Sign In
BP-12 Final Proposal
Final Record of Decision Dates
BP-12 # Title
(DOE/BP #)
#
Pages
Filed Posted
BP-12-A-02 Administrator's Final Record of Decision  (DOE/BP 4330)   7/26/11 7/26/11
BP-12-A-02A Appendix A: Transmission Settlement Agreement  (DOE/BP 4325)   7/26/11 7/26/11
BP-12-A-02B Appendix B: Power Rate Schedules  (DOE/BP 4326)   7/26/11 7/26/11
BP-12-A-02B-E01 Appendix B: Power Rate Schedules  - Corrected Page 11   8/1/11 8/1/11
BP-12-A-02B-E02 Appendix B: Power Rate Schedules  - Corrected Page 18
  8/3/11 8/5/11
   Errata No. 1 to 2012 Power Rate Schedules and General Rate Schedules and GRSPs (FY 2012-2013), October 2011       10/29/11
   2012 Power Rates Schedules and General Rate Schedule Provisions  - Corrected Page 69 [No longer operative document]       10/29/11
   Errata No. 2 to 2012 Power Rate Schedules and General Rate Schedules and GRSPs (FY 2012-2013), October 2011        12/07/11
   2012 Power Rates Schedules and General Rate Schedule Provisions  - Corrected Pages 55 and 69 [No longer operative document]       12/07/11
   Errata No. 3 to 2012 Power Rate Schedules and General Rate Schedules and GRSPs (FY 2012-2013), October 2011       01/17/2012
   Errata No. 4 to 2012 Power Rate Schedules and General Rate Schedules and GRSPs (FY 2012-2013), October 2011     01/17/2012
   2012 Power Rates Schedules and General Rate Schedule Provisions  - Corrected Pages 54 and 83  [No longer operative document]     01/17/2012
  Errata No. 5 to 2012 Power Rate Schedules and General Rate Schedules and GRSPs (FY 2012-2013), October 2011     03/15/2012
  2012 Power Rates Schedules and General Rate Schedule Provisions  - Corrected Page 84     03/15/2012
BP-12-A-02C Appendix C: Transmission, Ancillary and Control Area Service Rate Schedules  (DOE/BP 4327)   7/26/11 7/26/11
BP-12-A-02C-EO1 Appendix C: Transmission, Ancillary and Control Area Service Rate Schedules  - Corrected Page 67   7/28/11 7/28/11
BP-12-A-02C-EO2 Appendix C: Transmission, Ancillary and Control Area Service Rate Schedules  - Corrected Page 101   8/05/11 8/10/11
BP-12-A-03 Tiered Rate Methodology  (DOE/BP 4324)   7/26/11 7/26/11



Studies & Documentation Dates
BP-12 # Title
(DOE/BP #)
#
Pages
Filed Posted
BP-12-FS-BPA-01 Power Rates Study
(DOE/BP 4333)
  7/26/11 7/26/11
BP-12-FS-BPA-01A Power Rates Study Documentation
(DOE/BP 4332)
  7/26/11 7/26/11
BP-12-FS-BPA-02

Power Revenue Requirement Study
(DOE/BP 4335)

  7/26/11 7/26/11
BP-12-FS-BPA-02A Power Revenue Requirement Study Documentation
(DOE/BP 4334)
  7/26/11 7/26/11
BP-12-FS-BPA-03 Power Loads and Resources Study
(DOE/BP 4337)
  7/26/11 7/26/11
BP-12-FS-BPA-03A

Power Loads and Resources Study Documentation
(DOE/BP 4336)

  7/26/11 7/26/11
BP-12-FS-BPA-04 Power Risk and Market Price Study
(DOE/BP 4339)
  7/26/11 7/26/11
BP-12-FS-BPA-04A Power Risk and Market Price Study Documentation
(DOE/BP 4338)
  7/26/11 7/26/11
BP-12-FS-BPA-05 Generation Inputs Study
(DOE/BP 4340)
  7/26/11 7/26/11
BP-12-FS-BPA-05A

Generation Inputs Study Documentation
(DOE/BP 4341)

  7/26/11 7/26/11
BP-12-FS-BPA-06 Unused      
BP-12-FS-BPA-06A Unused      
BP-12-FS-BPA-07

Transmission Revenue Requirement Study
(DOE/BP 4331)

  7/26/11 7/26/11
BP-12-FS-BPA-07A

Transmission Revenue Requirement Study Documentation  (DOE/BP 4342)

  7/26/11 7/26/11

Stay Connected Related Sites