Click here a filler image only no relevency to acquisition, logistic, contracting or program management image of a classical greek architechture representing DAU's strength as a business university instructing in DoD Acquisition
          Home      Contact      About ACC      Privacy      Tutorial      DoD Certificate      Feedback
.

Production, Quality & Manufacturing

Community

Welcome

Production, Quality & Manufacturing Hot Topics Policy & Guidance Product Design Process Design & Control Lessons Learned Assessing Manufacturing Risk Tools Training Center Community Connection Supply Chain Management Continuous Process Improvement: Lean - Six Sigma - Total Ownership Cost e-Manufacturing


Note: If you join the PQM community, you will get access to additional information.

Manufacturing as a discipline has undergone dramatic changes in the last ten years. There is no end in sight to this change. Past concerns about quality and productivity have given way to the assumption that Six Sigma Quality and Lean techniques will become the absolute minimum for surviving enterprises. The global definition of quality in the industrialized world moves toward including environmentally compatible manufacturing. The lean focus on right thing, right amount, right place, right time, with zero waste is now commonly accepted, if imperfectly implemented.

Today's manufacturing enterprises are global in scale and competition. Technology acceleration continues in both products and processes. Clock speeds increase and all advantages are temporary. Regardless of product or process, "creative destruction" has become a way of life for all global manufacturers - improve or die. E-commerce, digital data exchange, process simulation and modeling, and the Internet now make the concept of "design-anywhere, build-anywhere" a daily reality for most of our larger corporations. Today's paradigm is the distributed, agile enterprise.

MAJOR DRIVERS IN MANUFACTURING

Global Manufacturing
  • "Design Anywhere - Produce Anywhere"
  • Global Supply Chains
Quick Response Manufacturing
  • Manufacturing Critical Path Time (MCT)
Environmental Compliance and Sustainability
  • ISO 14000
Quality Management Systems
  • ISO 9000
  • AS 9100
Lean Manufacturing
  • Waste Elimination
  • Flow and Cycle Time Reduction
e-Manufacturing
  • Product Lifecycle Management
  • Enterprise Resource Planning Systems
  • STEP (ISO 10303; Standard for the Technical Exchange of Product Model Data)
  • Electronic Data Interchange
  • Modeling and Simulation of Products, Processes and Facilities
  • Collaborative Web-enabled Enterprises
  • Digital Supply Chain Management
  • "Substituting Information for Inventory and Capacity"
Variation Reduction of Products and Processes
  • Six Sigma
  • Dimensional Management

Acquisition reform has given program managers more freedom to make intelligent decisions. However, the 5000 holds the PM responsible for ensuring that production preparations, producibility and cost targets are met, while providing very little practical guidance. This can present a major management challenge.

In today's environment, where should the PM's focus be? Prior to acquisition reform, the PM's role was mainly that of oversight. Today the emphasis is on insight and cooperative management with the contractor. How far does the PMO go in implementing this philosophy? Does the use of performance specification contracting mean there should be no insight? Does developing an insight into contractor operations and processes constitute telling the contractor how to do his job? Should a production plan be required with incremental manufacturing reviews or will the IPT environment suffice? How can I use design for producibility to help meet CAIV goals? Does the program really have a manufacturing strategy and is it integrated with the acquisition strategy? How will the adaption of E-manufacturing, affect the ability of my contractor to perform on my program?

These types of questions are pertinent in today's environment. Perhaps the greatest benefit comes not from a specific decision but from the analyses and open discussions that make sure the right questions have been asked before tough issues are assumed away or ignored under the guise of acquisition reform.

Highlights

  • Private wrote "The DoD Policy and Guidelines for Acquisitions Involving Environmental Sampling or Testing establishes procedures and responsibilities for implementing the minimum quality systems performance standards through solicitations and contracts involving environmental sampling or testing." created Aug 30, 2010

List of All Contributions at this location

Helpful Title Type Contributor Date Modified Popularity
0
References
Private
2012-10-15
5
0
Presentations
Private
2011-7-20
60
0
Highlight
Private
2010-8-30
--
0
Related Websites
Unavailable
2010-7-26
54
0
References
Private
2010-4-23
359
0
Tools & Forms
Private
2007-8-16
33
0
Related Websites
Private
2005-4-8
12
0
FAQ
Private
2005-2-15
403
1
Case Studies
Private
2005-1-21
91
1
Learning Materials
Private
2005-1-21
100
0
Related Websites
Private
2004-12-2
104
0
Related Websites
Private
2004-12-2
172
0
References
Private
2004-9-22
103
0
References
Private
2004-9-22
102
1
Presentations
Private
2004-8-20
101
0
Related Websites
Private
2004-3-18
171
0
Related Websites
Private
2004-3-16
59
0
Related Websites
Private
2004-3-16
58
0
Learning Materials
Private
2004-3-16
170
0
Learning Materials
Private
2004-3-16
169
0
Presentations
Private
2004-3-15
57
0
Presentations
Private
2004-3-15
168
0
Presentations
Private
2004-3-15
167
0
Presentations
Private
2004-3-15
166
0
Presentations
Private
2004-3-15
165
0
Presentations
Private
2004-3-15
99
0
Presentations
Private
2004-3-15
98
0
Learning Materials
Private
2004-3-15
164
0
Learning Materials
Private
2004-3-15
163
0
Learning Materials
Private
2004-3-15
162
0
Learning Materials
Private
2004-3-15
97
0
Learning Materials
Private
2004-3-15
55
0
Learning Materials
Private
2004-3-15
96
0
Learning Materials
Private
2004-3-14
95
0
Learning Materials
Private
2004-3-14
44
0
Learning Materials
Private
2004-3-14
161
0
Learning Materials
Private
2004-3-14
160
0
Learning Materials
Private
2004-3-11
94
0
Learning Materials
Private
2004-3-11
93
0
Learning Materials
Private
2004-3-11
56
0
Learning Materials
Private
2004-3-10
159
0
Learning Materials
Private
2004-3-10
92
0
Case Studies
Private
2004-3-9
158
0
Case Studies
Private
2004-3-9
157
Found 44 records

Related Items

Page Information

In This Community:
5587764 Page Views 6 Pages Emailed
3170 Meta-cards Views 274 Documents and Videos
32 Questions 391324 Attachments Downloaded
26 Answers 0 Videos Downloaded
0 Relationships and Highlights
ID17621
Date CreatedFriday, October 24, 2003 12:50 PM
Date ModifiedFriday, March 25, 2011 10:23 AM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8