DEFINITION


GENERAL INFORMATION/NARRATIVE

a. DODI 5000.2 requires that analysis, T&E results, or independent reviews confirm the adequacy of the proposed maintenance plan and programmed support resources to meet objectives for peacetime readiness and wartime employment. It also requires that the ability to support any system be demonstrated before the system is placed in the hands of the user. The LD is conducted to confirm that support resources and tasks developed to sustain the system will function as intended. The LD data is supplemented by supportability related data obtained during developmental test and evaluation (DT&E) and OT&E to confirm the correct resources and tasks have been developed. AR 700–127 identifies the LD as a means for satisfying DOD requirements for all acquisition programs. A request for an LD waiver will be s u b m i t t e d b y t h e M A T D E V t o A s s i s t a n t S e c r e t a r y o f t h e A r m y f o r A c q u i s i t i o n , L o g i s t i c s , a n d T e c h n o l o g y (ASA(ALT)) with supporting rationale and an alternate plan for accomplishing the LD. b. The goals of the LD are to: (1) Validate the supportability of the materiel design including transportability and MANPRINT.(2) Validate the adequacy of maintenance planning for the system (such as maintenance concept, task allocation, maintenance procedures, troubleshooting procedures and test program sets (TPS), prognostics/embedded diagnostics, and support equipment).(3) Validate the final SSP to include interface compatibility of the TMDE and support equipment with the materiel system. (4) Review the technical publications.(5) Validate and update the LMI. c. LD for commercial/NDI programs may be abbreviated if existing supportability data can be obtained and adequately evaluated. Inclusion of a logistics specialist on the source selection evaluation board to evaluate such data is prudent. In some cases it may be necessary to perform a partial LD on commercial/NDI systems after source selectionto verify the maintainability and supportability of the materiel design. d. The LD is a validation process managed by the MATDEV. Maximum use should be made of existing qualitative and quantitative data such as when the item is us ed by another service, industry, or country. In order to minimize cost and schedule risk, existing qualitative and quantitative demonstrations, evaluations, analyses, simulations and tests

should be used to meet LD requirements. The extent of the LD is based on the complexity and characteristics of the system (for example, there is no need to perform a maintenance demonstration if there are no maintenance tasks.) If major configuration changes are required between test articles and production software/hardware, it would be advisable to repeat the affected portions of the LD. This would include repeating portions of the TM verification.

e. The LD is conducted on an engineering prototype item for all developmental systems (hardware and software) oron a production item for commercial/NDI. Modified items and all new changed TMDE, training devices, and support equipment intended for support of the system may also require a partial LD.

f. The LD may be conducted at contractor’s plant, Government maintenance engineering evaluation facility, or test sites. Whenever feasible, the LD should be conducted at an existing support facility similar to intended user facilities to verify facility adequacy or identify any facility deficiencies.

