Back to Part-3 |
Next |
|
|
|
Table
of Contents |
|
|
Name & Description |
|
Time |
Sheet1 |
Alpena, MI- Section Included:
Lower 4,000 feet of river and private harbors north of mouth of Thunder Bay
River. Controlling Depth: 21 feet in the bay section; 17 feet in river; 15
feet in turning basin. Project Depths: channel 21 feet deep from that depth
in Thunder Bay to a point 2,500 feet lakeward of the lighthouse; thence 18.5
feet in river narrowing to 100-foot width at a point 700 feet upstream from
the lighthouse; thence 100 feet wide and 18.5 feet deep to the Second Ave.
Bridge; thence 18.5 feet deep and
75 feet wide to the upper limits of the project; a turning tasin 15 feet deep
by 3.7 acres at the upper end of project; and a turning basin 18.5 feet deep
at the river mouth. Navigation season: March 15 to December 17. |
|
CY2010 |
Sheet2 |
Ashland, WI- Section Included:
Entire harbor. Controlling and Project Depths: 27 feet in about westerly half
of east basin and approach thereto, 25 feet in remainder of east basin, and
21 and 20 feet in the channel in western portion of the harbor. Controlling
Depth: 20 feet along the southern portion of the 21 foot project depth area.
Navigation Season: May 13 to November 26. |
|
CY2010 |
Sheet3 |
Ashtabula, OH- Section Included:
Outer harbor and Ashtabula River from mouth to and including city of
Ashtabula Dock (Former Great Lakes Engineering Works Dock), 1.75 miles.
Controlling Depth: Westerly portion of outer harbor to inner breakwater&
approach channel to docks east of inner breakwater, 26.0 feet turning basin
in front of inner breakwater 21.5 feet; the approach to the Penn. Central
Railroad Company's slip and the lower 2,000 feet of the Ashtabula River, 23
feet; thence to car fe rry slip, 10 feet; thence to a point 1,550 feet
upstream from turning basin and including turning tasin, 3 feet. Project
Depth: Entrance channel, 29 feet; westerly portion of outer harbor to inner
breakwater, 28 feet; Approach Channel to docks east of inner breakwater, 28
feet; turning basin in the easterly portion of the outer harbor, 22 feet;
channel from inside the Inner Breakwater to mouth of river and 2,000 feet
upstream and approach channel to Penn. Central Railroad Company's slip, 2 7
feet; thence to car ferry slip, 18 feet; thence to a point 1,550 feet
upstream from turning basin and including turning basin, 16 feet. |
|
CY2010 |
Sheet4 |
Bayfield, WI- |
|
CY2010 |
Sheet5 |
Buffalo Harbor, NY- Section
Included: Outer harbor, Lackawanna Canal, Union Canal. Buffalo River from
mouth to Conrail R. Y. Bridge, 5.5 miles. Buffalo Ship Canal, and Black Rock
Canal to the Black Rock Lock. Controlling Depths: Outer area of south entrance
channel, 30 feet; south entrance channel 29.0 feet; southern portion of outer
harbor, 28 feet; 900 feet wide section adjacent to the south breakwater
beginning 2,000 feet north of the south breakwater and proceeding northerly
4,200 fee t, 23 feet; thence 27 feet to the International Salt Company and 23
feet in the remainder of the outer harbor to the north; new north entrance
channel, 25 feet; Black Rock Canal, 21 feet; Buffalo River Entrance, Buffalo
River and Buffalo Ship Canal, 22 feet. Project Depth: Outer area of south
entrance channel, 30 feet; south entrance channel 29 feet; southern portion
of outer harbor, 28 feet; 900 feet wide section adjacent to the south
breakwater beginning 2,000 feet north of the south break water and proceeding
northerly 4,200 feet, 23 feet. Middle section of the outer harbor, 27 feet;
north outer harbor, 23 feet; north entrance channel, 25 feet; Buffalo River
entrance, Buffalo River and Buffalo Ship Canal, 22 feet. Black Rock Canal, 21
feet. |
|
CY2010 |
Sheet6 |
Buffalo, NY- Section Included:
Outer harbor, Lackawanna Canal, Union Canal, Buffalo River from mouth to
Conrail RY Bridge 5.5 miles, Buffalo Ship Canal, Black Rock Canal, Black Rock
Lock, Black Rock Channel, Niagara River, and Tonawanda to and including Buffalo
Oil Terminal, Inc. Dock, located about 2,000 feet north of turning basin,
Tonawanda inner Harbor, and Tonawanda Creek Channel from mouth to Main Street
Bridge. Controlling and Project Depths: See Buffalo Harbor, Niagara River and
Tona wanda. |
|
CY2010 |
Sheet7 |
Buffington, IN- |
|
CY2010 |
Sheet8 |
Burns Waterway Harbor, IN-
Section Included: Approach channel, outer harbor, and two harbor arms.
