FY 2002 PLHD Awards (As Of September 27, 2006)
State | Project Description | Total Award | "Earmarked" Portion[1] | Discretionary Portion |
---|---|---|---|---|
Alabama | Unimproved County Road off US Highway 43 at the Town of Forkland, US Army Corps of Engineers Forkland Park Recreation Area, Greene County - prepare and pave existing dirt road | $475,000 | $475,000 | |
Alabama | Resurface and traffic stripe that part of AL-176 that lies within the Little River Canyon National Preserve, DeKalb County | $350,000 | $350,000 | |
Alaska | Walden Point Road on Annette Island between the Metlakatla Indian Community and the new ferry terminal location at Annette Bay - 1. Construction materials and associated support for the military road building effort - $1,400,000. 2. Relocation of the waterline from Chester Lake - $3,000,000. 3. Construct a pioneer road accessing the top of cuts from Annette Bay to Walden Point - $2,000,000 | $2,000,000 | $2,000,000 | |
Alaska | Alaska Maritime National Wildlife Refuge site improvements and parking, Homer - site improvements such as the visitor/staff parking associated with the Marine Center, along with the education foot trails, bike trails and associated landscaping | $850,000 | $850,000 | |
Alaska | Upgrade and improve Petersville Road near Trapper Creek and Lake Louise Road at Lake Louise, Matanuska-Susitna Borough | $500,000 | $500,000 | |
Alaska | Construction of approximately 14 miles of two-lane road to complete the connection between Town of Eureka, on the Elliott Highway, and Village of Rampart, on the Yukon River | $500,000 | $500,000 | |
Alaska | Resurfacing of Main Road/Airport Access Road, MP 0 to approximately MP3 and Nagai Loop Road, MP 0 to approximately MP 2.5, in Sand Point, Alaska | $1,500,000 | $1,500,000 | |
Alaska | Preliminary engineering for Chugach Road Project (also known as the Shotgun Cove Road) extending from the City of Whittier to Neptune Point, East of Shotgun Cove | $650,000 | $650,000 | |
Alaska | Environmental, preliminary engineering and initial survey work for Dillingham Wood River Road reconstruction of approximately 2.8 miles of road from its intersection with Kanakanak Road to the end of Wood River Road at Wood River Landing, City of Dillingham | $800,000 | $800,000 | |
Arizona / Nevada | Hoover Dam Bypass (US93 Phoenix/Las Vegas Highway) from MP 2.2 in Clark County, Nevada to MP 1.7 in Mohave County, Arizona, in the Lake Mead National Recreation Area - construction of bridge and approach roadways | $8,000,000 | $8,000,000 | |
Arizona | Diamond Bar Road from Route 261 to Indian Route 1, accessing the southwestern rim of the Grand Canyon, on the Hualapai Indian Reservation, Mohave County - 14 miles of roadway reconstruction, including grading, drainage, and paving | $3,000,000 | $3,000,000 | |
California | Pala Road, Pechanga Indian Reservation, City of Temecula, Riverside County - widen roadway to 4 and 6 lanes, provide curb, gutter, sidewalks, signals, bike lanes, drainage improvements, and landscaping | $4,000,000 | $4,000,000 | |
California | Presidio of San Francisco, Golden Gate National Recreation Area, San Francisco County - establish an internal shuttle bus system, improve transit/shuttle stops, and provide way-finding kiosks | $1,000,000 | $1,000,000 | |
California | Belardo Road Bridge over Tahquitz Creek from Ramon Road south 1 mile to East Palm Canyon Drive, and Mesquite Avenue from Belardo Road to west end, within the Agua Caliente Band of Cahuilla Indians Reservation, Riverside County - construct bridge and missing gap road segments on Belardo Road & Mesquite Ave | $3,000,000 | $3,000,000 | |
California | High Desert Corridor - new limited access facility parallel to SR-18, from US-395 in Adelanto to SR-18 east of Apple Valley, with a new interchange at I-15, including additional auxiliary lanes (These funds were originally designated for the Death Valley Road project, but Congress redesignated them for this project in FY2006) | $2,000,000 | $2,000,000 | |
Colorado | State Highway 149, South Fork to Creede, within the Rio Grande National Forest, in Rio Grande and Mineral Counties - resurface 20 miles of pavement, replace 4200 feet of guardrail and 800 feet of bridge rail | $3,700,000 | $3,700,000 | |
