This section is organized in five sections by project type:
- materials, furniture and furnishings replacement
- renovation of individual office spaces, such as conference rooms or break rooms
- small gut rehab projects of an entire suite of offices
- building system upgrades
- sustainable building operations and maintenance services
For each project there is a selection of issues and questions you should consider before selecting specific materials or products. This will help you and your team address the most critical sustainability concerns and opportunities for that project type; look for synergies and mitigate unintended consequences. There are ways to improve even the simplest projects, such as repainting or re-carpeting.
Since this tool is intended for smaller projects, it does not explicitly address projects larger than 10,000 square feet. Larger projects should refer to the LEED® for Commercial Interiors or another appropriate version of the LEED® rating system for further guidance.
STEPS
1. Select a Project Type
Identify a project on the side bar that best represents your project.
2. Identify Opportunities and Constraints
Consider the following issues and questions as you develop your project:
- Are project capital upgrades and renovations fully leveraging sustainable materials, equipment and technologies?
- What is the function(s) of the space? Does the space design support the work environment? For example, is there a need to adjust the proportion of private office space to team meeting space?
- What existing conditions, structures, etc. must be considered? What is the cost of changing them? For example break rooms can be changed, but it is often best to renovate and work around plumbing and other building systems that can be built into the new design.
- How can sustainability goals be implemented? For example, was daylighting considered as an energy saving strategy? Could the project's approach to ambient lighting be made both cost effective and efficient by incorporating daylighting?
- What regulations and requirements affect the project?
- Are there conditions in the lease that should be considered?
- What is the project budget and timeframe?
- Are there other current or future projects that would benefit from joint planning with yours? Could an office renovation be coupled with a furniture refresh? Could a public corridor project be scheduled to coincide with a tenant space improvement?
- What do the users of the space think about the project? Are they satisfied with the current space or would they like to see changes? Are they comfortable?
- Can the project achieve multiple goals, such as sustainable performance, improved work effectiveness, and enhanced organizational image?
- How can you use this opportunity to educate the occupants regarding the sustainable attributes being incorporated into the project?
3. Compare Systems and Materials
Use the Evaluate Section to compare various systems and materials and the Implement Section to record your selections.
4. Tell your Story
Tell your story to teach others using the Share Section.
Provided By
GSA Sustainable Facilities Tool |
Introduction |
Green Products Compilation |
Contact |
Sitemap |
Give Feedback
| Privacy Policy
| Adobe Reader
Site Developed by Noblis, Inc. | Current Site Published: 2/8/2013 10:58:00 AM | Take the survey