ROP Action Matrix Summary and Current Regulatory Oversight
The assessment program collects information from inspections and performance indicators (PIs) in order to enable the agency to arrive at objective conclusions about the licensee's safety performance. Based on this assessment information, the NRC determines the appropriate level of agency response, including supplemental inspection and pertinent regulatory actions ranging from management meetings up to and including orders for plant shutdown. The Action Matrix Summary listed below reflects overall plant performance and is updated regularly to reflect inputs from the most recent performance indicators and inspection findings. Although the Security Cornerstone is included in the Reactor Oversight Process assessment program, the Commission has decided that specific information related to findings and performance indicators pertaining to the Security Cornerstone will not be publicly available to ensure that security information is not provided to a possible adversary. Other than the fact that a finding or performance indicator is Green or Greater-Than-Green, security related information will not be displayed on the public web page.
For those plants that are in the Regulatory Response Column, Degraded Cornerstone Column, Multiple/Repetitive Degraded Cornerstone Column, and Unacceptable Performance Column of the Action Matrix, notes are provided to explain the assessment inputs that direct the associated regulatory response. Additionally, information on the current level of inspection at each reactor unit (based on deviations from the Action Matrix, supplemental inspection status, etc.) is also found below. For any licensee in the Licensee Response Column, the expected agency inspection is the baseline program.
The substantive cross-cutting issues are available on the ROP Substantive Cross Cutting Issues Summary page for each of the plants.
Last Modified: 02-04-2013
Current Regulatory Oversight Table
Region I | Region II | Region III | Region IV | Action Matrix Summary
 Region I
Reactor Unit Action Matrix Column Current Regulatory Oversight
Beaver Valley 1
Regulatory Response Column
Beaver Valley 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Beaver Valley 2
Regulatory Response Column
Beaver Valley 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Calvert Cliffs 1
Licensee Response Column
Baseline inspection
Calvert Cliffs 2
Licensee Response Column
Baseline inspection
FitzPatrick
Regulatory Response Column
FitzPatrick is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Ginna
Licensee Response Column
Baseline inspection
Hope Creek 1
Licensee Response Column
Baseline inspection
Indian Point 2
Licensee Response Column
Baseline inspection
Indian Point 3
Licensee Response Column
Baseline inspection
Limerick 1
Licensee Response Column
Baseline inspection
Limerick 2
Licensee Response Column
Baseline inspection
Millstone 2
Licensee Response Column
Baseline inspection
Millstone 3
Licensee Response Column
Baseline inspection
Nine Mile Point 1
Regulatory Response Column
Nine Mile Point 2 is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Nine Mile Point 2
Licensee Response Column
Baseline inspection
Oyster Creek
Licensee Response Column
Baseline inspection
Peach Bottom 2
Licensee Response Column
Baseline inspection
Peach Bottom 3
Licensee Response Column
Baseline inspection
Pilgrim 1
Licensee Response Column
Baseline Inspection
Salem 1
Licensee Response Column
Baseline inspection
Salem 2
Licensee Response Column
Baseline inspection
Seabrook 1
Regulatory Response Column
Seabrook 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
and
ROP Action Matrix deviation in effect
Susquehanna 1
Licensee Response Column
Baseline inspection
Susquehanna 2
Licensee Response Column
Baseline inspection
Three Mile Island 1
Licensee Response Column
Baseline inspection
Vermont Yankee
Licensee Response Column
Baseline inspection
 Region II
Reactor Unit Action Matrix Column Current Regulatory Oversight
Browns Ferry 1
Multiple/Repetitive Degraded Cornerstone Column
Browns Ferry 1 is in Column 4 because of a red finding in the Mitigating Systems Cornerstone originating in 4Q2010.
