Definition General Info Policies Guides Communities Training Related
The FMECA identifies the failure modes of the system and its components thus identifying the corrective maintenance requirements. FMECA conducted during the Engineering and Manufacturing Development Phase should leverage previous phase efforts and be conducted to the lowest level of the hardware/software breakdown in order to identify all corrective maintenance actions.
A FMECA systematically identifies the likely modes of failure, the possible effects of each failure, and the criticality of each effect on mission completion, safety, or some other outcome of significance. The FMECA requirements will generally be included under the Reliability Program, however, FMECA requirements for a system must be developed in conjunction with the support analysis program requirements due to the necessity of having FMECA results to conduct some support analyses.
Sign In
Insert your CAC now, and click this button.
User Name:
Password:
Forgot your password?
Benefits of ACC Membership