The assessment program collects information from inspections and performance indicators (PIs) in order to enable the agency to arrive at objective conclusions about the licensee's safety performance. Based on this assessment information, the NRC determines the appropriate level of agency response, including supplemental inspection and pertinent regulatory actions ranging from management meetings up to and including orders for plant shutdown. The Action Matrix Summary listed below reflects overall plant performance and is updated regularly to reflect inputs from the most recent performance indicators and inspection findings. Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.

For those plants that are in the Regulatory Response Column, Degraded Cornerstone Column, Multiple/Repetitive Degraded Cornerstone Column, and Unacceptable Performance Column of the Action Matrix, notes are provided to explain the assessment inputs that direct the associated regulatory response. Additionally, information on the current level of inspection at each reactor unit (based on deviations from the Action Matrix, supplemental inspection status, etc.) is also found below. For any licensee in the Licensee Response Column, the expected agency inspection is the baseline program.

The substantive cross-cutting issues are available on the ROP Substantive Cross Cutting Issues Summary page for each of the plants.

Last Modified: 02-04-2013

Current Regulatory Oversight Table

Region I | Region II | Region III | Region IV | Action Matrix Summary

Top of page Region I

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Beaver Valley 1 Regulatory Response Column

Beaver Valley 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Beaver Valley 2 Regulatory Response Column

Beaver Valley 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Calvert Cliffs 1 Licensee Response Column

Baseline inspection
Calvert Cliffs 2 Licensee Response Column

Baseline inspection
FitzPatrick Regulatory Response Column

FitzPatrick is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Ginna Licensee Response Column

Baseline inspection
Hope Creek 1 Licensee Response Column

Baseline inspection
Indian Point 2 Licensee Response Column  Baseline inspection
Indian Point 3 Licensee Response Column  Baseline inspection
Limerick 1 Licensee Response Column  Baseline inspection
Limerick 2 Licensee Response Column

Baseline inspection
Millstone 2 Licensee Response Column

Baseline inspection
Millstone 3 Licensee Response Column  Baseline inspection
Nine Mile Point 1 Regulatory Response Column

Nine Mile Point 2 is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Nine Mile Point 2 Licensee Response Column

Baseline inspection
Oyster Creek Licensee Response Column  Baseline inspection
Peach Bottom 2 Licensee Response Column  Baseline inspection
Peach Bottom 3 Licensee Response Column  Baseline inspection
Pilgrim 1 Licensee Response Column

Baseline Inspection
Salem 1 Licensee Response Column

Baseline inspection
Salem 2 Licensee Response Column

Baseline inspection
Seabrook 1 Regulatory Response Column

Seabrook 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection

and

ROP Action Matrix deviation in effect
Susquehanna 1 Licensee Response Column

Baseline inspection
Susquehanna 2 Licensee Response Column  Baseline inspection
Three Mile Island 1 Licensee Response Column  Baseline inspection
Vermont Yankee Licensee Response Column  Baseline inspection

Top of page Region II

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Browns Ferry 1 Multiple/Repetitive Degraded Cornerstone Column

Browns Ferry 1 is in Column 4 because of a red finding in the Mitigating Systems Cornerstone originating in 4Q2010.
Baseline inspection

and

IP 95003 supplemental inspection
Browns Ferry 2 Regulatory Response Column

Browns Ferry 2 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Browns Ferry 3 Regulatory Response Column

Browns Ferry 3 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Brunswick 1 Licensee Response Column

Baseline inspection
Brunswick 2 Licensee Response Column

Baseline inspection
Catawba 1 Regulatory Response Column

Catawba 1 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Catawba 2 Licensee Response Column  Baseline inspection
Crystal River 3 Licensee Response Column