g. The LD is normally conducted on those tasks performed at field level and some sustainment level. h. For ammunition items, the LD normally consists of verification of render safe and EOD procedures. i. The requirements for an LD will be summarized in the system TEMP. 12–5. Procedures a. Review of requirements. The ILSM and SIPT members review the CD, supplemental documentation, and contract specifications to ensure that the requirements are clearly defined and input data to the analyses are available and agreed upon. b. Review of analyses. The results of the LORA, various supportability analyses, LMI, provisioning analysis (see AR 700–18), MANPRINT assessment (see AR 602–2), and transportability analysis (see DODI 4540.7) are reviewed to identify logistic resources, tasks, and issues to be addressed in the LD. c. LD plan. The MATDEV with support of the SIPT prepares the LD plan based on the outcome of the requirements review and initial analyses of the system. The plan should address all opportunities for collection of data to confirm adequacy of the planned support. d. Support resources. These need to be programmed to include use of existing data from the contractor or other users, TM validation and verification, maintainability and prognostics/embedded diagnostics demonstrations, transportability analysis and testing, MANPRINT assessment, TMDE evaluation, and software evaluation. e. Conduct of the LD. Generally the LD is accomplished in increments. LDs may be conducted on system 34 DA PAM 700–56 • 21 April 2006 components and major subassemblies with a final system level LD to verify the component interface. Other tailored LD procedures may be required. In any event, the LD plan provides for a complete and adequate LD to verify the ability of representative support personnel to perform each new task with the support resources included in the SSP in an environment that approximates the expected operational profile. The LD normally consists of— (1) Physical tear down. All operator tasks and specified field-level maintenance tasks contained in the TMs are performed by Target Audience Soldiers. This portion of the LD also serves to review the TM for accuracy/completeness.This portion of the LD also serves as the TM validation to meet the intent of MIL–STD–40051. (2) Maintainability and prognostics/ embedded diagnostics demonstration. Maintenance and troubleshooting tasks as the result of operations or fault simulation or insertion are to be accomplished by typical user personnel to meet the intent of MIL–HDBK–470. Complex systems may require additional demonstrations prior to fielding of TPSs or other support capabilities that are not available for the initial fielding. f. Packaging and handling evaluation. Packaging requirements are validated to meet the intent of AR 700–15. g. MANPRINT assessment. MANPRINT assessments are conducted by the DCS, G–1 for ACAT I and ACAT II programs or by TRADOC for other programs to determine the status and adequacy of MANPRINT efforts and identify any unresolved issues or concerns (see AR 602–2). Based on DA Pam 73–1, the assessment of MANPRINT is an essential element of a system’s evaluation strategy at each decision point. Also, AR 602–2 directs ATEC to include MANPRINT considerations in system T&E, of which the LD is an important source of data. h. TMDE evaluation. TMDE requirements and supportability statement from the U.S. Army TMDE Activity is evaluated for interface compatibility during the LD. i. Software evaluation. Prognostics/diagnostic software will be demonstrated during the LD by fault insertion. The faults inserted will include operator procedure errors and software processing errors that the operator and/or maintainer should be able to detect, fault isolate and correct. MIL–HDBK–470A may be used to determine fault insertion sample size. The designated center for software engineering conducts testing of software and evaluation of PPSS plans and capabilities. j. Transportability engineering analysis. MSDDC–TEA conducts transportability analysis and determines transportability testing needed to ensure transportability requirements are met in accordance with DODI 4540.7. A transportability demonstration may be required if analysis are insufficient to prove otherwise. k. TM/DMWR verification. Government personnel verify the contractor’s previous validation effort if production version of the system is available. Verification may range from typical user personnel performing 100 percent of all operating and maintenance procedures in the publications, to witnessing the validation reviews performed by the contractor to meet the intent of MIL–STD–40051. Complex systems may require a verification of preliminary draft manuals prior to developmental tests/operational tests and a reverification of changes in the final draft manuals prior to fielding. The designated depot works closely with the MATDEV and SIPT to conduct the DMWR verification or pilot overhaul and reports on status and results. l. Final evaluation and report. (1) The PEO/PM/MATDEV prepares the final LD report with the SIPT.

(2) The LD report includes the LD strategy, details on the conduct of the LD, data collection,

analysis results, all quantitative and qualitative findings, and a description of all necessary follow-on actions. LD report findings may come from data existing prior to the LD, development and operational test data, and data derived from the LD Corrective actions are incorporated and verified before the production decision. (3) The LD report is completed at least 45 days prior to the next decision review and provided to the SIPT. (4) The PM, with support from the SIPT, is responsible for the preparation of the LD Plan. The LD Plan is distributed prior to the SIPT meeting that will address the LD. The recommended format is—(a) General.(b) Scope.(c) System description.(d) LD strategy.(e) Participating organizations, responsibilities, and milestones for delivery of SSP.(f) Procedures, detailed plans, and milestones for demonstration activities.(g) Reports (describe who will provide input and the due dates).(h) References.(i) Acronyms.

(j) Distribution.


Logistic Demonstration (LD) Report:  The LD report includes the LD strategy, details on the conduct of the LD, data collection, analysis results, all quantitative and qualitative findings, and a description of all necessary follow-on actions. LD report findings may come from data existing prior to the LD, development and operational test data, and data derived from the LD Corrective actions are incorporated and verified before the production decision.The LD report is completed at least 45 days prior to the next decision review and provided to the SIPT.The PM, with support from the SIPT, is responsible for the preparation of the LD Report.