Project Depth: 30 feet in approach channel, 28 feet in outer harbor, and 27
feet in the east and west harbor arms. |
|
CY2010 |
Sheet9 |
Calcite, MI- NON-CORPS PROJECT |
|
CY2010 |
Sheet10 |
Charlevoix, MI- Section
Included: Entrance channel and entire area of Round Lake and Lake Charlevoix,
including Advance, Boyne City and East Jordan. Controlling Depth: 18 feet.
Project Depth: 23 feet. |
|
CY2010 |
Sheet11 |
Cheboygan, MI- Section Included:
Entrance channel and 3,500 feet of river. Controlling Depth: 21 feet to East
First Street, including turning basin, and 18.5 feet to the State Road
Bridge. Project Depth: 21 feet to East First Street; 18.5 feet to the State
Road Bridge; 8.5 feet above the State Road Bridge to Lock in Cheboygan River;
21 feet in turning basin. Navigation season: 14 April to 9 December. |
|
CY2010 |
Sheet12 |
Chicago Harbor, IL- Section
Included: Protected area on lakefront from Oak Street to Roosevelt Road and
Chicago River entrance to Rush Street. Project Depth: 29 feet in the lake
approach channel, 28 feet in the channel and maneuver area to the east end of
Navy Pier, then 21 feet in the approach to the lock and in the Chicago River
entrance to Rush Street. |
|
CY2010 |
Sheet13 |
Chicago, IL- Section Included:
Chicago Harbor, Chicago River, Main and North Branch, Chicago River, South
Branch, Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake
Calumet, IL, Calumet Harbor and River, IL and IN. Project Depth: See Chicago
Harbor, Chicago River, Main and North Branch, Chicago River, South Branch,
Chicago Sanitary and Ship Canal, Calumet-Sag Channel and Lake Calumet, IL,
Calumet Harbor and River, IL and IN. |
|
CY2010 |
Sheet14 |
Cleveland, OH- Section Included:
Outer Harbor, Old River and Cuyahoga River from mouth to and including Upper
Republic Steel Corp. Dock, immediately downstream from Norfolk & Western
Railway Bridge, 5.8 miles. Controlling Depth: Lake Approach Channel, 29 feet;
entrance channel, West Basin and westerly 800 feet of East Basin, 28 feet;
easterly 3800-foot length of East Basin, 27 feet; 500-foot channel through
East Outer Harbor, 25 feet; channel between piers to Conrail Railroad Bridge,
27.0 f eet; channel in Cuyahoga River from Penn Central Railroad to
upperproject limit, 22 feet; turning basin upstream from E.I. Dupont De
Nemours And Company, Inc., Grasselli Chemical Division Dock, 19.5 feet; Old
River to Sand Products Corporation Dock, 23 feet; remainder of Old River to
upper project limit, 14 feet. Project Depth: Lake Approach Channel, 29 feet;
West Basin, entrance channel and west end of East Basin, 28 feet; remaining
