan and corridor environmental study for the Tulsa-Oklahoma City segment of the South Central High-Speed Rail Corridor.  $2,242,050
Heartland TX ARRA Crossing Signal Timing, Burlington Northern Santa Fe Fort Worth Sub         Other Projects This project funds final design and construction of signal timing improvements at grade crossings between Fort Worth and the TX/OK border to increase the operating speed of Amtrak's Heartland Flyer. Speed of the line will be increased from 55 mph to 79 mph.  $3,467,877
Heartland TX ARRA Dallas - Fort Worth to Houston Core Express Service Other Projects This project is for the preliminary engineering and project-level environmental analysis necessary to develop a new Core Express corridor from Dallas - Fort Worth to Houston, two of the largest metropolitan areas in the country.   $15,000,000
Heartland TX FY 2010 Oklahoma City-South Texas Corridor Plan Other Projects This project funds the completion of feasibility studies, a service development plan, and environmental work for the designated high-speed rail corridor of Oklahoma City to Dallas/Ft. Worth, with a potential extension to Austin and San Antonio.  $5,600,000
Midwest IA FY 2009 Chicago to Omaha Passenger Rail Planning Chicago - Iowa City - Omaha The project plans for future service between Chicago and Omaha.  $1,000,000
Midwest IA FY 2010 Iowa State Rail Plan Other Projects This project completes the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration   $400,000
Midwest IA ARRA Ottumwa Sub Crossover Improvements          Other Projects The project reduces delays on long distance trains between Chicago and points west.  $17,309,080
Midwest IL ARRA Englewood Flyover Chicago - Detroit - Pontiac This project reduces delays on commuter and intercity trains arriving in Chicago from all points south and east.  $125,986,998
Midwest IL FY 2010 Chicago-Iowa City New Corridor Service Chicago - Iowa City - Omaha This project will allow for new service between Chicago and Iowa City.  $177,280,000
Midwest IL FY 2009 Chicago to St. Louis Double Track NEPA           Chicago - St. Louis This project completes the prerequisite engineering to double track the corridor that will further reduce trip times and allow for more frequent service.  $1,250,000
Midwest IL ARRA Chicago to St. Louis HSR Chicago - St. Louis This project reduces trip times by 1 hour, improves on-time reliability, and replaces trains.  $1,142,324,000
Midwest IL FY 2010 IL-Chicago-St. Louis Corridor Supplement SDP Chicago - St. Louis Necessary funding to complete "Chicago to St. Louis HSR" funded through ARRA.  $186,380,000
Midwest IL FY 2009 Wadsworth Bridge Replacement Other Projects This project reduces delays on intercity service between Milwaukee and Chicago.  $3,710,960
Midwest IL ARRA Next Generation Passenger Rail Equipment Purchase Regional Equipment Pool New trains for Midwest corridors  $268,201,084
Midwest IN ARRA Indiana Gateway Corridor Chicago - Detroit - Pontiac This project reduces delays for passengers traveling between Chicago and Michigan.  $71,364,980
Midwest MI ARRA Ann Arbor Station Project Chicago - Detroit - Pontiac This project is for the completion of preliminary engineering and environmental documentation required to design and construct a new high-speed rail station in Ann Arbor, MI to serve the Chicago to Detroit high-speed rail line.  $2,806,400
Midwest MI ARRA Chicago to Detroit Corridor: Battle Creek, MI Station Chicago - Detroit - Pontiac The project includes station improvements that are compliant with the American Disability Act.  $3,620,552
Midwest MI ARRA Chicago to Detroit Corridor: Dearborn, MI Station Chicago - Detroit - Pontiac The project will consolidate Dearborn’s two passenger rail facilities into a new station in the West Downtown section of the city.   $28,204,450
Midwest MI ARRA Chicago to Detroit Corridor: Troy, MI Station Chicago - Detroit - Pontiac The goal of this Project is to relocate an underutilized Amtrak station from Birmingham to a more accessible site located in the city of Troy.  $8,485,212
Midwest MI FY 2010 Chicago-Detroit HSR Corridor Plan Chicago - Detroit - Pontiac This project funds completion of a Service Development Plan and corridor environmental study for the Chicago Hub (Chicago to Detroit/Pontiac) High-Speed Rail Corridor.  $3,200,000
Midwest MI FY 2010 Kalamazoo-Dearborn Corridor Development Chicago - Detroit - Pontiac This funds the acquisition of the Kalamazoo-Dearborn segment from Norfolk Southern and improvements to the line required as a condition of the sale.  $150,000,000