POLICIES, DIRECTIVES, REGULATIONS, LAWS


BEST PRACTICES, LESSONS LEARNED, STORIES, GUIDES, HANDBOOKS, TEMPLATES, EXAMPLES, TOOLS


COMMUNITIES OF PRACTICE


TRAINING RESOURCES


RELATED ARTICLES


Definition General Info Policies Guides Communities Training Related

List of All Contributions at This Location

No items found.

Popular Tags

Page Information

At this page:
8915 Page Views 0 Pages Emailed
0 Meta-card Views 0 Documents and Videos
0 Questions 0 Attachments Downloaded
0 Answers 0 Videos downloaded
0 Relationships and Highlights
ID247034
Date CreatedTuesday, November 18, 2008 11:24 AM
Date ModifiedFriday, October 9, 2009 11:36 AM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


Browse

https://acc.dau.mil/UI/img/bo/minus.gifIntegrated Logistic Support and Logistic...
https://acc.dau.mil/UI/img/bo/plus.gif Materiel Development Decision ...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Decision Memorandum - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Program Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAcquisition Strategy
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment
https://acc.dau.mil/UI/img/bo/plus.gifAffordability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifAllocated Baseline
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 1
https://acc.dau.mil/UI/img/bo/plus.gifAnalysis of Alternatives (AoA) - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifApprove & Develop Test Equipment and...
https://acc.dau.mil/UI/img/bo/plus.gifAssess Support Needs
https://acc.dau.mil/UI/img/bo/plus.gifAssign ILS Manager
https://acc.dau.mil/UI/img/bo/plus.gifAssign Product Support Integrator
https://acc.dau.mil/UI/img/bo/plus.gifAssign TRADOC Capabilities Manager (TSM)
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan
https://acc.dau.mil/UI/img/bo/plus.gifBasis of Issue Plan Feeder Data
https://acc.dau.mil/UI/img/bo/plus.gifCapability Development Document
https://acc.dau.mil/UI/img/bo/plus.gifCapability Production Document
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 1
https://acc.dau.mil/UI/img/bo/plus.gifComparative Analysis 2
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Concept
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Life Cycle Management...
https://acc.dau.mil/UI/img/bo/plus.gifComputer Resources Support
https://acc.dau.mil/UI/img/bo/plus.gifContinuous Technology
https://acc.dau.mil/UI/img/bo/plus.gifCore Depot Assessment
https://acc.dau.mil/UI/img/bo/plus.gifCore Logistics Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost Analysis
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifCost As Independent Variable - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifCritical Design Review
https://acc.dau.mil/UI/img/bo/plus.gifDA Authenticated Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization Disposal Operations...
https://acc.dau.mil/UI/img/bo/plus.gifDemilitarization/Disposal
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Weapon System Support...
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Capability
https://acc.dau.mil/UI/img/bo/plus.gifDepot Maintenance Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifDepot Test Equipment
https://acc.dau.mil/UI/img/bo/plus.gifDesign Influence
https://acc.dau.mil/UI/img/bo/plus.gifDesign Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDesign Tradeoffs / ILS Tradeoffs ...
https://acc.dau.mil/UI/img/bo/plus.gifDevelop and Test Product Support Package
https://acc.dau.mil/UI/img/bo/plus.gifDevelop Modified Table of Organization &...
https://acc.dau.mil/UI/img/bo/plus.gifDiagnostics and Prognostics...
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Implementation
https://acc.dau.mil/UI/img/bo/plus.gifDisposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifDMSMS Plan
https://acc.dau.mil/UI/img/bo/plus.gifDraft Depot Maintenance Work...
https://acc.dau.mil/UI/img/bo/plus.gifDraft Maintenance Allocation Chart (MAC)...
https://acc.dau.mil/UI/img/bo/plus.gifEarly Fielding Analysis
https://acc.dau.mil/UI/img/bo/plus.gifEngineering and Manufacturing...
https://acc.dau.mil/UI/img/bo/plus.gifEngineering Change Proposals
https://acc.dau.mil/UI/img/bo/plus.gifEngineering for Transportability
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Distribution Plan
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Concept
https://acc.dau.mil/UI/img/bo/plus.gifEquipment Publications Input to...
https://acc.dau.mil/UI/img/bo/plus.gifEstablish ILS Management Program
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Integrated Concept Team