3800-foot length of East Basin, 27 feet; 500-foot channel t hrough East Outer
Harbor,25 feet; lower Cuyahoga River from lakeward ends of the piers to
immediately above junction with Old River, 27 feet; Old River to upper
project limit, 27 feet; remainder of Cuyahoga River, 23 feet; turning basin
upstream from E.I. Dupont De Nemours and Company, Inc., Grasseli Chemical
Division Dock, 18 feet. |
|
CY2010 |
Sheet15 |
Conneaut, OH- Section Included:
Outer harbor and Conneaut River 2,450 feet upstream of the outer end of the
West Pier. Controlling Depth: Westerly portion of outer harbor, 20.5 feet;
access channel to city dock, 7.5 feet; easterly portion of outer harbor 23
feet. Inner Harbor, 28. feet; Project Depth: Easterly portion of outer
harbor, 28 feet; westerly portion of outer harbor, 22 feet; access channel to
city dock 8 feet: Inner Harbor, 27 feet. |
|
CY2010 |
Sheet16 |
Detroit Harbor, MI- Section
Included: U.S. bank of Detroit River from Lake St. Clair to western extreme
of Zug Island. Controlling Depth: Channel north of Belle Isle 21 feet,
remainder of river 25-28.5 feet. Project Depth: 28.5 feet except channel
north of Belle Isle, 21 feet. |
|
CY2010 |
Sheet17 |
Detroit Harbor, WI- |
|
CY2010 |
Sheet18 |
Detroit, MI- Section Included:
Detroit Harbor, Rouge River, Ecorse, Wyandotte, Riverview and Trenton.
Controlling and Project Depths: See aforementioned project descriptions. |
|
CY2010 |
Sheet19 |
Drummond Island, MI- Section
Included: Private loading dock on St. Marys River at Drummond Island, MI.
Controlling Depths: 30 feet to and from Lake Huron; 27.0 feet to and from
Lake Superior; 27.0 feet to Lake Superior; 23 feet at dock. Project Depth: See
St. Marys River. |
|
CY2010 |
Sheet20 |
Duluth-Superior, MN and WI-
Section Included: Superior Bay and its tributaries, St. Louis Bay and St.
Louis River, and Allouez Bay. Controlling Depth: 32 feet in lake approaches,
diminishing to a minimum of 20 feet in certain inner channels; there are numerous
1-2 foot shoals scattered in portions of the Duluth and Superior Harbor
Basins. Project Depth: 32 feet in lake approaches; 27 feet in Duluth and
Superior Harbor Basins, superior front channel, and in ore-channel routes
through north and south channels
to D. M. & I. R. R.Y. ore docks; 27 feet in Howards Bay and Allouez Bay;
23 feet in remaining portion of south, upper, and Minnesota channels to
Hallet Dock No. 6; and 20 feet from thence to northerly end of Clough Island.
Navigation Season: April 3 to January 11. |
|
CY2010 |
Sheet21 |
Ecorse, MI- Section Included:
U.S. shore of Detroit River from Great Lakes Avenue. to Ecorse River.
