Click on a Topic
Jim Woodruff Section 7 Consultation
Hydrological Modeling Technical Workshop (24-25 May 2006)
Hydrological Modeling Technical Workshop (12 Jul 2006)
Drought Provisions Workshop (13 Dec 2006)
ARC Drought Provision Presentation (21 Dec 2006)
Comments on Drought Provision Concepts
ACF Drought Consultation 2007
Buford Dam-Request for Temporary Deviation
Memorandum for Record
Presentations: FWS Overview of Endangered Species Act Requirements Corps Summary of Consultation and Interim Operations Plan Corps "Lessons Learned" Corps Spreadsheet Modeling STELLA Model of IOP FWS STELLA Modeling Corps HEC-5 Modeling
Agenda Presentations: Endangered Species Act Overview Biological Basis for Revised IOP Lessons Learned/ Basis for Revised IOP COE Modeling of Revised IOP Georgia Models of IOP Atlanta Regional Commission Models Return to Top
Agenda Attendance Worksheet IOP Reasonable and Prudent Measures Memorandum for Record Presentations: Brandt Presentation Erhardt Presentation Vaughan Presentation Hathorn Presentation Corps HEC-5 Modeling Corps Drought Provision Concept (MS Excel file) Zeng Presentation Hydrologics Forecasted Inflow Concept Forecast Hirsch 1981 Forecast Sheer 1980 Return to Top
McMahon Presentation: 20% Over-release HEC-5 Model Assumptions 20% Over-release Results ARC Concept HEC-5 Model Assumptions ARC Concept Results Return to Top
Gwinnett County, GA Letter dated 5 Jan 07 Georgia Environmental Protection Division Letter dated 9 Jan 07 Atlanta Regional Commission Concept submitted 10 Jan 07 Southeastern Power Administration Letter dated 10 Jan 07 Florida Department of Environmental Protection Letter dated 16 Jan 07 Florida Department of Environmental Protection Letter dated 29 Jan 07 Return to Top
FWS Concurrence with Volumetric Balancing for Flows Above 5,000 cfs (17 Oct 2007) Corps Request for Temporary Suspension of Ramping (19 Oct 2007) FWS Concurrence of Temporary Suspension of Ramping (19 Oct 2007) Request to Initiate Expedited Section 7 Consultation (1 Nov 2007) Biological Assessment Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F Appendix G Corps Request for Amendment to Biological Assessment (7 Nov 2007) FWS Biological Opinion (15 Nov 2007) EDO Finding of No Significant Impact (16 Nov 2007) Environmental Assessment Appendix A - Biological Assessment (01 Nov 2007) Appendix B - Amendment to Biological Assessment (07 Nov 2007) Appendix C - Biological Opinion (15 Nov 2007) Appendix D - Additional Coordination Correspondence Appendix E - HEC-5 Model Simulation Figures Corps Submittal of EDO Incremental Trigger (21 Nov 2007) Corps Submittal of Trigger for Reduction to 4,500 cfs (7 Dec 2007) Encl 1 - EDO Trigger Status (3 Dec 2007) Encl 2 - EDO 4500 Trigger Modeling (30 Nov 2007) Encl 3 - EDO Status of Composite Storage (3 Dec 2007) Encl 4 - Incidental Take Monitoring Report for 4,750 cfs Reduction
Return to Top
Temporary Deviation Finding of No Significant Impact (12 Mar 2008)
Environmental Assessment Appendix A Appendix B Appendix C Appendix D Appendix D-con't Temporary Deviation Finding of No Significant Impact (13 May 2008) HEC-5 Model Simulation Figures Georgia EPD Water Quality Figures Georgia EPD Talking Points Coordination Letters Corps Letter to EPD (14 May 2008) Georgia EPD Request Letter (10 October 2008) Temporary Deviation Finding of No Significant Impact (14 Nov 2008) Environmental Assessment Appendix A Appendix B Appendix C (7MB) Appendix D Appendix E (12MB) Appendix E-con't (2.5MB) MNGWPD Extension Letter (9 Apr 2009) Georgia EPD Response Letter ( 17 Apr 2009) Corps Response Letter ( 23 Apr 2009) Return to Top
West Piont-Request for Winter Variance
Military Planning & Environmental
Environment & Resources
Plan Formulation
ACF Master Water Control Manual Update
ACT Master Water Control Manual Update
ACF/ACT Information
North Georgia Water Resource Agencies
Public Notices
Environmental Assessments
Environmental Impact Statements
Planning Reports
Project Review Plans
Other Documents
Related Links