Jumps to site home page. Jumps to site home page. Jumps to the campus home page U.S. Department of Commerce Labs in Boulder, Colorado. Jumps to U.S. Department of Commerce home page.
Site Map | Contact | Opportunities

Outreach

Project 25 Documents & Standards Reference

Revised Jan 29, 2013
Click to enter Feedback

User Needs

Public safety communication system users are responsible for providing and maintaining their user needs in the form of a system requirements document. The Steering Committee, with the involvement of its P25 UNS, establishes the priorities and scope for technical development by TIA of new and revised P25 standards.

The P25 UNS’ ongoing ongoing development of the P25 SoR, as approved by the Steering Committee, plays an essential role in not only developing standards that meet users’ needs but also to establish the basis upon which equipment and systems can be assessed as being compliant with the P25 standards. The P25 SoR also establishes a feasible migration path for P25 equipment and systems to take advantage of emerging technologies. As a result, the P25 SoR establishes a balance between user needs and what industry is able to implement based on current physical, technological, and regulatory constraints. This document is available at:

http://ftp.tiaonline.org/TR-8/APIC/P25 UNS/Public/Current Approved Project 25 Statement of Requirements/

  • Project 25 Statement of Requirements, (Mar 2010)

  • (Project 25 Overview, Detailed Standards Suite Proposed [Common Air Interface, Data Interface, Inter-RF Subsystem Interface, Network Management Interface, Open Console Interface, and Open Fixed/Base Station Interface], P25 System Overview, Encryption, Subscriber Equipment, Interoperability, Migration)