Controlling Depth: 26.5 feet. Project Depth: 28.5 feet. |
|
CY2010 |
Sheet22 |
Erie, PA- Section Included:
Southerly side of Erie Harbor and Lake Erie water frontage from harbor
entrance eastward to and including Sun Oil Co dock, 3.5 miles. Controlling
Depth: Entrance channel, 29 feet; channel to easterly coal and ore docks, 27
feet; and 27 feet to the Port Authority Dock; harbor basin, 21 feet; westerly
portion of harbor, 18 feet. Project Depth: Entrance channel, 29 feet;
Approach Channel to easterly coal and ore docks, 28 feet; approach to Port
Authority Docks, 2 7 feet; Harbor Basin, 21 feet; westerly portion of Harbor
Basin, 18 feet. The approach channel from the 28 foot channel to and
including turning basin at westerly docks has been authorized, but never
completed and considered inactive at the present time. |
|
CY2010 |
Sheet23 |
Escanaba, MI- NON-CORPS PROJECT |
|
CY2010 |
Sheet24 |
Fairport Harbor, OH- Section
Included: Outer harbor and Grand River from mouth to and including Diamond
Alkali Company Stone Dock, 1.5 miles. Controlling Depths: Entrance Channel,
24 feet; Outer Harbor, 24.0 feet; Grand River to upstream of Republic Steel,
19.0 feet; remaining length of Grand River to the upper project limit, 19
feet; except for 1,000 feet of the upstream end of the west side of the
channel, 5 feet; turning basin, 15 feet. Maintenance Depths: Entrance channel
and outer ha rbor, 25 feet; Grand River to upstream of Republic Steel, 24
feet; remaining length of Grand River to the upper project limits, 21 feet:
turning basin, 18 feet. |
|
CY2010 |
Sheet25 |
Gary, IN- |
|
CY2010 |
Sheet26 |
Gladstone, MI- Section Included:
Entire harbor including Kipling, Mich. Controlling and project depths: 24
feet at Kipling Channel & Turning Basin. |
|
CY2010 |
Sheet27 |
Grand Haven, MI- Section
Included: Entire harbor, including Ferrysburg and Spring Lake; and Grand
River from Grand Trunk RY. Bridge at Ferrysburg to Bass River about 15 miles.
Controlling Depths: 22 feet in entrance channel; 21 feet to the mouth of the
south channel; 21 feet to the sag; 20 feet to Grand Trunk RY. Bridge at
Ferrysburg; 18 feet in the Turning Basin; 17 feet in channel to Spring Lake;
thence 8 feet to mile 17.0 and 5 feet to the end of the project. Project
Depths: 23 feet in entrance channel; 21 feet to Ferrysburg; 18 feet in
channel to Spring Lake; 8 feet to mouth of Bass River. Navigation season:
March 1 to December 31. |
|
CY2010 |
Sheet28 |
Green Bay, WI- Section Included:
Outer channel, channel through the city of Green Bay and upper river channel
to city of De Pere. Controlling and project depths: 26 feet in outer channel
to Grassy Island; 24 feet in the entrance channel and river channel to a
point 1,700 feet upstream from the C. & N. W. R. R. Bridge; 24 feet in
the turning basin at the mouth of the East River; 20 feet in the turning
basin above the C. & N. W. R. R. Bridge; 18 feet in the upper river
channel and turning bas in at the city of De Pere. |
|
CY2010 |
Sheet29 |
Harbor Beach, MI- Section
Included: Entrance channel and anchorage area at Harbor Beach, Mich.
Controlling Depth: 20 feet in the entrance channel, 14 to 16 feet in the
anchorage area. Project Depth: 23 feet in the entrance channel; 21 feet in
the anchorage area. Navigation season: 20 April to 14 December. |
|
CY2010 |
Sheet30 |
Holland, MI- Section Included:
Controlling Depths: Entrance channel - 23 feet decreasing to 20 feet at the
outer end of the inner pier; thence a controlling depth of 19 feet for a
channel through Lake Macatawa to the wharves in Holland, Michigan, a Turning
Basin 18 feet deep, a channel in Black River 21 feet deep and a settling
basin with a project depth of 17 feet above the Black River channel to the
State Street Bridge. Navigation season: March 13 to December 31. |
|
CY2010 |
Sheet31 |
Huron, OH- Section Included:
Lake approach channel from deep water to a point opposite the outer end of
east breakwater; entrance channel from its junction with the approach channel
to its junction with the River Channel; River channel and turning basin to
within 1,500 feet of the Penn Central Railroad Bridge. Controlling Depths:
