NRC Correspondence

The following correspondence are related to overall status or closeout of individual steam generator action plan items:

Date
Description
09/25/03 NRC Letter to D. Grinnell
05-11-01 Memo from S. Collins/A. Thadani to W. Travers revising the Steam Generator Action Plan to address Differing Professional Opinion on steam generator tube integrity issues
03-23-01 Memo from J. Zwolinski/J. Strosnider/B. Boger/G. Holahan to B. Sheron/R. Borchardt revising the Steam Generator Action Plan and documenting completion of Item Nos. 1.1, 1.2, 1.3, 1.4, 1.7, 1.8, 1.15, 2.1, and 2.2
11-16-00 Memo from B. Sheron/J. Johnson to S. Collins issuing the "Steam Generator Action Plan"

NEI 97-06

The following documents relate to the NRC review of industry initiative NEI 97-06 to develop an improved regulatory framework for maintaining steam generator tube integrity.

Date
Description
09-10-04 Letter from S. Peters, NRC to Southern Nuclear Operating Company - Farley Issuance of Amendment
03-24-04 Letter from L. Olshan, NRC to Dusk Energy, Request for Additional Information
12-23-03 Letter from B. Sheron, NRC to A. Marion, NEI
10-10-03 Letter from L. Olshan, NRC to Duke Energy, Revised Request for Additional information
09-17-03 Letter from L. Olshan, NRC to Duke Energy, Request for Additional Information
07-30-03 Revised Technical Specificaiton Amendment Request from Duke Power
06-09-03

Letter from G. Peterson, Duke Energy to NRC, Response to Requests for Additional Information

04-30-03

Letter from L. Olshan, NRC to G. Peterson, Duke Energy "Catawba Nuclear Station, Units 1 and 2 Re:Request for Additional Information"

03-14-03 Letter from Tony Pictrangelo, NEI to Dr. W. Beckner, NRC "Forwarding of TSTF, Project Number: 689," (TSTF-449 Rev 0-Steam Generator Tube Integrity)
02-25-03 Letter from Duke Energy Corporation to NRC Document Control Desk, "Proposed Technical Specification Announcements" (lead plant application)
09-09-02

Letter from NRC to NEI, "NEI Steam Generator Generic License Change Package - Technical Specifications - Revision 6 of Steam Generator Examination Guidelines"

06-10-02 Letter from NRC to NEI, "NEI Steam Generator Generic Change Package"
01-25-02 Summary of November 28, 2001 Management Meeting with NEI
01-24-02 Letter from W. Traverse to G. A. Postolakis, "Proposed Steam Generator Program Guilelines and Associated Gneric License Change Package"
12-14-01 Letter from G. Apostolakis (ACRS) to Chairmain Meserve, "Proposed Steam Generator Program Guidelines and Associated Generic License Change Package"
11-26-01 Letter from NRC to NEI, "NEI Steam Generator Generic Change Package - Inspection Interval Issue"
11-02-01 Letter from NEI to NRC, "Industry Proposal for Steam Generator Inspection Interval Regulatory Controls"
09-18-01 NRC Memorandum, "NRC Staff Comments on Steam Generator Inspection Intervals"
08-02-01 Letter from NRC to NEI, "NEI Steam Generator Generic Change Package"
02-07-01 Letter from NEI to NRC, "NEI 97-06 Steam Generator Program Guidelines, Revision 1"
01-18-01 Letter from NRC to NEI, "Revised Industry Steam Generator Program License Change Package"
12-15-00 Letter from NRC to NEI, "Indian Point Unit 2 (IP-2) Lessons Learned Task Force Report and the Steam Generator Action Plan"
12-11-00 Letter from NEI to NRC, "Revised Industry Steam Generator Program Generic Change Package"
11-30-00 Letter from NEI to NRC, "Lessons Learned from Recent Steam Generator Experience"
11-08-00 Letter from NEI to NRC, "Interim Guidance for In Situ Pressure Testing"
10-06-00 Letter from NEI to NRC, "Insights and Implications of Steam Generator Operating, Inspecting and Maintenance Experience"
02-04-00 Letter from NEI to NRC, "Industry Steam Generator Program Generic License Change Package"

(To top of page)

Generic Safety Issues (GSI)

The following documents are related to NRC's generic safety issues in the area of steam generator tube integrity.

  • GSI-163 (Multiple Steam Generator Tube Leakage) Description from NUREG-0933
  • NUREG-0933, "A Prioritization of Generic Safety Issues"

(To top of page)

Differing Professional Opinion (DPO) on Steam Generator Issues

The following documents are related to the NRC's research and developmental work in addressing the issues generated from a DPO on steam generators, and staff activities to integrate the results in the regulatory framework.

Date
Description
05-21-04 Letter from M. Bonaca (ACRS) to W. Travers (EDO)
01-18-02 Letter from W. Travers (EDO) to G. Apostolakis
10-18-01 Letter from G. Apostolakis (ACRS) to Chairman Meserve
06-14-01 Letter from G. Apostolakis (ACRS) to Chairman Meserve
06-01-01 Memo from W. Travers (EDO) to Chairman Meserve
06-01-01 Memo from W. Travers (EDO) to G. Apostolakis (ACRS)
05-07-01 Memo from Chairman Meserve to G. Apostolakis (ACRS)
05-04-01 Memo from Chairman Meserve to W. Travers (EDO)
04-24-01 Memo from J. Hopenfeld (DPO author) to Commission
03-05-01 Memo from W. Travers (EDO) to S. Collins (NRR) & A. Thadani (RES), DPO Action Plan Tasking Memo
03-05-01 Memo from W. Travers (EDO) to R. Spence (RES)
03-05-01 Memo from W. Travers (EDO) to J. Hopenfeld (DPO author), DPO closure
03-05-01 Memo from W. Travers (EDO) to J. Larkins (ACRS)
02-2001 NUREG-1740, "Voltage Based Alternative Repair Criteria"
02-01-01 Letter from D. Powers (ACRS) to W. Travers (EDO), transmitting NUREG-1740

DPO Consideration Document

(To top of page)

Indian Point 2

The following historic documents relate to NRC review of the February 15, 2000, Indian Point 2 steam generator tube failure event that led to the development of the steam generator action plan.

Date
Description
12-15-00 NRR Response to RES Regarding RES Independent Reviews
11-03-00 Staff Review of the OIG Report
08-29-00 Office of the Inspector General (OIG) Report related to the Indian Point 2 Steam Generator Tube Failure Event
10-23-00 Indian Point 2 Steam Generator Tube Failure Lessons-Learned Report

(To top of page)

Miscellaneous

Date
Description
08-30-04 GL2004-01, Requirements for Steam Generator Tube Inspection
05-16-03 SECY-03-0080, Steam Generator Tube Integrity (SGTI)-Plans for Revising the Associated Regulatory Framework.
10-31-01 NRC Information Notice 2001-16, "Recent Foreign and Domestic Experience with Degradation of Steam Generator Tubes and Integrity"
03-30-00 SECY-00-0078, Status and Plans for Revising the Steam Generator Tube Integrity Regulatory Framework"

Steam Generator Tube Issues
11-03-00 NRC Regulatory Issue Summary 2000-22, "Issues Stemming from NRC Staff Review of Recent Difficulties Experienced in Maintaining Steam Generator Tube Integrity"