Colorado | New county road connecting US 50 and SH 194 in Bent and Otero Counties in southeastern Colorado, near entrance to Bent's Old Fort - engineering and environmental studies for a proposed new access road to Bent's Old Fort National Historic Site | $500,000 | $500,000 | |
Florida | Timucuan Preserve Bicycle Touring Route along US Highway A-1-A from the Nassau Sound Bridge through Big Talbot Island within the right-of-way of Highway A-1-A and adjacent park lands, across the St. Johns River (via the St. Johns River Ferry) through the Village of Mayport along the Wonderwood Expressway to Hanna Park, Duval County - Phase 2 construction of a paved bicycle-touring path | $1,000,000 | $1,000,000 | |
Hawaii | Statewide Improvements at various national parks and memorials including Hawaii Volcanoes, Haleakala, Pu'uhonua O Honaunau, Kaloko Honokohau, and the USS Arizona Memorial, and various national wildlife refuges, including Kealia Pond and Kilauea Point | $6,000,000 | $6,000,000 | |
Idaho | Clark Fork River Bridge, 0.5 miles south and 0.3 miles west of the City of Clark Fork on Old FAS route 5788, MP 99.6 to MP 100.2, Bonner County - replacement of current single-lane bridge with a two-lane bridge adequate to handle logging trucks and other commercial and recreational traffic | $2,500,000 | $2,500,000 | |
Idaho | City of Rocks Back Country Byway, from Connor's Corner to the City of Rocks' National Reserve entrance, one mile south of Almo, Cassia County - correction of deteriorated road and slope conditions, roadway widening, and improvement of road alignment (Phase 1 of 4 construction phases covers approximately one quarter of the 16.7-mile project) | $2,000,000 | $2,000,000 | |
Illinois | U.S. 30 from the western border of Whiteside County at Fulton, Illinois to Interstate 88 outside of Rock Falls, Illinois (19.2 miles between Fulton and Rock Falls) - Corridor study, including a review of a beltway around the community of Morrison, as opposed to cutting through the middle of town | $750,000 | $750,000 | |
Kansas | Broughton Bridge at U.S. Army Corps of Engineers Milford Lake, 1.5 miles W. & 5.5 miles N. of Wakefield, Clay County - replace bridge & grading | $1,500,000 | $1,500,000 | |
Kentucky | Clarks River National Wildlife Refuge, Marshall County - Elevate, resurface, pave, and repair bridges on access roads | $2,000,000 | $2,000,000 | |
Kentucky | Reconstruction and safety improvement of 4.2 miles of Cold Hill Road in Laurel County | $1,400,000 | $1,400,000 | |
Kentucky | Reconstruction and Safety Improvements to Craigs Creek Road in Laurel County | $995,000 | $995,000 | |
Kentucky | Reconstruction and safety improvement to the Daniel Boone Parkway between milepoints 37 to 44 in Leslie County | $1,500,000 | $1,500,000 | |
Maine | Route 3 from Route 198 to Hadlock Bridge, Mount Desert Island - reconstruction of 0.9 miles of deficient roadway, including paved shoulder | $500,000 | $500,000 | |
Maine | Acadia National Park, Mount Desert Island, Hancock County: five bicycle / pedestrian trails (apx. 6 miles) to provide car free access from Mt. Desert Island villages to Acadia National Park, two historic Trails (apx. 5 miles) as prototypes, and a trail kiosk for education and outreach to trail users | $500,000 | $500,000 | |
Massachusetts | New Bedford Whaling National Historic Park, Bristol County - interpretive and directional signs | $400,000 | $400,000 | |
Massachusetts | Lowell National Historic Park, Middlesex County - design of the Western Canalway-Western Canal Park, Hamilton Canalway, and Riverwalk Phase II Extension phases of Lowell's urban greenway | $563,000 | $563,000 | |
Mississippi | Noxubee River Bridge Replacement and Road Improvements, in Tombigbee National Forest, Choctaw and Winston Counties - bridge replacement and resurfacing of roads | $1,000,000 | $1,000,000 | |
Mississippi | State Route 16 from North Loop Road to State Route 15 in Neshoba County - add 2 lanes parallel to existing two lanes | $7,400,000 | $7,400,000 | |