Lake approach and entrance channel, 27.5 feet; river channel, 27 feet;
turning basin, 21 feet. Project Depths: Lake approach and entrance channels,
29 feet; river channel to Slip No. 1, 28 feet; from Slip No. 1 through
eastern portion of the turning basin, 28 feet; turning basin, 22 feet. |
|
CY2010 |
Sheet32 |
Indiana Harbor, IN- Section
Included: Approach channel, outer harbor and canal entrance channel to the
first E. J. & E. R. R. Bridge: Indiana Harbor Canal, including the
Calumet River Branch to Columbus Drive Bridge and the Lake George Branch to
0.2 miles past Indianapolis Blvd. Project Depth: 29 feet in approach channel,
28 feet in harbor basin, 27 feet in canal entrance channel, and 22 feet in
remainder of canal to 0.2 miles past Indianapolis Blvd. on Lake George Branch
and Columbus Drive on Calumet River Branch. |
|
CY2010 |
Sheet33 |
Kelleys Island, OH- Section
Included: Entire area of Kelleys Island, Ohio. Controlling Depth: Unimproved,
natural depths unknown. Project depth: Approach channel, 12 feet; Entrance
channel, 10 feet; and remainder of channel, 8 to 10 feet. |
|
CY2010 |
Sheet34 |
La Pointe, WI- |
|
CY2010 |
Sheet35 |
Lake Calumet, IL- Section
Included: Entrance channel from the Calumet River to a harbor area at south
end of lake with a channel extending northward for a distance of 3,000 feet
and a width of 1,000 feet. Project Depth: 27 feet. |
|
CY2010 |
Sheet36 |
Lorain, OH- Section Included:
Outer Harbor and Black River from mouth to and including United States Steel
Corp., National Tube Division dock, 3 miles. ControllingDepths: Lake Approach
channel, 27.0 feet; A channel 800 feet wide through the Outer Harbor, 27
feet; remainder of Outer Harbor, 25 feet; lower 2,200 feet of River Channel,
25 feet; remainder of River Channel 24 feet except turning basinjust
downstream of the 21st Street Bridge which is 12 to 19 feet and the returning
Basin opposit e the U. S. Steel Corp., National Tube Division which is 12 to
20 feet. Project Depths: Lake Approach Channel, 29 feet; a channel 800 feet
wide through the Outer Harbor, 28 feet; remainder of Outer Harbor, 25 feet;
lower 2,200 feet of River Channel, 28 feet; remainder of River Channel, 27
feet; except turning basin downstream of 21st Street Bridge, 20 feet and
turning basin opposite U. S. Steel Corp., National Tube Division Dock, 21
feet. |
|
CY2010 |
Sheet37 |
Ludington, MI- Section Included:
Entrance channel and entire area of Pere Marquette Lake. Controlling Depths:
26 feet in the outer entrance bar and 27 feet in the channel to Pere
Marquette Lake. Project Depths: Outer entrance channel, 30 feet; inner entrance
channel, 29.5 feet; channel to Pere Marquette Lake, 29 feet; north and south
mooring basins, 18 feet. Navigation season: April 2 to December 31. |
|
CY2010 |
Sheet38 |
Mackinac, MI- |
|
CY2010 |
Sheet39 |
Manistee, MI- Section Included:
Entrance channel and entire area of Manistee Lake, including Filer City.
Controlling Depths: 24 feet over the entrance bar, through the outer basin
and in the channel between the piers; thence 23 feet in the river channel,
narrowing to a minimum width of about 100 to 140 feet to Manistee Lake.
Project Depths: 25 feet in the outer basin and 23 feet in the river to
Manistee Lake. Navigation season: March 30 to December 31. |
|
CY2010 |
Sheet40 |
Manistique, MI- |
|
CY2010 |
Sheet41 |
Manitowoc, WI- Section Included:
Outer harbor and lower 2 miles of river. Controlling and project depths: 21
feet in the Lake Approach Channel, the outer harbor, and in the river channel
to the Third Railway Bridge. |
|
CY2010 |
Sheet42 |
Marblehead, OH- |
|
CY2010 |
Sheet43 |
Marine City, MI- |
|
CY2010 |
Sheet44 |
Marquette, MI- Section Included:
Entire harbor. Controlling Depth: 26 feet. Project Depth: 27 feet. Navigation
Season: May 14 to November 22. |
|
CY2010 |
Sheet45 |
Marysville, MI- Section
Included: West bank of St. Clair River at Marysville, MI. Controlling Depth:
27.4 feet. Project Depth: at low-water datum; 27.4 feet to and from Lake
Huron; 27.1 feet downbound to Lake St. Clair. |
|
CY2010 |
Sheet46 |
Menominee, MI and WI- Section
Included: Entrance channel and lower 2.0 miles of Menominee River.