Baseline inspection
and
IP 95003 supplemental inspection
Browns Ferry 2
Regulatory Response Column
Browns Ferry 2 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Browns Ferry 3
Regulatory Response Column
Browns Ferry 3 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Brunswick 1
Licensee Response Column
Baseline inspection
Brunswick 2
Licensee Response Column
Baseline inspection
Catawba 1
Regulatory Response Column
Catawba 1 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Catawba 2
Licensee Response Column
Baseline inspection
Crystal River 3
Licensee Response Column
Baseline inspection
Farley 1
Licensee Response Column
Baseline inspection
Farley 2
Licensee Response Column
Baseline inspection
Harris 1
Regulatory Response Column
Harris is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Hatch 1
Licensee Response Column
Baseline inspection
Hatch 2
Licensee Response Column
Baseline inspection
McGuire 1
Licensee Response Column
Baseline inspection
McGuire 2
Licensee Response Column
Baseline inspection
North Anna 1
Licensee Response Column
Baseline inspection
North Anna 2
Licensee Response Column
Baseline inspection
Oconee 1
Licensee Response Column
Baseline inspection
Oconee 2
Licensee Response Column
Baseline inspection
Oconee 3
Licensee Response Column
Baseline inspection
Robinson 2
Licensee Response Column
Baseline inspection
Saint Lucie 1
Licensee Response Column
Baseline inspection
Saint Lucie 2
Licensee Response Column
Baseline inspection
Sequoyah 1
Licensee Response Column
Baseline inspection
Sequoyah 2
Licensee Response Column
Baseline inspection
Summer
Licensee Response Column
Baseline inspection
Surry 1
Licensee Response Column
Baseline inspection
Surry 2
Licensee Response Column
Baseline inspection
Turkey Point 3
Licensee Response Column
Baseline inspection
Turkey Point 4
Licensee Response Column
Baseline inspection
Vogtle 1
Licensee Response Column
Baseline inspection
Vogtle 2
Licensee Response Column
Baseline inspection
Watts Bar 1
Licensee Response Column
The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Watts Bar is in Column 1.
Baseline inspection
 Region III
Reactor Unit Action Matrix Column Current Regulatory Oversight
Braidwood 1
Licensee Response Column
Baseline inspection
Braidwood 2
Licensee Response Column
Baseline inspection
Byron 1
Licensee Response Column
Baseline inspection
Byron 2
Licensee Response Column
Baseline inspection
Clinton
Licensee Response Column
Baseline inspection
D.C. Cook 1
Licensee Response Column
Baseline inspection
D.C. Cook 2
Licensee Response Column
Baseline inspection
Davis-Besse
Regulatory Response Column
Davis-Besse is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Dresden 2
Licensee Response Column
Baseline inspection
Dresden 3
Licensee Response Column
Baseline inspection
Duane Arnold
Licensee Response Column
Baseline inspection
Fermi 2
Regulatory Response Column
Fermi is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Kewaunee
Licensee Response Column
Baseline inspection
La Salle 1
Licensee Response Column
Baseline inspection
La Salle 2
Licensee Response Column
Baseline inspection
Monticello
Licensee Response Column
Baseline inspection
Palisades
Licensee Response Column
Baseline inspection
and
ROP Action Matrix deviation in effect
Perry 1
Degraded Cornerstone Column
Perry 1 is in Column 3 because of one white Occupational Radiation Safety Cornerstone PI and one white finding in the Occupational Radiation Safety Cornerstone both originating in 2Q2011.
Baseline inspection
and
IP 95002 supplemental inspection
and
Action Matrix Deviation
Point Beach 1
Regulatory Response Column
Point Beach 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Point Beach 2
Regulatory Response Column
Point Beach 2 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
Prairie Island 1
Licensee Response Column
Baseline inspection
Prairie Island 2
Licensee Response Column
Baseline inspection
Quad Cities 1
Licensee Response Column
Baseline inspection
Quad Cities 2
Licensee Response Column
Baseline inspection
 Region IV
Reactor Unit Action Matrix Column Current Regulatory Oversight
Arkansas Nuclear 1
Licensee Response Column
Baseline inspection
Arkansas Nuclear 2
Licensee Response Column
Baseline inspection
Callaway
Licensee Response Column
Baseline inspection
Columbia Generating Station
Degraded Cornerstone Column
Columbia Generating Station is in Column 3 because of two white findings in the Emergency Preparedness Cornerstone originating 2Q2012.
