PART 63—DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN A GEOLOGIC REPOSITORY AT YUCCA MOUNTAIN, NEVADA
Full Text Version (211.89 KB)
Subpart A—General Provisions
Sec.
63.4 Communications and records.
63.7 License not required for certain preliminary activities.
63.8 Information collection requirements: OMB Approval.
63.10 Completeness and accuracy of information.
Subpart B—Licenses
Preapplication Review
63.16—Review of site characterization activities.
License Application
63.22 Filing and distribution of application.
63.23 Elimination of repetition.
63.24 Updating of application and environmental impact statement.
Construction Authorization
63.31 Construction authorization.
63.32 Conditions of construction authorization.
63.33 Amendment of construction authorization.
License Issuance and Amendment
63.41 Standards for issuance of a license.
63.44 Changes, tests, and experiments.
63.46 Particular activities requiring license amendment.
US/IAEA Safeguards Agreement
63.47 Facility information and verification.
Permanent Closure
63.51 License amendment for permanent closure.
Subpart C—Participation by State Government, Affected Units of Local Government, and Affected Indian Tribes
63.61 Provision of information.
63.63 Participation in license reviews.
Subpart D—Records, Reports, Tests, and Inspections
63.73 Reports of deficiencies.
63.78 Material control and accounting records and reports.
Subpart E—Technical Criteria
63.101 Purpose and nature of findings.
Preclosure Performance Objectives
63.111 Performance objectives for the geologic repository operations area through permanent closure.
Preclosure Safety Analysis
63.112 Requirements for preclosure safety analysis of the geologic repository operations area.
Postclosure Performance Objectives
63.113 Performance objectives for the geologic repository after permanent closure.
Postclosure Performance Assessment
63.114 Requirements for performance assessment.
63.115 Requirements for multiple barriers.
Land Ownership and Control
63.121 Requirements for ownership and control of interests in land.
Subpart F—Performance Confirmation Program
63.132 Confirmation of geotechnical and design parameters.
63.134 Monitoring and testing waste packages.
Subpart G—Quality Assurance
63.142 Quality assurance criteria.
63.144 Quality assurance program change.
Subpart H—Training and Certification of Personnel
63.152 Training and certification program.
Subpart I—Emergency Planning Criteria
63.161 Emergency plan for the geologic repository operations area through permanent closure.
Subpart J—Violations
Subpart K—Preclosure Public Health and Environmental Standards
63.202 Definitions for Subpart K.
63.203 Implementation of Subpart K.
Subpart L—Postclosure Public Health and Environmental Standards
63.302 Definitions for Subpart L.
63.303 Implementation of Subpart L.
63.304 Reasonable expectation.
63.305 Required characteristics of the reference biosphere.
Postclosure Individual Protection Standard
63.311 Individual protection standard after permanent closure.
63.312 Required characteristics of the reasonably maximally exposed individual.
Human-Intrusion Standard
63.321 Individual protection standard for human intrusion.
63.322 Human intrusion scenario.
Ground Water Protection Standards
63.331 Separate standards for protection of ground water.
Additional Provisions
63.342 Limits on performance assessments.
63.343 Severability of individual protection and ground-water protection standards.
Authority: Atomic Energy Act secs. 51, 53, 62, 63, 65, 81, 161, 182, 183, (42 U.S.C. 2071, 2073, 2092, 2093, 2095, 2111, 2201, 2232, 2233); Energy Reorganization Act secs. 201, 202, 206, 211 (42 U.S.C. 5841, 5842, 5846, 5851); sec 14, Pub. L. 95– 601 (42 U.S.C. 2021a); National Environmental Policy Act sec. 102 (42 U.S.C. 4332); Nuclear Waste Policy Act secs. 114, 117, 121 (42 U.S.C. 10134, 10137, 10141; sec. 1704, 112 Stat. 2750 (44 U.S.C. 3504 note); Energy Policy Act of 2005, Pub. L. 109–58, 119 Stat. 594 (2005).
Source: 66 FR 55792, Nov. 2, 2001, unless otherwise noted.
[73 FR 78606, Dec. 23, 2008; 73 FR 63572, Oct. 24, 2008; 74 FR 10829, Mar. 13, 2009; 77 FR 39908, Jul. 6, 2012]