Controlling and project depths: 20 feet controlling depth, 23 feet project
depth in the Approach Channel; 18 feet controlling depth, 21 feet project
depth in the entrance and river channels, 19 feet in the river adjacent to
the Marinette Marine Corp., 12 feet to the end of the project, and 18.5 feet
controlling depth, 21 feet project depth in the Turning Basin. |
|
CY2010 |
Sheet47 |
Milwaukee, WI- Section Included:
Lake Approach Channel, outer harbor, Milwaukee River to Buffalo Street, lower
2 miles of Menomonee River, lower 2 miles of Kinnickinnic River and South
Menomonee and Burnham Canals. Controlling and project depths: 30 feet in Lake
Approach Channel, 28 feet in the entrance channel and the south outer harbor,
21 feet in the north outer harbor, 27 feet in the Kinnickinnic River to the
Chicago and North Western Railway Bridge at mile 1.0, thence 21 feet to South
K innickinnic Avenue Bridge; 27 feet in Milwaukee River to the Chicago and
North Western Railway Bridge at mile 0.21, thence 21 feet to East Buffalo
Street Bridge; 21 feet in Menomonee River and South Menomonee and Burham
Canals. |
|
CY2010 |
Sheet48 |
Monroe, MI- Section Included:
Channel in Lake Erie and 16,000 feet above Raisin River.Controlling depth: 20
feet to turning basin over a center width of 150 feet; 16.5 feet in turning
basin except near the shore; 5.5 feet in 9 foot channel. Project Depth: 21
feet to the turning basin; 18 feet in the turning basin; 9 feet to lower
docks at Monroe. Navigation season: Approximately 20 April to 14 December. |
|
CY2010 |
Sheet49 |
Muskegon, MI- Section Included:
Entrance channel and entire area of Muskegon Lake. Controlling Depths: 29.0
feet through the outer portion of project and 27 feet in channel to Muskegon
Lake. Project Depth: Varying from 29.0 feet at harbor entrance to 28 feet
between breakwaters and 27 feet in inner channel. Navigation season: April 7
to December 31. |
|
CY2010 |
Sheet50 |
Niagara River, NY- Section
Included: Black Rock Channel north of the Black Rock Lock and Niagara River
to and including American Oil Co. dock, 0.5 mile south of the Tonawanda city
line, the northern limit of the Niagara River section of the Port of Buffalo.
Controlling and Project Depths: 21 feet. |
|
CY2010 |
Sheet51 |
Ogdensburg, NY- Section
Included: St. Lawrence River Frontage from vicinity of Lake Street Bridge to
inner end of Ogdensburg Bridge and Port Authority Dock near Barre Street;
upper entrance, city front and lower east entrance channels and lower basin.