Baseline inspection
Farley 1 Licensee Response Column

Baseline inspection
Farley 2 Licensee Response Column

Baseline inspection
Harris 1 Regulatory Response Column

Harris is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Hatch 1 Licensee Response Column  Baseline inspection
Hatch 2 Licensee Response Column  Baseline inspection
McGuire 1 Licensee Response Column  Baseline inspection
McGuire 2 Licensee Response Column  Baseline inspection
North Anna 1 Licensee Response Column

Baseline inspection
North Anna 2 Licensee Response Column

Baseline inspection
Oconee 1 Licensee Response Column

Baseline inspection
Oconee 2 Licensee Response Column

Baseline inspection
Oconee 3 Licensee Response Column

Baseline inspection
Robinson 2 Licensee Response Column

Baseline inspection
Saint Lucie 1 Licensee Response Column

Baseline inspection
Saint Lucie 2 Licensee Response Column  Baseline inspection
Sequoyah 1 Licensee Response Column

Baseline inspection
Sequoyah 2 Licensee Response Column  Baseline inspection
Summer Licensee Response Column  Baseline inspection
Surry 1 Licensee Response Column  Baseline inspection
Surry 2 Licensee Response Column  Baseline inspection
Turkey Point 3 Licensee Response Column

Baseline inspection
Turkey Point 4 Licensee Response Column

Baseline inspection
Vogtle 1 Licensee Response Column  Baseline inspection
Vogtle 2 Licensee Response Column  Baseline inspection
Watts Bar 1 Licensee Response Column

The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Watts Bar is in Column 1.
Baseline inspection

Top of page Region III

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Braidwood 1 Licensee Response Column  Baseline inspection
Braidwood 2 Licensee Response Column

Baseline inspection
Byron 1 Licensee Response Column  Baseline inspection
Byron 2 Licensee Response Column

Baseline inspection
Clinton Licensee Response Column  Baseline inspection
D.C. Cook 1 Licensee Response Column  Baseline inspection
D.C. Cook 2 Licensee Response Column  Baseline inspection
Davis-Besse Regulatory Response Column

Davis-Besse is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Dresden 2 Licensee Response Column  Baseline inspection
Dresden 3 Licensee Response Column  Baseline inspection
Duane Arnold Licensee Response Column  Baseline inspection
Fermi 2 Regulatory Response Column

Fermi is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Kewaunee Licensee Response Column  Baseline inspection
La Salle 1 Licensee Response Column  Baseline inspection
La Salle 2 Licensee Response Column  Baseline inspection
Monticello Licensee Response Column  Baseline inspection
Palisades Licensee Response Column

Baseline inspection

and

ROP Action Matrix deviation in effect
Perry 1 Degraded Cornerstone Column

Perry 1 is in Column 3 because of one white Occupational Radiation Safety Cornerstone PI and one white finding in the Occupational Radiation Safety Cornerstone both originating in 2Q2011.
Baseline inspection

and

IP 95002 supplemental inspection

and

Action Matrix Deviation
Point Beach 1 Regulatory Response Column

Point Beach 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Point Beach 2 Regulatory Response Column

Point Beach 2 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
Prairie Island 1 Licensee Response Column

Baseline inspection
Prairie Island 2 Licensee Response Column

Baseline inspection
Quad Cities 1 Licensee Response Column  Baseline inspection
Quad Cities 2 Licensee Response Column  Baseline inspection

Top of page Region IV

Reactor UnitAction Matrix ColumnCurrent Regulatory Oversight
Arkansas Nuclear 1 Licensee Response Column  Baseline inspection
Arkansas Nuclear 2 Licensee Response Column  Baseline inspection
Callaway Licensee Response Column

Baseline inspection
Columbia Generating Station Degraded Cornerstone Column

Columbia Generating Station is in Column 3 because of two white findings in the Emergency Preparedness Cornerstone originating 2Q2012.
Baseline inspection

and

IP 95002 supplemental inspection
Comanche Peak 1 Licensee Response Column  Baseline inspection
Comanche Peak 2 Licensee Response Column  Baseline inspection
Cooper Licensee Response Column