Midwest MI ARRA Kalamazoo-Dearborn Service Development Program 2 Chicago - Detroit - Pontiac The project provides for major construction to rehabilitate track and signal systems on the Chicago-Detroit corridor. The project also includes the purchase of an approximately 135-mile segment of the line between Dearborn and Kalamazoo.  $196,503,208
Midwest MI FY 2009 West Detroit Rail Improvements Chicago - Detroit - Pontiac This project will fund the installation of centralized traffic control signals, the construction of 1.34 miles of new connection track, the replacement of a bridge over Junction Avenue, and the relocation of approximately 0.86 track miles of existing CSAO tracks.  $7,912,773
Midwest MN ARRA Northern Lights Express  Other Projects This project continues environmental work and preliminary engineering on the proposed Northern Lights Express, a 155 mile-long high-speed intercity passenger rail corridor that will connect Minneapolis and Duluth, MN with 110 mph service.    $5,000,000
Midwest MN FY 2010 Union Depot Multi-Modal Transit Hub Other Projects This project is for construction to rehabilitate the historic St. Paul Union Depot as a multimodal hub for intercity rail, future high-speed rail, local rail and bus transit, and pedestrian, bicycle, taxi, and other local modes of access.   $40,000,000
Midwest MN FY 2009 Wisconsin Service NEPA Other Projects This project is for completion of planning studies evaluating the alignment for the extension of the Chicago Hub High-Speed Rail corridor to Minneapolis/St. Paul.  $600,000
Midwest MO ARRA Merchant’s Bridge Replacement Chicago - St. Louis This project will advance the design of a new bridge to replace the existing bridge built in 1890 over the Mississippi River on the existing Chicago - St. Louis Corridor.   $13,500,000
Midwest MO FY 2010 Missouri State Rail Plan Other Projects This project funds completion of a State Rail Plan, which will compile, synthesize, plan, reorganize, and map out a course for the future of all railroads in Missouri.  $500,000
Midwest MO ARRA Kansas City to St Louis Corridor: Bonnots Mill Universal Crossover St. Louis - Kansas City This project funds completion of preliminary engineering and project-level NEPA (environmental) work for a new universal crossover at Bonnots Mill, MO on the Union Pacific Jefferson City subdivision.   $611,200
Midwest MO ARRA Kansas City to St Louis Corridor: Double Track Lee’s Summit to Pleasant Hill St. Louis - Kansas City This project funds completion of preliminary engineering and project-level NEPA (environmental) work for the construction of a connection of two existing sidings between Lee’s Summit, MO and Pleasant Hill, MO and lay a second track next to the main line track that will accommodate 90 mph Amtrak service.   $1,418,800
Midwest MO ARRA Kansas City to St Louis Corridor: Hermann Universal Crossover St. Louis - Kansas City This project funds completion of preliminary engineering and project-level NEPA (environmental) work for a new universal crossover at Hermann, MO on the Union Pacific Jefferson City subdivision.   $570,000
Midwest MO ARRA Kansas City to St Louis Corridor: Kingsville Passing Siding    St. Louis - Kansas City This project is for completion of preliminary engineering and project-level NEPA (environmental) work for the construction of a two-mile siding addition with one public crossing.   $958,800
Midwest MO ARRA Kansas City to St Louis Corridor: Knob Noster Passing Siding Extension St. Louis - Kansas City This project funds completion of project-level NEPA (environmental) work for adding 9,000 feet of siding to the 28-mile segment.   $836,800
Midwest MO ARRA Kansas City to St Louis Corridor: Missouri Rail Crossing Safety Improvements St. Louis - Kansas City The project improves 15 highway/rail at-grade crossings on the Union Pacific Railroad between Sedalia and Kansas City, Missouri. Thirteen crossings will receive lights and gates, and two crossings will be closed.  $1,920,000
Midwest MO ARRA Kansas City to St Louis Corridor: Rail Bridge over Osage River St. Louis - Kansas City The project constructs a second railroad river bridge over the Osage River, which is currently single tracked, and installs double track for approximately 0.5 miles on both sides of the bridge.   $22,640,000
Midwest MO ARRA Kansas City to St Louis Corridor: Strasburg Grade Separation St. Louis - Kansas City This project is for completion of preliminary engineering and project-level NEPA (environmental) work for the removal of an at-grade state Route E crossing from the existing siding and main track in Strasbourg, MO, and replace it with a grade separation approximately 0.1 mile to the west.   $850,000
Midwest MO ARRA Kansas City to St Louis Corridor: Webster Universal Crossover St. Louis - Kansas City This project funds construction of a universal crossover at the Kirkwood Junction on the Union Pacific Jefferson City Subdivision.   $2,340,305