Baseline inspection
and
IP 95002 supplemental inspection
Comanche Peak 1
Licensee Response Column
Baseline inspection
Comanche Peak 2
Licensee Response Column
Baseline inspection
Cooper
Licensee Response Column
Baseline inspection
Diablo Canyon 1
Licensee Response Column
Baseline inspection
Diablo Canyon 2
Licensee Response Column
Baseline inspection
Fort Calhoun
Under IMC 0350
Fort Calhoun is under the oversight of inspection manual chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition due to Significant Performance and/or Operational Concerns." For more information please see the letter dated December 13, 2011 (ML113470721).
Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's regulatory activities associated with assessing the performance issues at Fort Calhoun.
Grand Gulf 1
Licensee Response Column
Baseline inspection
Palo Verde 1
Licensee Response Column
Baseline inspection
Palo Verde 2
Licensee Response Column
Baseline inspection
Palo Verde 3
Licensee Response Column
Baseline inspection
River Bend 1
Licensee Response Column
Baseline inspection
San Onofre 2
Regulatory Response Column
San Onofre 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
San Onofre 3
Regulatory Response Column
San Onofre 3 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95001 supplemental inspection
South Texas 1
Licensee Response Column
Baseline inspection
South Texas 2
Licensee Response Column
Baseline inspection
Waterford 3
Licensee Response Column
Baseline inspection
Wolf Creek 1
Degraded Cornerstone Column
Wolf Creek is in Column 3 because of a yellow finding in the Initiating Events Cornerstone originating in 3Q2012. Wolf Creek also has a white PI in the Mitigating Systems Cornerstone originating in 2Q2012.
Baseline inspection
and
IP 95002 supplemental inspection
  Action Matrix Summary
Top of Page
Last modification: Feb 04, 2013
Current Regulatory Oversight Table
Region I | Region II | Region III | Region IV | Action Matrix Summary
 Region I
Reactor Unit | Action Matrix Column | Current Regulatory Oversight |
Beaver Valley 1 | Regulatory Response Column Beaver Valley 1 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Beaver Valley 2 | Regulatory Response Column Beaver Valley 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Calvert Cliffs 1 | Licensee Response Column |
Baseline inspection |
Calvert Cliffs 2 | Licensee Response Column |
Baseline inspection |
FitzPatrick | Regulatory Response Column FitzPatrick is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Ginna | Licensee Response Column |
Baseline inspection |
Hope Creek 1 | Licensee Response Column |
Baseline inspection |
Indian Point 2 | Licensee Response Column | Baseline inspection |
Indian Point 3 | Licensee Response Column | Baseline inspection |
Limerick 1 | Licensee Response Column | Baseline inspection |
Limerick 2 | Licensee Response Column |
Baseline inspection |
Millstone 2 | Licensee Response Column |
Baseline inspection |
Millstone 3 | Licensee Response Column | Baseline inspection |
Nine Mile Point 1 | Regulatory Response Column Nine Mile Point 2 is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Nine Mile Point 2 | Licensee Response Column |
Baseline inspection |
Oyster Creek | Licensee Response Column | Baseline inspection |
Peach Bottom 2 | Licensee Response Column | Baseline inspection |
Peach Bottom 3 | Licensee Response Column | Baseline inspection |
Pilgrim 1 | Licensee Response Column |
Baseline Inspection |
Salem 1 | Licensee Response Column |
Baseline inspection |
Salem 2 | Licensee Response Column |
Baseline inspection |
Seabrook 1 | Regulatory Response Column Seabrook 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection and ROP Action Matrix deviation in effect |
Susquehanna 1 | Licensee Response Column |
Baseline inspection |
Susquehanna 2 | Licensee Response Column | Baseline inspection |
