![]() |
projects > ding darling national wildlife refuge - greater everglades baseline information and response to cerp
Ding Darling National Wildlife Refuge - Greater Everglades Baseline Information and Response to CERP
The greater Everglades Restoration program includes a management plan for the C-43 Canal, or Caloosahatchee River. This plan affects the quantity, quality, and timing of freshwater releases at control structure S-79 at Franklin Locks. Freshwater contributions are from Lake Okeechobee, and farming runoff along the canal from Lake Okeechobee to the town of Alva. This study will provide basic information on the effects on the quality of water entering J. N. Ding Darling National Wildlife Refuge as the result of freshwater releases at control structure S-79. Work Plans |
U.S. Department of the Interior, U.S. Geological Survey
This page is: http://www.sofia.usgs.gov/projects/index.php?project_url=ding
Comments and suggestions? Contact: Heather Henkel - Webmaster
Script last updated: 15 January 2013 @ 01:46 PM by BJM. Record creator: KP. Record last updated by: KP.