Midwest MO FY 2010 St. Louis Third Main Track Construction St. Louis - Kansas City This project is for Construction of a new 10,000-foot third main track with switches, signal, and switch upgrades to improve access to the Gateway Multimodal Center station.  $3,608,640
Midwest WI ARRA Chicago to Milwaukee Corridor: Milwaukee Station Platform Other Projects The project increases the length of the platform at the Milwaukee Airport Railroad Station and extends platform canopies for ADA compliance.  $678,021
Midwest WI ARRA Chicago to Milwaukee Corridor: Truesdell Crossovers Other Projects The project installs one universal crossover and one single crossover on the intercity rail corridor between Chicago and Milwaukee, which minimize delays to passenger and freight trains.   $11,074,934
Mountain West CO FY 2009 Colorado State Rail Plan Other Projects This project completes the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements.  $400,000
Mountain West CO FY 2009 Denver Interregional Connectivity Study Other Projects This project completes a connectivity study of passenger rail to other modes in Denver.  $1,000,000
Mountain West ID FY 2010 Idaho State Rail Plan Other Projects This project completes the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration   $200,000
Mountain West NM FY 2009 New Mexico State Rail Plan Other Projects This project funds the creation of a Statewide New Mexico Rail Plan studying intercity passenger rail in New Mexico, specifically the existing Southwest Chief and the Sunset Limited (both Amtrak services).  $100,000
Northeast Amtrak ARRA NEC Power, Signal, Track, Catenary Improvements Northeast Corridor (DC - NYC - Boston) This project will replace and modernizes the power and signaling system on the Northeast Corridor in NJ.  $449,944,000
Northeast CT ARRA New Haven - Springfield Track Construction New Haven - Springfield - St. Albans This project  adds track capacity to reduce delays on The Vermonter service, as well as Springfield to New Haven service.  $30,000,000
Northeast CT ARRA New Haven to Hartford to Springfield Corridor New Haven - Springfield - St. Albans This project  adds track capacity to reduce delays on The Vermonter service, as well as Springfield to New Haven service.  $40,000,000
Northeast CT FY 2010 New Haven-Springfield New Haven - Springfield - St. Albans This project  adds track capacity to reduce delays on The Vermonter service, as well as Springfield to New Haven service.  $120,900,000
Northeast DC FY 2009 Union Station Access Improvements (Track 4) Northeast Corridor (DC - NYC - Boston) This project installs new escalator at Union Station.  $4,270,500
Northeast DE FY 2010 Northeast Corridor Third Track Installment Northeast Corridor (DC - NYC - Boston) This project installs a third track to expand capacity and reduce delays on the Northeast Corridor and SEPTA commuter rail service.  $13,300,000
Northeast DE FY 2009 Delaware Intercity Rail Connection           Other Projects The project evaluates new passenger service to Delaware, Maryland and Virginia destinations.  $450,000
Northeast MA ARRA Knowledge Corridor - Restore Vermonter New Haven - Springfield - St. Albans This project will restore Vermonter service to a more direct route, reducing trip times to New York City.  $72,800,000
Northeast MA FY 2010 Boston South Station Expansion Project Northeast Corridor (DC - NYC - Boston) This project completes the prerequisite engineering needed to expand the Boston South Street station to accommodate more trains and new development in surrounding neighborhood.  $32,500,000
Northeast MD ARRA B&P Tunnel Northeast Corridor (DC - NYC - Boston) The project completes prerequisite engineering to replace Civil War era tunnel through Baltimore on Northeast Corridor.  $60,000,000
Northeast MD ARRA Baltimore-Washington International Airport Station Improvements Northeast Corridor (DC - NYC - Boston) The project completes prerequisite engineering to reduce delays near the BWI station and expand the station.  $9,400,000
Northeast MD ARRA NEC Bridge Replacement Northeast Corridor (DC - NYC - Boston) The project completes prerequisite engineering to replace the Susquehanna River bridge that will reduce delays and add new capacity to the Northeast Corridor north of Baltimore.  $22,000,000
Northeast ME FY 2010 Boston-Portland Corridor Plan Boston - Portland - Brunswick The project will examine further expansion of service in Maine.  $600,000
Northeast ME ARRA Downeaster Portland North Project Boston - Portland - Brunswick The project expands Downeaster service from Boston via New Hampshire to Freeport and Brunswick, ME.  $38,385,495
