Beltsville Area Site Logo
ARS Home About Us Helptop nav spacerContact Us En Espanoltop nav spacer
Printable VersionPrintable Version     E-mail this pageE-mail this page
Agricultural Research Service United States Department of Agriculture
Search
  Advanced Search
 
 
Centers and Laboratories
Director's Office
Facilities Administration
Administrative Services
Extramural Agreements
Budget & Fiscal
Research Support Services
Visitor Information
Visitor Sign-In
Short-Term Visitors
Bicyling Opportunities and Resources
Traveling Directions
Local Driving Directions
Shuttle Service
 

Shuttle Service
headline bar
Photo of USDA Shuttle

The USDA Shuttle
for employees only

Beltsville Circuit

Schedule

Leaves from the first bus shelter in the bus lane at the Metro station and travels to the main entrance at each destination

  • Greenbelt Metro Station
  • George Washington Carver Center (USDA offices) on Sunnyside Road
  • National Agricultural Library
  • Beltsville Agricultural Research Center at Bldg. 003

Scheduled to run approximately every twenty minutes during peak hours, every sixty minutes off-peak.

Carver Center to South Building Circuit

Schedule

  • Runs between the George Washington Carver Center and USDA's South Building
  • Leaves from the South Building's First Wing Arch and the Carver Center's main entrance
  • Scheduled to run throughout the day

The shuttle is wheelchair accessible Wheelchair

PDF files on this page require the free Adobe Acrobat Reader®

   
 
Last Modified: 11/20/2012
ARS Home | USDA.gov | Site Map | Policies and Links 
FOIA | Accessibility Statement | Privacy Policy | Nondiscrimination Statement | Information Quality | USA.gov | White House