Banner Icon could not be loaded.

 

Marine Corps Base Camp Pendleton

Photo Gallery
 Box Canyon Landfill Box Canyon Landfill
Solar panels have been installed at IR Site 7, Box Canyon Landfill. This site is in the Long-term Monitoring phase of the IR Program.
 IR Site 1D IR Site 1D
The groundwater at IR Site 1D is currently being treated and disposed of in the wastewater treatment plant.
 IR Site 1H IR Site 1H
Hydroseeding and revegetation are currently underway at IR Site 1H. A Removal Action Complete Report is anticipated on this site.
   IR Site 1111 IR Site 1111
IR Site 1111 has been recommended for no further action for soil at the site. Groundwater monitoring has been completed at IR Site 1111.
 IR Site 30 Revegetation IR Site 30 Revegetation
IR Site 30 is recommended for NFA and closure.
Base Cleanup Efforts and Community Involvement
Text/HTML