Northeast ME ARRA Downeaster Track Improvements Boston - Portland - Brunswick The project will reduce delays for Downeaster and MBTA Commuter trains arriving in Boston.  $20,822,341
Northeast NH FY 2010 Boston-Concord Corridor Plan Other Projects This project is for preparation of a Service Development Plan and environmental documentation for the Boston-Concord corridor.  $2,240,000
Northeast NJ ARRA Portal Bridge Northeast Corridor (DC - NYC - Boston) This project is for final design for the replacement of the 100-year-old swing-bridge with a 3-track, fixed span bridge along the NEC spanning the Hackensack River. The project also includes the final design of new track/interlockings and reconfiguration of existing track/interlockings east and west of the bridge.   $38,500,000
Northeast NY ARRA Empire Corridor Capacity Improvements New York City - Albany - Buffalo - Niagara Falls This project is for final design and construction of three interrelated upgrades to track, stations, and signals designed to improve operations along the Empire Corridor.  $58,131,756
Northeast NY FY 2009 Empire Corridor Planning New York City - Albany - Buffalo - Niagara Falls This project will fund the development of a Service Development Plan (SDP) and a Tier 1 Service Level Programmatic Draft Environmental Impact Statement (PDEIS) for high-speed rail enhancements throughout the Empire Corridor, particularly between Albany, NY and Niagara Falls, NY, with a goal of introducing passenger train speeds of up to 110 mph between Schenectady and Buffalo, NY.  $1,000,000
Northeast NY ARRA Empire Corridor South: Albany to Schenectady 2nd Track New York City - Albany - Buffalo - Niagara Falls The project constructs a second mainline track between Albany-Rensselaer Station and Schenectady Station (approximately 20 miles), A second mainline track between these stations will increase reliability, reduce delays, and reduce travel times for intercity rail passengers using Amtrak’s Empire Service, Adirondack, Ethan Allen Express, and Lake Shore Limited services. .   $91,200,000
Northeast NY ARRA Empire Corridor South: Grade Crossing Improvements - CSXT Milepost 75 to 143 New York City - Albany - Buffalo - Niagara Falls The project improves 12 highway-rail grade crossings on the Empire Corridor between Poughkeepsie and Stuyvesant, New York. The grade crossings will receive improved warning devices.   $2,450,000
Northeast NY ARRA Empire Corridor West: Buffalo-Depew Station Improvement       New York City - Albany - Buffalo - Niagara Falls The project makes repairs and ADA improvements to the station building, parking lot, and platform.  $770,668
Northeast NY ARRA Empire Corridor West: Rochester Station Improvement           New York City - Albany - Buffalo - Niagara Falls The project funds necessary improvements to ensure compliance with the Americans with Disabilities Act (ADA) at the existing Rochester Station.   $1,500,000
Northeast NY FY 2010 Hudson Subdivision Signal Reliability New York City - Albany - Buffalo - Niagara Falls This project will replace old signal pole lines (for electric power to signals and communication lines) with underground cable between Poughkeepsie, NY and near Redhook, NY on the Empire Corridor.  $7,913,687
Northeast NY FY 2010 Livingston Avenue: PE/NEPA for Bridge Replacement New York City - Albany - Buffalo - Niagara Falls This project will fund the completion of environmental studies/analysis and preliminary engineering required to replace the Livingston Avenue Bridge, which is nearing the end of its serviceable life.  $2,000,000
Northeast NY ARRA Niagara Falls Inspection and Maintenance Facility New York City - Albany - Buffalo - Niagara Falls The project funds the prerequisite environmental studies to build a maintenance facility in Western New York to support increased service.  $1,750,000
Northeast NY ARRA Rochester Station and Track Improvements New York City - Albany - Buffalo - Niagara Falls This project is for preliminary engineering and environmental analysis for a new Rochester Intermodal Station on the Empire Corridor, which will connect passengers with additional transit and pedestrian options.   $1,400,000
Northeast NY ARRA Moynihan Station Northeast Corridor (DC - NYC - Boston) This project begins construction on the Moynihan Station project, which will expand capacity and allow for more trains to reach Midtown Manhattan.  $30,000,000
Northeast NY ARRA NEC Harold Interlocking Amtrak Bypass Routes Northeast Corridor (DC - NYC - Boston) This project will result in new, conflict-free routes, which will allow Amtrak trains between New York and Boston to bypass the interlocking, a major source of delay on this segment of the Northeast Corridor (NEC). The project will reduce trip times, while increasing schedule reliability on the corridor.  $294,781,579
