![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080729-F-9114G-037.JPG) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080729-F-9114G-037.JPG)
Hot run
A Multiple Launch Rocket System (MLRS) rocket motor is installed in J-6 Large Rocket Motor Test Facility before test firing. Paint stripes on the top of the MLRS rocket motor, is temperature-indicating paint that monitors temperature range between 200 to 1,200 degrees Fahrenheit. (Photo by Rick Goodfriend)
|
Hot run
Download Full Image E-mail a friend
Posted: 11/21/2008
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080221-O-0000U-005.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080221-O-0000U-005.jpg)
Satellite killer
A Navy Standard Missile model undergoes aerodynamic testing in AEDC's von Karman Gas Dynamics Facility Wind Tunnel A in 1994. (AEDC file photo)
|
Satellite killer
Download Full Image E-mail a friend
Posted: 2/22/2008
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080221-O-0000U-004.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080221-O-0000U-004.jpg)
A closer look
(From left) Gregg Fox, Aerospace Testing Alliance tunnel installation engineer, Andy Davenport, former center lead engineer and Sherry Simons, ATA project engineer, inspect the 1/3 scale model of the third stage Navy Standard Missile in AEDC's von Karman Gas Dynamics Facility Wind Tunnel A in 1996. They were gathering limited aerodynamic data for the customer’s database. (AEDC file photo)
|
A closer look
Download Full Image E-mail a friend
Posted: 2/22/2008
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080221-O-0000U-002.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080221-O-0000U-002.jpg)
The importance of testing
A Navy Standard Missile in the baseline configuration during a stability and control
test in the center’s 4-foot transonic wind tunnel in 1997. (AEDC photo)
|
The importance ...
Download Full Image E-mail a friend
Posted: 2/22/2008
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080221-O-0000U-001.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080221-O-0000U-001.jpg)
Over the Pacific
The USS Lake Erie launches a Navy Standard Missile-3 at a nonfunctioning National Reconnaissance Office satellite as it traveled in space at more than 17,000 mph over the Pacific Ocean Feb. 20. (Defense Dept. photo by U.S. Navy)
|
Over the Pacific
Download Full Image E-mail a friend
Posted: 2/22/2008
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080213-F-6163H-004.JPG) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080213-F-6163H-004.JPG)
Space Chamber
Pictured is AEDC’s 10V Space Chamber Hardware-in-the-Loop (HWIL) facility. (Photo by David Housch)
|
Space Chamber
Download Full Image E-mail a friend
Posted: 7/11/2011
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080213-F-6163H-003.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080213-F-6163H-003.jpg)
Upgrade
Winfried Goethert and Heard Lowry, physicists with Aerospace Testing Alliance’s integrated test and analysis branch, work with the alignment tools used with the Radiometric Scene Monitoring System during the recent major upgrade to the 10V Space Chamber Hardware-in-the-Loop (HWIL) facility. (Photo by David Housch)
|
Upgrade
Download Full Image E-mail a friend
Posted: 7/11/2011
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080213-F-6163H-002.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080213-F-6163H-002.jpg)
New and improved
Winfried Goethert and Heard Lowry, physicists with Aerospace Testing Alliance’s integrated test and analysis branch, work with the optical alignment inside the 10V Space Chamber Hardware-in-the-Loop facility during the $50 million upgrade to the system. In the foreground is the Monitor Select Mirror System with the one of the optical beam combiners behind them. (Photo by David Housch)
|
New and improved
Download Full Image E-mail a friend
Posted: 7/11/2011
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/080213-F-6163H-001.JPG) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/080213-F-6163H-001.JPG)
verification
Augie Huber, a systems engineer with the Kinetic Kill Vehicle Hardware-in-the-loop Simulator team from Eglin, AFB, works inside the center’s 10V Space Chamber on the Infrared Array Optical Assembly. He is verifying the connections to the resistive emitter arrays installed in that subsystem. In front of Huber is the Steering Mirror System with two of the Collimating Optical System mirrors behind him. (Photo by David Housch)
|
verification
Download Full Image E-mail a friend
Posted: 7/11/2011
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/070327-D-6163H-018.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/070327-D-6163H-018.jpg)
NASA Orion testing heating up at AEDC
Troy Davis, Aerospace Testing Alliance outside machinist, checks the alignment of the Orion heat shield material sample prior to testing in H2. (Photo by Rick Goodfriend)
|
NASA Orion ...
Download Full Image E-mail a friend
Posted: 9/20/2007
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/070327-D-9114G-004.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/070327-D-9114G-004.jpg)
It's gettin' hot in here
Aerospace Testing Alliance Instrumentation Technician Doyle Jones performs a continuity check on the instrumentation inside the Orion Crew Exploration Vehicle heat shield material candidate model prior to a test run in Arnold Engineering Development Center's H2 test facility. (Photo by Rick Goodfriend)
|
It's gettin' ...
Download Full Image E-mail a friend
Posted: 9/13/2007
|
|
|
![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/thumbnails160/070226-D-9114G-006.jpg) ![](https://webarchive.library.unt.edu/web/20130224091544im_/http://www.arnold.af.mil/shared/media/photodb/web/070226-D-9114G-006.jpg)
It's gettin' hot in here
An Orion Crew Exploration Vehicle heat shield material sample model undergoes preproduction aerothermal testing in Arnold Engineering Development Center's H2 test facility as part of a facility validation and calibration run. More testing is slated to occur in December. (Photo by Rick Goodfriend)
|
It's gettin' ...
Download Full Image E-mail a friend
Posted: 9/19/2007
|
|
|
| | | |