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Maintenance Concept
https://acc.dau.mil/UI/img/bo/plus.gifEstablish Sustainment Requirements and...
https://acc.dau.mil/UI/img/bo/plus.gifExit Documents and Products
https://acc.dau.mil/UI/img/bo/plus.gifFacilities
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFailure Modes Effects and Criticality...
https://acc.dau.mil/UI/img/bo/plus.gifFault Tree Analysis
https://acc.dau.mil/UI/img/bo/plus.gifField Data Through STAMIS
https://acc.dau.mil/UI/img/bo/plus.gifFinal MAC
https://acc.dau.mil/UI/img/bo/plus.gifFinal Reproducible Copy
https://acc.dau.mil/UI/img/bo/plus.gifFull Rate Production
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifFunctional Requirements - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifGovernment-Furnished Equipment (GFE) ...
https://acc.dau.mil/UI/img/bo/plus.gifHandling and Storage Capability
https://acc.dau.mil/UI/img/bo/plus.gifHandling Equipment Considerations
https://acc.dau.mil/UI/img/bo/plus.gifHazardous Material Handling Requirements...
https://acc.dau.mil/UI/img/bo/plus.gifILS Program Metrics
https://acc.dau.mil/UI/img/bo/plus.gifImplement and Deploy Sustainment...
https://acc.dau.mil/UI/img/bo/plus.gifIndependent Logistics Assessment
https://acc.dau.mil/UI/img/bo/plus.gifInitial Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifInitial Capabilities Document
https://acc.dau.mil/UI/img/bo/plus.gifInitial Configuration Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Functional Requirements Analysis...
https://acc.dau.mil/UI/img/bo/plus.gifInitial Maintenance Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Operational Capability (IOC)
https://acc.dau.mil/UI/img/bo/plus.gifInitial Supportability Strategy
https://acc.dau.mil/UI/img/bo/plus.gifInitial System Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifInitial Technical Review
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Logistics Management...
https://acc.dau.mil/UI/img/bo/plus.gifInitiate PBL Activities
https://acc.dau.mil/UI/img/bo/plus.gifInitiate Supportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Baseline Review
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support (ILS) ...
https://acc.dau.mil/UI/img/bo/plus.gifIntegrated Logistics Support Manager
https://acc.dau.mil/UI/img/bo/plus.gifItem Unique Identification Plan
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifLevel of Repair Analysis - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifLife Cycle Cost Analysis
https://acc.dau.mil/UI/img/bo/minus.gifLogistics Demonstration -
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Demonstration Report
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to Capabilities...
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Inputs to TEMP
https://acc.dau.mil/UI/img/bo/plus.gifLogistics Support Considerations
https://acc.dau.mil/UI/img/bo/plus.gifLow Rate Initial Production (LRIP)
https://acc.dau.mil/UI/img/bo/plus.gifMaintain Equipment Publications/Update...
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Labor Requirements
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Operations
https://acc.dau.mil/UI/img/bo/plus.gifMaintenance Planning
https://acc.dau.mil/UI/img/bo/plus.gifManpower and Personnel Integration
https://acc.dau.mil/UI/img/bo/plus.gifManpower Requirements Criteria
https://acc.dau.mil/UI/img/bo/plus.gifMANPRINT Validation
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMarket Research & Investigation - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Fielding Team Report
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMaterial Transfer Plan
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Condition Status Report
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Fielding Plan -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release -
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Release Approval
https://acc.dau.mil/UI/img/bo/plus.gifMateriel Solution Analysis Phase
https://acc.dau.mil/UI/img/bo/plus.gifMilestone A
https://acc.dau.mil/UI/img/bo/plus.gifMilestone B
https://acc.dau.mil/UI/img/bo/plus.gifMilestone C
https://acc.dau.mil/UI/img/bo/plus.gifMission Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModernization Through Spares
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifModification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifMonitor PBL Metrics
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training
