WFLHD Supplements
WFLHD Supplements provide additional information to the FLH PDDM detailing standard practices, guidance, and criteria that pertain to the development of projects within WFLHD.
Supplement Index
See the individual chapters listed on the left menu or the index below for the current supplements.
Supplement | Description | Date |
---|---|---|
9.6.7-1 | Construction schedules | Future |
9.6.8.6-1 | Cost uncertainties, assessment of | 9/30/2010 |
9.6.6.2-1 | Design book assembly | 3/17/2008 |
9.1.3.4-1 | Design exceptions | 9/30/2010 |
9.6.6.6-1 | Design narrative | 12/15/2006 |
9.6.3-1 | Design Process | 10/11/2007 |
7.3.1-1 | Drainage summary | Future |
3.4-1 | Environment | 12/9/1999 |
4.9.2.5-1 | ERFO Project Development | 9/29/1999 |
13.3.2-1 | Feedback, external customer | 10/11/2007 |
7.1-1 | Hydraulics Standard Operating Procedures | 9/30/2010 |
9.6.6.6-2 | PE Hold File Checklist | Future |
12.3.6-1 | Plans, right-of-way | Future |
9.6.5-1 | Plans, standard format | Draft |
9.6.8.5-1 | Prices, development of | 9/30/2010 |
9.6.10-1 | PS&E document handoff | 9/30/2010 |
9.6.4-1 | PS&E Reviews | 9/30/2010 |
9.6.11.2-1 | QA/QC Checklist | Future |
9.6.6.1-1 | Quantity computation | 12/15/2006 |
9.6.8.6-1 | Risk, assessment of | 9/30/2010 |
9.6.1-1 | Signoff process | 3/17/2008 |
9.6.9.3-1 | Special contract requirements, writing | Future |
1.1.6-1 | Supplements, creating and modifying | 11/9/2006 |
9.6.4.4-1 | Title sheet signatures for NPS projects | 3/17/2008 |