Northeast NY ARRA Adirondack Corridor: Ballston Spa Capacity Improvements Other Projects The project includes the final design and construction of 2.27 miles of double track on a portion of Canadian Pacific’s rail line near Saratoga Springs, New York.  $3,318,333
Northeast PA ARRA Keystone Corridor Interlocking Improvements Philadelphia - Harrisburg - Pittsburgh This project is for the final design and construction of an upgraded "State" interlocking near Harrisburg, PA on the Keystone Corridor - a passenger rail corridor already operating at110 mph.  The rebuilding of this interlocking will further decrease trip time on the corridor, increase on-time performance, and improve service reliability.    $40,000,000
Northeast PA ARRA Keystone Corridor: Automatic Block Signaling/Central Control            Philadelphia - Harrisburg - Pittsburgh This project funds the completion of preliminary engineering and project-level NEPA (environmental) work for the installation of Automatic Block Signaling and Centralized Traffic Control on a segment of the Amtrak-owned Philadelphia-Harrisburg Keystone Corridor.   $1,350,000
Northeast PA ARRA Keystone Corridor: Grade Crossings           Philadelphia - Harrisburg - Pittsburgh The project funds final design and construction to eliminate the last three public grade crossings on the Amtrak-owned Philadelphia-Harrisburg Keystone Corridor, which will improve safety and allow future train speeds to increase from 110 mph to 125 mph.  $18,000,000
Northeast PA ARRA Keystone Corridor: Interlocking Design         Philadelphia - Harrisburg - Pittsburgh This project funds the completion of preliminary engineering and project-level NEPA (environmental) work for the replacement and reconfiguration of several major interlockings along the Amtrak-owned Philadelphia-Harrisburg Keystone Corridor.   $6,300,000
Northeast PA FY 2009 Keystone Corridor: Keystone West        Philadelphia - Harrisburg - Pittsburgh This project is for planning for the potential extension of Keystone Corridor services west of Harrisburg to Pittsburgh.  $750,000
Northeast RI ARRA Kingston Capacity and Track Improvements        Northeast Corridor (DC - NYC - Boston) This project funds completion of preliminary engineering and project-level NEPA (environmental) work for the installation of two miles of third main track and construction of a second station platform at Kingston, RI on the Amtrak-owned north-end of the Northeast Corridor.  $1,200,000
Northeast RI ARRA NEC Kingston Track, Platform Improvements Northeast Corridor (DC - NYC - Boston) This project funds completion of National Environmental Policy Act (NEPA) analysis, final design and construction of an additional 1.5 miles of an electrified third track in Kingston, Rhode Island on a heavily used portion of the Northeast Corridor (NEC). The project also includes construction of a high-speed rail interlocking and related upgrades to the existing Kingston infrastructure, and high-level passenger platforms.  $25,000,000
Northeast RI ARRA NEC Providence Station Improvements Northeast Corridor (DC - NYC - Boston) This project is for the completion of preliminary engineering (PE) and National Environmental Policy Act (NEPA) analysis required to support further design and construction work activities at the existing Providence Station in Rhode Island.   $3,000,000
Northeast VT ARRA Vermonter New England Central Railroad Route Improvements New Haven - Springfield - St. Albans The project will improve 190 miles of track between St. Albans and Vernon on Vermonter corridor.   $52,722,258
Northeast VT FY 2009 NY-VT Bi-State Intercity Passenger Rail Project         Other Projects This project will fund the planning for a proposed rerouting of the New York to Rutland, VT Ethan Allen Express service from the existing Albany to Whitehall, NY to Rutland route to an Albany - Bennington, VT - Rutland route.   $500,000
Pacific Northwest OR ARRA Eugene Station Stub Tracks  Eugene - Portland - Seattle - Vancouver BC This project will complete preliminary engineering and environmental documentation on track stubs that will permit overnight layovers of Amtrak Cascades passenger trains at the Eugene, OR station.   $1,500,000
Pacific Northwest OR FY 2010 Eugene-Portland Corridor Plan Eugene - Portland - Seattle - Vancouver BC This project will fund the completion of a Service Development Plan and corridor environmental study for the Eugene to Portland, OR corridor, expanding the Amtrak Cascades service.  $4,200,000