Baseline inspection
Diablo Canyon 1 Licensee Response Column  Baseline inspection
Diablo Canyon 2 Licensee Response Column  Baseline inspection
Fort Calhoun Under IMC 0350

Fort Calhoun is under the oversight of inspection manual chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition due to Significant Performance and/or Operational Concerns." For more information please see the letter dated December 13, 2011 (ML113470721).
Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's regulatory activities associated with assessing the performance issues at Fort Calhoun.
Grand Gulf 1 Licensee Response Column  Baseline inspection
Palo Verde 1 Licensee Response Column

Baseline inspection
Palo Verde 2 Licensee Response Column

Baseline inspection
Palo Verde 3 Licensee Response Column

Baseline inspection
River Bend 1 Licensee Response Column

Baseline inspection
San Onofre 2 Regulatory Response Column

San Onofre 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
San Onofre 3 Regulatory Response Column

San Onofre 3 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95001 supplemental inspection
South Texas 1 Licensee Response Column  Baseline inspection
South Texas 2 Licensee Response Column  Baseline inspection
Waterford 3 Licensee Response Column

Baseline inspection
Wolf Creek 1 Degraded Cornerstone Column

Wolf Creek is in Column 3 because of a yellow finding in the Initiating Events Cornerstone originating in 3Q2012. Wolf Creek also has a white PI in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection

and

IP 95002 supplemental inspection


Top of page  Action Matrix Summary

Licensee Response Column Regulatory Response Column Degraded Cornerstone Column Multiple/Repetitive Degraded Cornerstone Column Unacceptable Performance Column
Arkansas Nuclear 1 Beaver Valley 1 Columbia Generating Station Browns Ferry 1  
Arkansas Nuclear 2 Beaver Valley 2 Perry 1    
Braidwood 1 Browns Ferry 2 Wolf Creek 1    
Braidwood 2 Browns Ferry 3      
Brunswick 1 Catawba 1      
Brunswick 2 Davis-Besse      
Byron 1 Fermi 2      
Byron 2 FitzPatrick      
Callaway Harris 1      
Calvert Cliffs 1 Nine Mile Point 1      
Calvert Cliffs 2 Point Beach 1      
Catawba 2 Point Beach 2      
Clinton San Onofre 2      
Comanche Peak 1 San Onofre 3      
Comanche Peak 2 Seabrook 1      
Cooper        
Crystal River 3        
D.C. Cook 1        
D.C. Cook 2        
Diablo Canyon 1        
Diablo Canyon 2        
Dresden 2        
Dresden 3        
Duane Arnold        
Farley 1        
Farley 2        
Ginna        
Grand Gulf 1        
Hatch 1        
Hatch 2        
Hope Creek 1        
Indian Point 2        
Indian Point 3        
Kewaunee        
La Salle 1        
La Salle 2        
Limerick 1        
Limerick 2        
McGuire 1        
McGuire 2        
Millstone 2        
Millstone 3        
Monticello        
Nine Mile Point 2        
North Anna 1        
North Anna 2        
Oconee 1        
Oconee 2        
Oconee 3        
Oyster Creek        
Palisades        
Palo Verde 1        
Palo Verde 2        
Palo Verde 3        
Peach Bottom 2        
Peach Bottom 3        
Pilgrim 1        
Prairie Island 1        
Prairie Island 2        
Quad Cities 1        
Quad Cities 2        
River Bend 1        
Robinson 2        
Saint Lucie 1        
Saint Lucie 2        
Salem 1        
Salem 2        
Sequoyah 1        
Sequoyah 2        
South Texas 1        
South Texas 2        
Summer        
Surry 1        
Surry 2        
Susquehanna 1        
Susquehanna 2        
Three Mile Island 1        
Turkey Point 3        
Turkey Point 4        
Vermont Yankee        
Vogtle 1        
Vogtle 2        
Waterford 3        
Watts Bar 1        

Top of pageTop of Page


Last modification: Feb 04, 2013