Click here a filler image only no relevency to acquisition, logistic, contracting or program management image of a classical greek architechture representing DAU's strength as a business university instructing in DoD Acquisition
          Home      Contact      About ACC      Privacy      Tutorial      DoD Certificate      Feedback
.

Supportability Planning Applications (1 answer)

Question
0
Helpful Votes
Guest portrait
Private

We are interested in garnering subject matter expert opinion and support to utilize the COMPASS and SESAME applications to forecast our logistics support requirements for a deployable training platform.  Are there any Governmental resources that we could leverage to (1) obtain use of these applications; (2) obtain instructions for their use; and/or (3) obtain support to develop our supportability strategy through SME assistance in loading our requirements into these applications?

-- Updated Jan 23, 2013 --

All Responses

  • 0
    Helpful Votes
    Guest portrait
    Private
    Sep 29, 2005

    Best bet for COMPASS is to contact US Army Materiel Command (AMC) Logistics Support Activity (LOGSA), the owners of COMPASS, directly for SME support and/or assistance. A link is available at https://www.logsa.army.mil/alc/compass/ . They can also be reached directly at compass@logsa.army.mil or (256) 955-6310/9937/9117. Of course there's always their LOG 911help tool at https://weblog.logsa.army.mil/log911/index.cfm.

    Re: SESAME: According to the AMSO website (http://www.amso.army.mil/smart/documents/guidelines/chapter4.htm ), "the initial provisioning package can be identified using the Selected Essential-Item Stock for Availability Method (SESAME) model, available through the Communications-Electronics Command (CECOM). This Army-approved model uses inputs such as repair and maintenance task distribution (from COMPASS), component reliability, OPTEMPO, and repair cycle times to identify the least-cost mix of stocks that will provide a required readiness (referred to as an Operational Availability in SESAME). The model can also be used to identify the least expensive way to plus-up an already identified package that does not meet the readiness requirement, to attain the required readiness." Might recommend you contact CECOM or LOGSA for further ideas regarding SME support for SESAME.

Page Information

Popularity of this question:
#34 of 2291 items
0 Helpful votes
At this page:
0 Answers 0 Pages Emailed
2999 Page Views 0 Attachments Downloaded
0 Meta-card Views 0 Videos Downloaded
0 Relationships and Highlights
ID46673
Date CreatedMonday, June 6, 2005 9:52 AM
Date ModifiedWednesday, January 23, 2013 2:43 PM
Version Comment:

Sign In

Login with your CAC

Insert your CAC now, and click this button.


Login with your Password

User Name:

Password:

Forgot your password?

  

Benefits of ACC Membership


ACC Practice Center Version 3.2
  • Application Build 3.2.8
  • Database Version 3.2.8