Pacific Northwest OR ARRA Pacific Northwest Corridor: North Portland Jcts Eugene - Portland - Seattle - Vancouver BC This project funds the completion of preliminary engineering and project-level NEPA (environmental) work for a project to provide a new connection between the UP and BNSF track in North Portland, and establish an interface between the two CTC systems.  $1,288,805
Pacific Northwest OR ARRA Pacific Northwest Corridor: Union Station Roof Eugene - Portland - Seattle - Vancouver BC The project repairs the roof and makes other structural improvements to the multimodal station in Portland.   $7,240,582
Pacific Northwest OR ARRA Pacific Northwest Corridor: Willbridge Eugene - Portland - Seattle - Vancouver BC This project will fund the completion of preliminary engineering and project-level NEPA (environmental) work to replace hand-thrown switches with powered turnouts and crossovers.   $500,000
Pacific Northwest OR FY 2010 Union Station: Structural Improvements, Track Improvements Eugene - Portland - Seattle - Vancouver BC This project is for the preliminary engineering /environmental analysis for the renovation of historic Union Station and track improvements that will increase train speed and throughput.  $3,967,243
Pacific Northwest OR FY 2010 Oregon State Rail Plan Other Projects This project will fund the completion of an update to Oregon's 2001 State Rail Plan.  $800,000
Pacific Northwest WA FY 2010 King Street Station Rehabilitation Eugene - Portland - Seattle - Vancouver BC The project is one phase of the King Street Station Seismic Retrofit Project, and includes installation of seismic steel to the Main Hall and clock tower, interior and exterior restoration work, improved public access to the Main Hall, and installation of upgraded mechanical, electrical, plumbing systems.  $16,685,752
Pacific Northwest WA FY 2009 Mount Vernon Siding Extension Eugene - Portland - Seattle - Vancouver BC This project reduces delays between Seattle, WA and Vancouver, BC.  $3,258,836
Pacific Northwest WA ARRA Port of Vancouver Grade Separation Eugene - Portland - Seattle - Vancouver BC This project includes construction of a grade-separated railroad crossing for the Pacific Northwest Rail Corridor (PNWRC) over the freight rail mainline serving the Port of Vancouver.   $15,000,000
Pacific Northwest WA ARRA Portland - Seattle - Vancouver Eugene - Portland - Seattle - Vancouver BC This project reroutes existing service and constructing bypass tracks to allow for 79mph maximum speed and 6 daily round trips.  $751,575,100
Pacific Northwest WA FY 2009 Tukwila Station Construction Eugene - Portland - Seattle - Vancouver BC This project will fund the construction of a new station at the existing Tukwila Station in Tukwila, Washington that will be used by Sound Transit commuter trains and Amtrak Cascades intercity trains.  $7,930,850
Pacific Northwest WA FY 2010 Washington State Rail Plan Other Projects This project will fund the development of a comprehensive State Rail Plan that combines and updates the state's current Freight Rail Plan and Passenger Rail Plan.  $400,000
Southeast DC ARRA Long Bridge Preliminary Engineering-NEPA Study Charlotte - Raleigh - Richmond - Washington DC This project completes the prerequisite engineering to replace the rail bridge across the Potomac River.  $2,900,000
Southeast GA FY 2009 Atlanta to Birmingham Feasibility Study           Other Projects The project examines the feasibility of expanded intercity passenger service between Birmingham and Atlanta.   $250,000
Southeast GA FY 2010 Charlotte-Atlanta Corridor Plan Other Projects The project examines the feasibility of expanded service between Charlotte and Atlanta.  $4,100,000
Southeast GA FY 2009 Interstate Rail Passenger Network Compact          Other Projects The project examines the feasibility of new service from Atlanta through Nashville and Louisville.  $250,000
Southeast GA FY 2009 Macon to Jacksonville Feasibility Study           Other Projects The project examines the feasibility of new service from Macon through Jacksonville (to be combined with previously completed report of Atlanta to Macon service expansion)  $250,000
Southeast NC ARRA Charlotte to Richmond Service Enhancement  Charlotte - Raleigh - Richmond - Washington DC This project will complete the project-level environmental review for the Richmond to Raleigh section of the Southeast High Speed Rail Corridor (SEHSR).   $4,000,000
Southeast NC ARRA Congestion Mitigation Charlotte - Raleigh - Richmond - Washington DC This project reduces delays for passengers traveling from Raleigh to points north.  $26,560,839
Southeast NC ARRA Piedmont Corridor 3rd & 4th Frequencies Charlotte - Raleigh - Richmond - Washington DC These projects include station upgrades at Cary Depot and High Point Stations and maintenance facility improvements at Capital Yards in Raleigh.  $520,000,000