Controlling Depth: Upper entrance, city front and lower entrance channels, 19
feet; lower basin, 21 feet. |
|
CY2010 |
Sheet52 |
Oswego, NY- Section Included:
Outer Harbor and Oswego River from mouth to Seneca Street. Controlling
Depths: Lake approach channel, 27 feet; channel through outer harbor, 24
feet; east and west side of outer harbor, 21 feet; Oswego River channel, 24
feet. Project Depths: Lake approach channel, 27 feet; channel through outer
harbor, 25 feet; lower 1,600 feet of Oswego River channel, 24 feet; remainder
of Oswego River channel and Oswego Harbor, 21 feet. |
|
CY2010 |
Sheet53 |
Port Dolomite, MI- |
|
CY2010 |
Sheet54 |
Port Huron, MI- Section
Included: West bank of the St. Clair River from mouth of river to Grand Trunk
Western Railroad Bridge and both banks of the Black River up to Washington
Avenue in Port Huron, Michigan. Controlling Depths: from Lake St. Clair to Stag
Island, 27.1 feet. In the Stag Island to Port Huron channel and the foot of
Lake Huron channel, 27.3 feet and 30 feet respectively. In the Black River,
17 feet, for a width of 70 feet, from the mouth to 1,700 feet upstream of the
Grand Trunk Western Railroad
Bridge, and 15 feet for a width of 50 feet through the settling basin to
Washington Avenue. Project Depths: In the St. Clair River, slopes from 30
feet at head to 27.5 feet at Grand Trunk Western Railroad Bridge. In the
Black River, 20 feet from the mouth to the upper end of the settling basin,
about 2,300 feet upstream from the Grand Trunk Western Railroad Bridge. |
|
CY2010 |
Sheet55 |
Port Inland, MI- |
|
CY2010 |
Sheet56 |
Presque Isle, MI- Section
Included: Entire harbor. Controlling and Project Depths: 30 feet in approach
and 28 feet in basin. Navigation Season: March 31 to January 21. |
|
CY2010 |
Sheet57 |
Put-In-Bay, OH- |
|
CY2010 |
Sheet58 |
Rochester, NY- Section Included:
Genesee River from mouth to and including Genesee Docks,3 miles. Controlling
Depth: Approach and entrance channels 19.0 feet; lower turning basin 17.0
feet. remainder of Genesee River 11 feet except for westerlyhalf of upper
turning basin which has not been maintained for several years 4 feet; and
portion of channel upstream of Rochester Portlandc Cement Dock, 12 feet.
project depths: Approach channel, 24 feet; entrance channel between piers to
Conrail Rail road Bridge, 23 feet; remainder of Genesee River, 21 feet. |
|
CY2010 |
Sheet59 |
Rouge River, MI- Section
Included: From the mouth of the Short Cut Canal to the Ford Motor Company.
Controlling Depth: 20 feet for a minimum width of 100 feet from the mouth of
the short cut to Dix Avenue Bridge, with the exception of some shoal areas, and
20 feet in the turning basin, except near the shore. Project Depth: 21.0 feet
from mouth of Short Cut Canal to and including the turning basin in main
channel. |
|
CY2010 |
Sheet60 |
Saginaw River, MI- Section
Included: From the mouth of the river up to and including Sagainaw, Michigan.
Controlling Depths: 27 feet from the 25 foot contour in Saginaw Bay to 26
feet at the river mouth, 4 feet miscellaneous shoaling along channel limits;
thence 24 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O
R.R. Bridge in Saginaw, Michigan; thence 14 feet to the Holland Street
Bridge; thence about 7 feet over a width of 100 feet upstream to Green Point
(this section not maintained).
Controlling depths in turning basins are: Essexville - 23 feet north side, 22
feet south side; Airport - 21 feet; Carrollton - 19 feet; Sixth Street - 20
feet; basin at 19 mile point - 15 feet. Project Depths: 27 feet from the deep
water in Saginaw Bay to the river mouth; thence 26 feet for 0.4 mile; thence
25 feet to the Grand Trunk R.R. Bridge; thence 22 feet to the C&O R.R.
Bridge in Saginaw; thence 16.5 feet to the upstream limits at Green Point. 20
and 25 feet in Essexvil le Turning Basin; 22 feet in the Airport turning
basin; 20 feet in the Carrollton Turning Basin; 20 feet in the Sixth Street
Turning Basin and 15 feet in the Turning Basin at the 19 mile point.
