Sign In
Asset Management

​The Asset Management site includes information related to BPA's capital investment program, in particular,   status reports for major capital projects, a list of projects anticipated to be submitted for approval, project synopses, and policies that govern BPA’s asset management practices.


Major Capital Project Status Report

The Major Capital Project Status report is provided on a quarterly basis, with the opportunity for external discussion and review at the Quarterly Business Review. The report focuses on the status of major capital projects with respect to cost, schedule and scope/capability targets that are established when projects are approved.

Public Materials for FY 2012


Public Materials for FY 2011


Capital Projects Anticipated to be Submitted for Approval
 
The Capital Projects Anticipated to be Submitted for Approval report is updated on a semi-annual basis. The report lists the major capital projects that are expected to be submitted for agency approval over the next six months. The report includes a brief description of the project along with a cost estimate where available.


Major Project Synopses

 
The Project Synopses are made available on this site when the projects are approved. The synopses provide a brief description of each major project, including the background of the issue being addressed, the objectives of the project and other key project information.
 
  • Desktop Modernization Project
  • JC Microwave Upgrade
  • McNary Governor Replacement
  • Pacific DC Intertie Upgrade
  • Tri Cities Maintenance Headquarters
  • Chief Joseph Governor Replacement
  • Eastside Alternate Operating Facility
  • Grand Coulee 500kV Switchyard Relay Replacement
  • Grand Coulee Keys Pump Generating Station Reliability Investments
  • Horse Butte Wind Interconnection
  • MT to WA Transmission System Upgrade NEPA
  • Puget Sound Area Northern Intertie (PSANI)
  • Jordan Butte Wind Generation Interconnection
  • P25 Two Way Mobile Radio Replacment
  • Rights of Way Access Roads and Land Acquisition FY12 to FY15
  • Summit Ridge Wind Generation Interconnection
  • Sustain Steel Program Defective Damper Replacements
  • Switchgear Replacement for Fault Duty FY12
  • WOMR Group 2 Big Eddy to Knight  
  • Big Cliff Spillway Gate Rehabilitation
  • Central Ferry Generation Interconnection
  • John Day Governor Upgrade
  • The Dalles Powerhouse Governor Upgrade
  • Ross - Schultz Fiber Replacement
  • Bonneville Powerhouse 2 Station Service Replacement
  • Celilo Mercury Containment and Abatement
  • Central Oregon Transformer Addition
  • Control Replacement - COI Capacitors
  • DC Microwave Analog Spur Replacement and SONET Ring
  • Dexter Spillway Gate Rehabilitation
  • Little Goose Area Reinforcement Project
  • Steel Lines Sustain Program FY11-13
  • System Protection and Control Sustain Program FY11-13
  • Synchrophasor Project
  • Palisades Turbine Rehab and Runner Replacement
  • Grand Coulee Pre-Third Power Plant Overhaul Projects
  • Chief Joseph Turbine Runner Replacements Units 1-4, 15-16
  • Grand Coulee SCADA
  • Chief Joseph Turbine Replacements
  • Spacer Damper Replacement Program
  • 3G 1710-1755 MHz Relocation
  • Access Roads
  • Grand Coulee Exitation System Replacement
  • 500kV Spare transformer Project
  • RODS Replacement Project
  • #KC SONET Phase II Spur Healing
  • Network Open Season (NOS) ADF
  • McNary Main Unit 1-4 Stator Winding Replacement
  • Hills Creek Powerhouse Turbine and Unit Rehabilitation
  • Condon Wind Voltage Control
  • DC RAS Upgrade
  • Ice Harbor Turbine Redesign and Runner Replacement
  • #NC Microwave Analog Replacement
  • Black Canyon Third Generating Unit
  • FY10 Fleet Equipment Replacement
  • Grand Coulee Left Power House Transformer Replacement
  • Alvey Shunt Reactor
  • Lower Snake Exciter Replacement
  • Wood Lines Sustain Program FY10 - 13  
  • Other Information
     
     
    This area include policies and other documents related to BPA's asset management practices.
     
    Capital Investment Program Policies

    Frequency of Posting: Monthly
    POC: Dennis Naef
    File format: PDF
    Stay Connected Related Sites