Southeast NC FY 2010 Piedmont Corridor, Phase I: Charlotte Station and Grade Separation Program Charlotte - Raleigh - Richmond - Washington DC This project funds preliminary engineering, environmental review, equipment procurement and rehabilitation, stations and facilities improvements, and construction to advance the development of two additional Raleigh-Charlotte frequencies for a total of four.   $22,000,000
Southeast VA ARRA Arkendale to Powell's Creek Third Track Charlotte - Raleigh - Richmond - Washington DC This project will reduce delays and support more frequent service between DC and Richmond in the future.  $74,840,119
Southeast VA FY 2010 Richmond-DC: PE/NEPA Completion Charlotte - Raleigh - Richmond - Washington DC This project funds the completion of project environmental studies/analysis and preliminary engineering for the Richmond, VA - Washington D.C. segment of the Southeast high-speed rail corridor.  $44,308,000
Southeast WV FY 2009 West Virginia HSIPR Planning Other Projects This project funds a feasibility study for the development of a high speed rail network within the State of West Virginia.   $1,000,000
Southwest CA FY 2010 Central Valley HSR: Fresno-Bakersfield or Merced-Fresno CA - High-Speed Rail This project is part of the initial construction segment that will serve as the backbone of the California High-Speed Train.  $715,000,000
Southwest CA ARRA and FY10 Initial Central Valley Construction Project Extension CA - High-Speed Rail This project is part of the initial construction segment that will serve as the backbone of the California High-Speed Train.  $300,000,000
Southwest CA ARRA Phase 1 HSR Program - PE/NEPA/CEQAs and Fresno/Bakersfield HSR Design/Build  CA - High-Speed Rail This project is part of the initial construction segment that will serve as the backbone of the California High-Speed Train.  $2,866,176,231
Southwest CA FY 2010 San Francisco-San Jose HSR CA - High-Speed Rail This project develops requirements for signaling system needed for commuter and high-speed train service between San Jose and San Francisco.  $16,000,000
Southwest CA FY 2010 Bakersfield-Oakland-Sacramento (San Joaquin) Corridor Plan Existing CA This project completes a Service Development Plan and environmental study for future service expansion on the San Joaquin Corridor.  $300,000
Southwest CA ARRA Cab Car Bicycle Storage (Rolling Stock) Existing CA This project modifies first-generation California-owned passenger cars to include more storage space for bikes and other luggage.  $8,230,000
Southwest CA ARRA Capitol Corridor: South Terminal Station Improvement           Existing CA The project includes construction of two new platforms and other operational improvements to allow more trains to move through San Jose Diridon Station.   $18,000,000
Southwest CA FY 2009 Capitol Corridor: Track Relocation Existing CA This project moves tracks in Sacramento that will allow for the development of a state of the art regional transportation center.  $6,200,000
Southwest CA ARRA Capitol Corridor-YoloXover (Yolo West Crossover) Existing CA The project will reduce delays due to freight train conflicts on the Capitol Corridor  $4,854,369
Southwest CA FY 2010 Del Mar: PE/NEPA for Second Track, Bridge, Signal Improvements Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays north of San Diego.  $7,000,000
Southwest CA ARRA Locomotive Emissions Upgrade (Rolling Stock) Existing CA This project modernizes emissions controls on eight locomotives.   $13,295,511
Southwest CA ARRA Los Angeles to Fullerton Triple Track Existing CA The project is the seventh of the eight phases capacity expansion project that will allow for more frequent commuter and intercity train service from San Diego and Orange Counties to Los Angeles.  $38,055,875
Southwest CA FY 2010 Los Angeles-San Francisco Corridor Plan Existing CA This project completes a Service Development Plan and environmental study for the California Pacific Coast Corridor, which currently hosts Amtrak long distance service from Seattle.  $300,000
Southwest CA FY 2010 Los Angeles-San Luis Obispo Corridor Plan Existing CA This project completes a Service Development Plan and corridor environmental study for future service expansion of Pacific Surfliner between Los Angeles and San Luis Obispo.   $1,360,000
Southwest CA FY 2009 Moorpark-San Onofre Signal and Communication System Improvements Existing CA This project installs new signalling equipment that will improve safety of trains in Southern California.  $13,500,000
Southwest CA FY 2010 Oceanside: PE/NEPA for Bridge Replacement with Double Track Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays north of San Diego.  $4,000,000