Navigation season: March 24 to December 31. |
|
CY2010 |
Sheet61 |
Sandusky, OH- Section Included:
Southeasterly portion of Sandusky Bay to and including passenger docks on
Cedar Point. Controlling Depth: Mosely Channel, 26 feet; Bay Channel and
Straight Channel from Mosely Channel to junction with Bay Channel, 25.0 feet;
turning basin, 24 feet; Dock channel, 21 feet; Straight channel from dock
channel to junction with Bay Channel, 21 feet. Project Depths: Mosely
Channel, 26 feet; bay channel and Straight Channel from Mosely Channel to
junction with Bay Channel, 25
feet; turning basin, 24 feet; Dock channel, 22 feet; and straight channel
from dock channel to junction with Bay Channel, 21 feet. |
|
CY2010 |
Sheet62 |
Sault Ste Marie, MI- |
|
CY2010 |
Sheet63 |
Silver Bay, MN- |
|
CY2010 |
Sheet64 |
St. Clair, MI- Section Included:
West bank of St. Clair River at St. Clair, MI Controlling Depth: 27.3 feet.
Project Depth: 27.3 feet. |
|
CY2010 |
Sheet65 |
St. James, MI- |
|
CY2010 |
Sheet66 |
St. Joseph, MI- Section
Included: Entrance channel and lower portion of St. Joseph River to and
including Benton Harbor Canal. Controlling Depth: 24 feet at entrance; 21
feet between entrance piers and in the river to the mouth of the Paw Paw
River; with miscellaneous of shoaling along the channel limits; 17 feet in
the Turning Basin; and 16 feet at Benton Harbor Canal. Project Depths: 24
feet at entrance, and 21 feet in channel and river to the mouth of the Paw
Paw River; 18 feet in turn ing basins and the Benton Harbor Canal. Navigation
season: March 7 to December 31. |
|
CY2010 |
Sheet67 |
Stoneport, MI- NON-CORPS PROJECT |
|
CY2010 |
Sheet68 |
Sturgeon Bay, WI- Section
Included: Entire canal and connecting waters between Lake Michigan and Green
Bay, through the city of Sturgeon Bay, Wis. controlling and project depths:
23 feet in Lake Michigan entrance to canal, 22 feet in revetted canal and in
channel through Sturgeon Bay and 20 feet in Turning Basin. |
|
CY2010 |
Sheet69 |
Taconite, MN- NON-CORPS PROJECT |
|
CY2010 |
Sheet70 |
Toledo, OH- Section Included:
Channel in Lake Erie and 7 miles in lower Maumee River. Controlling Depths:
28 feet in the Bay Channel; 27 feet in The River Channel to the turning basin
opposite the Mid-States Terminals, Inc. dock; thence 14 feet to the turning
basin at the upper project limits with 13 feet in the turning basin; 20 feet
in the turning basin at mile 3 and 27 feet in the turning basin at mile 6.5,
project depths: 28 feet in bay and 27 feet in the river channel to the
turning b asin opposite the Mid-States Terminals, Inc. dock; thence 25 feet
to the turning basin at upstream limits of the project with 18 feet in the
turning basin; 20 feet in the turning basin at mile 3 and 27 feet in turning
basin at mile 6.5. Navigation season: Approximately March 1 to December 31. |
|
CY2010 |
Sheet71 |
Trenton, MI- Section Included:
U.S. shore of Detroit River from foot of Sibley Road to foot of Parkway
Drive. Controlling and Project Depths: 28 feet. |
|
CY2010 |
Sheet72 |
Two Harbors, MN- Section
Included: Entire harbor. Controlling Depth: 28 feet except for a 26 foot area
along the east project line. Project Depth: 28 feet in inner basin and 30
feet near entrance. |
|
CY2010 |
Sheet73 |
Waukegan, IL- Section Included:
Artificial harbor basin of about 13.5 acres and entrance channel from Lake
Michigan approximately 2,200 feet in length. Project Depth: 22 feet in
entrance channel; 18 feet between piers and inner basin; 8 feet in anchorage
area of approximately 6 acres. |
|
CY2010 |
Sheet74 |
Wyandotte, MI- Section Included:
U.S. shore of Detroit River from Ecorse River to and including the Pennsalt
Chemical Corp's property. Controlling Depth: 27 feet. Project Depth: Rock
area 28 feet, earth area 27 feet. |
|
CY2010 |
|
|
|
|