https://acc.dau.mil/UI/img/bo/plus.gifNew Equipment Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifNew/Revised Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifOperational Test Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifOperations and Support Phase
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging Handling Storage and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging, Handling, Storage, and...
https://acc.dau.mil/UI/img/bo/plus.gifPackaging,Handling, Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Based Logistics Support
https://acc.dau.mil/UI/img/bo/plus.gifPerformance Metrics
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Agreements
https://acc.dau.mil/UI/img/bo/plus.gifPerformance-Based Support
https://acc.dau.mil/UI/img/bo/plus.gifPhysical Configuration Audit
https://acc.dau.mil/UI/img/bo/plus.gifPlan Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifPlan for Personnel
https://acc.dau.mil/UI/img/bo/plus.gifPlan Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifPlan Technical Data
https://acc.dau.mil/UI/img/bo/plus.gifPlan Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifPost Deployment Software Support
https://acc.dau.mil/UI/img/bo/plus.gifPost Fielding Reviews
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost Production Support Analysis - Phase...
https://acc.dau.mil/UI/img/bo/plus.gifPost-Production Support Plan
https://acc.dau.mil/UI/img/bo/plus.gifPreferred System Concept
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary Design Review
https://acc.dau.mil/UI/img/bo/plus.gifPreliminary System Specification
https://acc.dau.mil/UI/img/bo/plus.gifPre-Planned Product Improvement
https://acc.dau.mil/UI/img/bo/plus.gifProduce Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifProducibility Engineering Plan
https://acc.dau.mil/UI/img/bo/plus.gifProduct Baseline
https://acc.dau.mil/UI/img/bo/plus.gifProduction and Deployment Phase
https://acc.dau.mil/UI/img/bo/plus.gifProduction Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifProgram Facility Funds
https://acc.dau.mil/UI/img/bo/plus.gifProgram Management Activities
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Plan
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Screening
https://acc.dau.mil/UI/img/bo/plus.gifProvisioning Technical Documentation...
https://acc.dau.mil/UI/img/bo/plus.gifPublish DMWR / NMWR
https://acc.dau.mil/UI/img/bo/plus.gifPublish Modification Work Orders
https://acc.dau.mil/UI/img/bo/plus.gifRefine Task Analysis
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance (RCM)...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifReliability Enhancement
https://acc.dau.mil/UI/img/bo/plus.gifReliability-Centered Maintenance...
https://acc.dau.mil/UI/img/bo/plus.gifRemove Obsolete NSNs
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts and Special Tools List
https://acc.dau.mil/UI/img/bo/plus.gifRepair Parts Concept
https://acc.dau.mil/UI/img/bo/plus.gifRescind Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifResident/OJT Training Requirements
https://acc.dau.mil/UI/img/bo/plus.gifRevise PHS&T Guidance
https://acc.dau.mil/UI/img/bo/plus.gifRevise Training Program
https://acc.dau.mil/UI/img/bo/plus.gifSample Data Collection
https://acc.dau.mil/UI/img/bo/plus.gifSchedule Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifSecurity Requirements
https://acc.dau.mil/UI/img/bo/plus.gifSelection and Allocation of Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifSensitivity Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSet System Readiness Objectives (SRO)...
https://acc.dau.mil/UI/img/bo/plus.gifShelf Life
https://acc.dau.mil/UI/img/bo/plus.gifSkills
https://acc.dau.mil/UI/img/bo/plus.gifSoftware Support
https://acc.dau.mil/UI/img/bo/plus.gifSolicitation Documents
https://acc.dau.mil/UI/img/bo/plus.gifSupply Support
https://acc.dau.mil/UI/img/bo/plus.gifSupport Equipment
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 1
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities 2
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Annex
https://acc.dau.mil/UI/img/bo/plus.gifSupport Facilities Concept
https://acc.dau.mil/UI/img/bo/plus.gifSupport for Test Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Standardization...
https://acc.dau.mil/UI/img/bo/plus.gifSupport System Tradeoff Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Analysis
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 2
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Assessment - Phase 3
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Integrated Product Team