Southwest CA ARRA Pacific Surfliner Corridor: MOW Spurs Existing CA This project will reduce delays for commuter and intercity trains from San Diego and Orange Counties due to maintenance  $1,720,000
Southwest CA ARRA Pacific Surfliner Corridor: Oceanside Stub Project Existing CA This project will reduce passenger train delays by allowing them to move around freight trains north of San Diego.  $3,400,000
Southwest CA ARRA Pacific Surfliner Corridor: Ortega PE/NEPA Existing CA This project will add capacity near Santa Barbara that will reduce delays and improve the on-time performance of train service.  $950,000
Southwest CA ARRA Pacific Surfliner Corridor: Railroad Crossover Program Existing CA This project will improve operational flexibility for commuter and intercity trains in Southern California that will reduce passenger delays.   $8,400,000
Southwest CA FY 2009 Pacific Surfliner Corridor: Strategic Assessment          Existing CA This project includes analysis future market demand to plan for more frequent service in Southern California.  $200,000
Southwest CA FY 2010 Pacific Surfliner: PE/NEPA for Double Track Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays north of San Diego.  $400,000
Southwest CA FY 2010 Pacific Surfliner: PE/NEPA for Double Track, Curve Realignments Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays north of San Diego.  $3,142,000
Southwest CA FY 2010 Raymer-Bernson: PE/NEPA for Double Track, Grade Crossings, New Bridges, New Platform Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays for commuter and intercity trains through the San Fernando Valley, while adding new platforms to stations in Northridge and Chatsworth.  $1,564,000
Southwest CA FY 2010 San Diego: PE/NEPA for Double Track Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays in San Diego.  $10,000,000
Southwest CA FY 2009 San Onofre-San Diego PTC Implementation Existing CA This project installs new signalling equipment that will improve safety of trains in Southern California.  $24,900,000
Southwest CA FY 2010 Seacliff: PE/NEPA for Track Realignment, Siding Extension Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays between Los Angeles and San Diego.  $950,000
Southwest CA FY 2010 Van Nuys Boulevard:  PE/NEPA for Bridge Widening, New Platform, System Improvements Existing CA This project completes necessary design and environmental work to expand capacity and reduce delays north of LA Union Station.  $800,000
Southwest CA FY 2010 California State Rail Plan Other Projects This project completes the State Rail Plan in accordance with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements.  $1,500,000
Southwest CA ARRA Next Generation Passenger Rail Equipment Purchase Regional Equipment Pool New trains for existing intercity passenger corridors:  Capitol Corridor (Bay Area-Sacramento), San Joaquin (Northern CA to Central Valley), and Pacific Surfliner (Los Angeles-San Diego)  $68,000,000
Southwest CA FY 2010 Statewide Rolling Stock Acquisition Regional Equipment Pool New trains for existing intercity passenger corridors:  Capitol Corridor (Bay Area-Sacramento), San Joaquin (Northern CA to Central Valley), and Pacific Surfliner (Los Angeles-San Diego)  $100,000,000
Southwest NV FY 2010 Nevada State Rail Plan Other Projects This project funds the preparation of a State Rail Plan that is compliant with the Passenger Rail Investment and Improvement Act of 2008 and Federal Railroad Administration requirements.  $545,272
Southwest Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
CA 31 $ 4,238,197,986
NV 1 $ 545,272
Total 32 $ 4,238,743,258
Pacific Northwest Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
WA 6 $ 794,850,538
OR 7 $ 19,49,6630
Total 13 $814,347,168
Midwest Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
IA 3 $ 18,709,080
IL 7 $ 1,905,133,042
IN 1 $ 71,364,980
MI 8 $ 400,732,595
MN 3 $ 45,600,000
MO 12 $ 49,754,545
WI 2 $ 11,752,955
Total  37 $2,503,047,197
Northeast Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
CT 3 $ 190,900,000
DC 1 $ 4,270,500
DE 2 $ 13,750,000
MA 2 $ 105,300,000
MD 3 $ 91,400,000
ME 3 $ 59,807,836
NH 1 $ 2,240,000
NJ 1 $ 38,500,000
NY 13 $ 496,216,023
PA 5 $ 66,400,000
RI 3 $ 29,200,000
VT 2 $ 53,222,258
Total 40 $ 1,601,150,617
Southeast Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
DC 1 $ 2,900,000
GA 4 $ 4,850,000
NC 4 $ 572,560,839
VA 2 $ 119,148,119
WV 1 $ 1,000,000
Total 12 $ 700,458,958
Gulf Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
AL 1 $ 100,000
Total 1 $ 100,000
Heartland Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
KS 2 $ 337,563
OK 3 $ 2,242,050
TX 3 $ 24,067,877
Total 8 $ 26,647,490
Mountain West Region
STATE NUMBER OF PROJECTS OBLIGATED FUNDING
CO 2 $ 1,400,000
ID 1 $ 200,000
NM 1 $ 100,000
Total 4 $ 1,700,000