Three Mile Island 1 | Licensee Response Column | Baseline inspection |
Vermont Yankee | Licensee Response Column | Baseline inspection |
 Region II
Reactor Unit | Action Matrix Column | Current Regulatory Oversight |
Browns Ferry 1 | Multiple/Repetitive Degraded Cornerstone Column Browns Ferry 1 is in Column 4 because of a red finding in the Mitigating Systems Cornerstone originating in 4Q2010. |
Baseline inspection and IP 95003 supplemental inspection |
Browns Ferry 2 | Regulatory Response Column Browns Ferry 2 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Browns Ferry 3 | Regulatory Response Column Browns Ferry 3 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Brunswick 1 | Licensee Response Column |
Baseline inspection |
Brunswick 2 | Licensee Response Column |
Baseline inspection |
Catawba 1 | Regulatory Response Column Catawba 1 is in Column 2 because of a white finding in the Mitigating Systems Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Catawba 2 | Licensee Response Column | Baseline inspection |
Crystal River 3 | Licensee Response Column |
Baseline inspection |
Farley 1 | Licensee Response Column |
Baseline inspection |
Farley 2 | Licensee Response Column |
Baseline inspection |
Harris 1 | Regulatory Response Column Harris is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Hatch 1 | Licensee Response Column | Baseline inspection |
Hatch 2 | Licensee Response Column | Baseline inspection |
McGuire 1 | Licensee Response Column | Baseline inspection |
McGuire 2 | Licensee Response Column | Baseline inspection |
North Anna 1 | Licensee Response Column |
Baseline inspection |
North Anna 2 | Licensee Response Column |
Baseline inspection |
Oconee 1 | Licensee Response Column |
Baseline inspection |
Oconee 2 | Licensee Response Column |
Baseline inspection |
Oconee 3 | Licensee Response Column |
Baseline inspection |
Robinson 2 | Licensee Response Column |
Baseline inspection |
Saint Lucie 1 | Licensee Response Column |
Baseline inspection |
Saint Lucie 2 | Licensee Response Column | Baseline inspection |
Sequoyah 1 | Licensee Response Column |
Baseline inspection |
Sequoyah 2 | Licensee Response Column | Baseline inspection |
Summer | Licensee Response Column | Baseline inspection |
Surry 1 | Licensee Response Column | Baseline inspection |
Surry 2 | Licensee Response Column | Baseline inspection |
Turkey Point 3 | Licensee Response Column |
Baseline inspection |
Turkey Point 4 | Licensee Response Column |
Baseline inspection |
Vogtle 1 | Licensee Response Column | Baseline inspection |
Vogtle 2 | Licensee Response Column | Baseline inspection |
Watts Bar 1 | Licensee Response Column The Inspection Findings Summary and Unit Performance Summary pages indicate a greater-than-green finding under the Security Cornerstone. The supplemental inspection was performed satisfactorily. As of 3Q2012, the finding is closed and Watts Bar is in Column 1. |
Baseline inspection |
 Region III
Reactor Unit | Action Matrix Column | Current Regulatory Oversight |
Braidwood 1 | Licensee Response Column | Baseline inspection |
Braidwood 2 | Licensee Response Column |
Baseline inspection |
Byron 1 | Licensee Response Column | Baseline inspection |
Byron 2 | Licensee Response Column |
Baseline inspection |
Clinton | Licensee Response Column | Baseline inspection |
D.C. Cook 1 | Licensee Response Column | Baseline inspection |
D.C. Cook 2 | Licensee Response Column | Baseline inspection |
Davis-Besse | Regulatory Response Column Davis-Besse is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 3Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Dresden 2 | Licensee Response Column | Baseline inspection |
Dresden 3 | Licensee Response Column | Baseline inspection |
Duane Arnold | Licensee Response Column | Baseline inspection |
