|
|
Peer Review Plans & Peer Review Reports-Approved
Peer Review
Calcasieu Lock
Project Review Plans
Calcasieu
Lock
Calcasieu
River and Pass
Southwest Coastal Louisiana
LCA BBBS
Alexandria to the Gulf
Donaldsonville to the Gulf
Westshore
Amite River and Tributaries -
Ecosystem Restoration
Plaquemines Parish UFC
St. Charles UFC
St. John UFC
Calcasieu DMMP
Houma navigation
canal
Calcasieu River Basin
St. Bernard Parish UFC
Amite River and Tributaries Bayou Manchac
SELA, St. Tammany Parish, W-14 Canal Drainage Improvements
HSDRRS-MRL Co-Located Work Review Plan
West Shore - Lake Pontchartrain
HSDRRS, NFIP, Levee System Evaluation Reports
Atchafalaya Basin Floodway System, Project Flood Flow Line Report
Grand Isle, Louisiana and Vicinity (Larose to Vicinity of Golden Meadow) Hurricane Protection Project, Plans and Specifications
HSDRRS Mitigation Review Plan
Review Plan for Bayou Sorrel Lock Replacement Project, Louisiana, Post Authorization Change Report
Review Plan for City of Carencro, Lafayette Parish, Louisiana, Continuing Authorities Program Section 205 Feasibility Study
Morganza to the Gulf PAC
LCA Myrtle Grove
O&M Projects within the New Orleans District, Rivers and Harbors Projects
Pre-Katrina Mitigation
MRGO Ecosystem Restoration Plan Feasibility Study
Modeling Hurricane Isaac Pre- and Post-100-year HSDRRS Review Plan
Louisiana Coastal Area (LCA) Louisiana Ecosystem Restoration Beneficial Use of Dredged Material (BUDMAT) Program Programmatic Feasibility Study Peer Review
Review Plan Approval for Decision and Implementation Documentation for New Orleans to Venice (NOV) Hurricane and Storm Damage Risk Reduction System, Plaquemines Parish, Louisiana
False River, New Roads, Louisiana Continuing Authorities Program (CAP), Section 206, Review Plan (RP) Approval
Southern University Campus Road, Baton Rouge, Louisiana Continuing Authorities Program (CAP), Section 14 Review Plan (RP) Approval
Louisiana Coastal Area (LCA) Demo Program Development II
South East Louisiana (SELA) Orleans and Jefferson
Larose to Golden Meadow
Comite River Diversion
Louisiana Coastal Area (LCA) Mississippi River Hydrodynamic Model
Louisiana Coastal Area (LCA) Barataria Basin Barrier Shoreline Implementation
Louisiana Coastal Area (LCA) Medium Diversion at White Ditch Implementation
Louisiana Coastal Area (LCA) Mississippi River Delta Management
Louisiana Coastal Area (LCA) Convent Blind River Implementation
Mississippi River and Tributaries Atchafalaya Basin Construction
New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS)
New Orleans Hurricane and Storm Damage Risk Reduction System (HSDRRS) Armoring
Calcasieu River and Pass Dredged Material Management Plan Implementation
Approved Independent External Peer Review (IEPR) Reports
Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS)Lake Pontchartrain and Vicinity (LPV)111.01 - Deep Soil Mixing Design Guidelines
Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Design Guidelines: Spiral Welded Pipe (SWP) Piles for Coastal Structures
Greater New Orleans Hurricane and Storm Damage Risk Reduction System (GNOHSDRRS) Design Guidelines: Aberrant Barge Impact Loads on Hurricane and Storm Damage Risk Reduction System Floodwalls
|
|