CFLHD Supplements for Chapter 9 - Highway Design
9.1.3 Exceptions to Design Standards
Supplement 9.1.3.4-1 Documenting Design Exceptions, 11 pages- Purpose: This supplement provides guidance in documenting exceptions to Highway Design Standards within CFLHD using the Highway Design Standards form.
- Approved: 11/21/08
- References:
- CFLHD Highway Design Standards Form (internal version)
- CFLHD Highway Design Standards Form (A/E version)
- Highway Design Standards Form Examples
- Preventative Maintenance Highway Design Standards Memorandum (internal use only)
- Mitigation Strategies for Design Exceptions - FHWA-SA-07-011
9.3.1 Geometric Design Controls
Supplement 9.3.1.2.1-1 Local Roads, 1 page
- Purpose: This supplement describes the process for selecting to use the AASHTO Guidelines for Geometric Design of Very Low-Volume Local Roads (ADT = 400).
- Approved: 11/21/08
9.6.3 PS&E Development at Various Stages of Design
Supplement 9.6.3-1 PS&E Development at Various Stages of Design, 2 pages- Purpose: This supplement describes the process for coordinating with the Cross Functional Team throughout project development.
- Approved: 11/21/08
9.6.4 Reviews
Supplement 9.6.4-1 CFLHD Design Review Procedures, 2 pages- Purpose: This supplement describes the procedures for submitting a project package of plans, specifications, and cost estimate (PS&E package) for review at project milestones listed in the project specific Project Management Plan.
- Approved: 11/21/08
- References:
- Development Checklists
- PS&E Internal Distribution Forms
- CFLHD PS&E Review Comment Sheet
- CFLHD Design Peer Review Procedures and Guidelines (internal use only)
- Purpose: This Supplement describes the process for submitting the completed PS&E package to Contracts at Signoff.
- Approved: < FUTURE >
- References:
- PS&E Advertisement Checklist
9.6.5 Plans
Supplement 9.6.5-1 Standard Format for Plans 3 pages- Purpose: This supplement describes the standard format for project plans created within and for CFLHD.
- Approved: 08/23/2007
- References:
- Sample Plan Sheets
- CFLHD Template Drawings and Files
- CADD Standards Manual
9.6.6 Supporting Information
Supplement 9.6.6.1-1 Computation of Quantities- Purpose: The purpose of this Supplement is to clarify how various quantities are to be calculated.
- Approved: < FUTURE >
- Purpose: This Supplement describes the Design Technical Memorandum prepared during the project development process.
- Approved: 08/23/2007
- References:
- Design Technical Memorandum Template
- FLH Standard Practice Checklist
- Purpose: This Supplement provides guidance for assembling the PE Package.
- Approved: < FUTURE >
9.6.7 Computation of Construction Schedule and Contract Time
Supplement 9.6.7-1 Developing Construction Schedules? pages- Purpose: This supplement provides CFLHD guidance for developing construction schedules.
- Approved: < FUTURE >
- References:
- CFL Guidelines for Developing CPM Schedules
9.6.8 Engineer's Estimate
Supplement 9.6.8.5-1 Development of Prices- Purpose: This supplement explains how prices are developed at the various project development review stages.
- Approved: < FUTURE >
9.6.9 Specifications
Supplement 9.6.9.3-1 Writing Special Contract Requirements, ? pages- Purpose: This supplement provides CFLHD guidance for creating special contract requirements (SCR) for the PS&E package.
- Approved: < FUTURE >
- References:
- CFLHD Library of Supplemental Specifications