Fermi 2 | Regulatory Response Column Fermi is in Column 2 because of a white performance indicator in the Initiating Events Cornerstone originating in 4Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Kewaunee | Licensee Response Column | Baseline inspection |
La Salle 1 | Licensee Response Column | Baseline inspection |
La Salle 2 | Licensee Response Column | Baseline inspection |
Monticello | Licensee Response Column | Baseline inspection |
Palisades | Licensee Response Column |
Baseline inspection and ROP Action Matrix deviation in effect |
Perry 1 | Degraded Cornerstone Column Perry 1 is in Column 3 because of one white Occupational Radiation Safety Cornerstone PI and one white finding in the Occupational Radiation Safety Cornerstone both originating in 2Q2011. |
Baseline inspection and IP 95002 supplemental inspection and Action Matrix Deviation |
Point Beach 1 | Regulatory Response Column Point Beach 1 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Point Beach 2 | Regulatory Response Column Point Beach 2 is in Column 2 because of a white finding in the Emergency Preparedness Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
Prairie Island 1 | Licensee Response Column |
Baseline inspection |
Prairie Island 2 | Licensee Response Column |
Baseline inspection |
Quad Cities 1 | Licensee Response Column | Baseline inspection |
Quad Cities 2 | Licensee Response Column | Baseline inspection |
 Region IV
Reactor Unit | Action Matrix Column | Current Regulatory Oversight |
Arkansas Nuclear 1 | Licensee Response Column | Baseline inspection |
Arkansas Nuclear 2 | Licensee Response Column | Baseline inspection |
Callaway | Licensee Response Column |
Baseline inspection |
Columbia Generating Station | Degraded Cornerstone Column Columbia Generating Station is in Column 3 because of two white findings in the Emergency Preparedness Cornerstone originating 2Q2012. |
Baseline inspection and IP 95002 supplemental inspection |
Comanche Peak 1 | Licensee Response Column | Baseline inspection |
Comanche Peak 2 | Licensee Response Column | Baseline inspection |
Cooper | Licensee Response Column |
Baseline inspection |
Diablo Canyon 1 | Licensee Response Column | Baseline inspection |
Diablo Canyon 2 | Licensee Response Column | Baseline inspection |
Fort Calhoun | Under IMC 0350 Fort Calhoun is under the oversight of inspection manual chapter 0350, "Oversight of Reactor Facilities in a Shutdown Condition due to Significant Performance and/or Operational Concerns." For more information please see the letter dated December 13, 2011 (ML113470721). |
Nuclear Regulatory Commission staff has established a special oversight panel to coordinate the agency's regulatory activities associated with assessing the performance issues at Fort Calhoun. |
Grand Gulf 1 | Licensee Response Column | Baseline inspection |
Palo Verde 1 | Licensee Response Column |
Baseline inspection |
Palo Verde 2 | Licensee Response Column |
Baseline inspection |
Palo Verde 3 | Licensee Response Column |
Baseline inspection |
River Bend 1 | Licensee Response Column |
Baseline inspection |
San Onofre 2 | Regulatory Response Column San Onofre 2 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
San Onofre 3 | Regulatory Response Column San Onofre 3 is in Column 2 because of one or more greater-than-green finding(s) in the Security Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95001 supplemental inspection |
South Texas 1 | Licensee Response Column | Baseline inspection |
South Texas 2 | Licensee Response Column | Baseline inspection |
Waterford 3 | Licensee Response Column |
Baseline inspection |
Wolf Creek 1 | Degraded Cornerstone Column Wolf Creek is in Column 3 because of a yellow finding in the Initiating Events Cornerstone originating in 3Q2012. Wolf Creek also has a white PI in the Mitigating Systems Cornerstone originating in 2Q2012. |
Baseline inspection and IP 95002 supplemental inspection |
  Action Matrix Summary
Top of Page
Last modification: Feb 04, 2013