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Strategy -
https://acc.dau.mil/UI/img/bo/plus.gifSupportability Test, Evaluation, and...
https://acc.dau.mil/UI/img/bo/plus.gifSustain the System to Achieve Materiel...
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Metrics
https://acc.dau.mil/UI/img/bo/plus.gifSustainment Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Concept Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Engineering Activities
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Baseline
https://acc.dau.mil/UI/img/bo/plus.gifSystem Functional Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem MANPRINT Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Performance Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Requirements Review
https://acc.dau.mil/UI/img/bo/plus.gifSystem Specification
https://acc.dau.mil/UI/img/bo/plus.gifSystem Support Package
https://acc.dau.mil/UI/img/bo/plus.gifSystem Training Plan
https://acc.dau.mil/UI/img/bo/plus.gifSystem Verification Review
https://acc.dau.mil/UI/img/bo/plus.gifTarget Audience Description
https://acc.dau.mil/UI/img/bo/plus.gifTask Analysis -
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Baseline
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Data
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Manual Verification Plan
https://acc.dau.mil/UI/img/bo/plus.gifTechnical Reviews
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Phase
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Development Strategy
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Refreshment Program
https://acc.dau.mil/UI/img/bo/plus.gifTechnology Risk Reduction Assessment
https://acc.dau.mil/UI/img/bo/plus.gifTest and Evaluation Master Plan -
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tool Concept
https://acc.dau.mil/UI/img/bo/plus.gifTest Equipment and Tools
https://acc.dau.mil/UI/img/bo/plus.gifTest Program Sets
https://acc.dau.mil/UI/img/bo/plus.gifTest Readiness Review
https://acc.dau.mil/UI/img/bo/plus.gifTotal Package Fielding
https://acc.dau.mil/UI/img/bo/plus.gifTrained Personnel
https://acc.dau.mil/UI/img/bo/plus.gifTraining — Program of Instruction
https://acc.dau.mil/UI/img/bo/plus.gifTraining and Training Support
https://acc.dau.mil/UI/img/bo/plus.gifTraining Concept
https://acc.dau.mil/UI/img/bo/plus.gifTraining for Test
https://acc.dau.mil/UI/img/bo/plus.gifTraining Materials Determination
https://acc.dau.mil/UI/img/bo/plus.gifTransportability Report
https://acc.dau.mil/UI/img/bo/plus.gifType Classification
https://acc.dau.mil/UI/img/bo/plus.gifType II Business Case Analysis
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Analysis of Alternatives
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Computer Resource Management Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Disposal Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Item Unique Identification (IUID)...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Life Cycle Sustainment Plan (...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Market Research
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Materiel Fielding Plan
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Modification Table of...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate National Stock Numbers (NSN)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Provisioning Data
https://acc.dau.mil/UI/img/bo/plus.gifUpdate System Training Plan (STRAP)
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Systems Engineering Plan -...
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TEMP
https://acc.dau.mil/UI/img/bo/plus.gifUpdate TO&E
https://acc.dau.mil/UI/img/bo/plus.gifUpdate Transportability Report
https://acc.dau.mil/UI/img/bo/plus.gifUse Study
https://acc.dau.mil/UI/img/bo/plus.gifValidate Computer Support
https://acc.dau.mil/UI/img/bo/plus.gifValidate Facility Requirements
https://acc.dau.mil/UI/img/bo/plus.gifValidate MAC
https://acc.dau.mil/UI/img/bo/plus.gifValidate MANPRINT
https://acc.dau.mil/UI/img/bo/plus.gifValidate Packaging Handling Storage &...
https://acc.dau.mil/UI/img/bo/plus.gifValidate Preliminary Technical Manuals
https://acc.dau.mil/UI/img/bo/plus.gifValidate RCM
https://acc.dau.mil/UI/img/bo/plus.gifValidate Repair Parts
https://acc.dau.mil/UI/img/bo/plus.gifValidate Training Systems
https://acc.dau.mil/UI/img/bo/plus.gifVerify DMWR/NMWR
https://acc.dau.mil/UI/img/bo/plus.gifVerify Equipment Publications
https://acc.dau.mil/UI/img/bo/plus.gifWarranties Program
ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8