Montana | Giant Springs Road (Urban Route 5221) from RP 0.489 to 0.989, within the Great Falls Urban Area, Cascade County - Phase II of a road relocation project, includes completion of project by rectifying pedestrian safety issues, ingress and egress problems, parking, overhead lighting, trail access, and on-site operations | $1,200,000 | $1,200,000 | |
Montana | Albion - North and South (Secondary Route 323, Ekalaka-Alzada Corridor), from RP 52 to 62, Carter County - roadway reconstruction | $2,000,000 | $2,000,000 | |
Montana | Fort Peck Lake public access roads: The Knutson Pit located about 17 aeronautical miles southeast of Malta (T28N, R30E, Section 20) in Phillips County, The Spencer Pit located about 60 aeronautical miles south of Malta and north of the Fourchette Creek Recreational Area (T24N, R31E, Section 25) also in Phillips County, and The Old Smokey Pit in Nashua (T28N, R41E, Section 35) in Valley County - crushing gravel and stock piling for use by County forces to improve the safety and drivability on roads providing access to the Fort Peck Lake and CM Russell National Wildlife Refuge | $500,000 | $500,000 | |
Montana | Miller Creek Road in the Miller Creek and Linda Vista area. Specifically, the project is located in T12N, R19W, PMM Sections 18, 19, 20, 21, 22, 23, 24, & 35 and T12N, R20W, PMM Sections 1, 2, 10, 11, 12, 13, & 14 - preliminary design and environmental work for transportation improvements to the Miller Creek area, including a new bridge to be constructed across the Bitterroot River to access Highway 93, and a new road to be constructed to the bridge from Lower Miller Creek road. Lower Miller Creek road will also be designed and improved. | $5,000,000 | $5,000,000 | |
Montana | US 2 - Havre to Fort Belknap Reference Post 383.815 to 428.518 to the junction of north/south state route MT66. Project is in the counties of Hill and Blaine. Environmental Impact Statement (EIS) development to explore the benefits and impacts of reconstructing the road to a 4-lane configuration rather than the current 2-lane configuration | $1,000,000 | $1,000,000 | |
Nebraska | Lewis & Clark Trail, State Spur 26E - construct 1.7-mile bicycle and pedestrian facility to connect the City of Ponca, Ponca State Park, and the 59-mile Missouri National Recreational River Corridor | $325,000 | $325,000 | |
Nevada | U.S. 95, from just south of Searchlight to approx 19 miles north, Clark County - roadbed modification/overlay on existing two-lane highway and construction of a new adjacent two-lane roadway, thus creating a four-lane divided highway | $8,000,000 | $8,000,000 | |
Nevada | SR146, St. Rose Parkway and I-15 Interchange, between I-15 and I-215 from Milepost CL 0.00 to CL 6.67 in the southern portion of the Las Vegas Valley, Clark County - first stage would construct St. Rose Parkway from I-15 to Gillespie as a four-lane arterial, St. Rose Parkway from Gillespie to Spencer Street/Seven Hills Drive as a six-lane arterial, and St. Rose Parkway from Spencer Street/Seven Hills Drive to I-215 as an eight-lane arterial | $4,000,000 | $4,000,000 | |
New Jersey | Delaware Water Gap National Recreational Area, Warren and Sussex Counties - preliminary engineering (design), construction, and construction engineering (oversight) of South Old Mine Road | $1,000,000 | $1,000,000 | |
New Mexico | Jicarilla Apace Indian Reservation Access Rd, NM 537from MP 45.5 north for 10.4 miles to US-64, Rio Arriba County - roadway reconstruction | $1,000,000 | $1,000,000 | |
New Mexico | Jemez Pueblo Bypass, NM 4 from NM 44 (US 550) to NM 290, on the Jemez Pueblo Indian Reservation, Sandoval County - final design for roadway reconstruction | $150,000 | $150,000 | |
New Mexico | US 666 from 16.46 miles north of Gallup, north for 68 miles in McKinley and San Juan Counties, within the Navajo Nation - preliminary and final design for 4-laning of 68 miles of roadway | $1,000,000 | $1,000,000 | |
New Mexico | Jemez Pueblo Bypass, CN?3480/TPM-004-1(9), NM 4, milepost 0, at the junction with NM 44(to be renamed US 550), north for 6.16 miles to the junction with NM 290 in Sandoval County, within the Jemez Pueblo Indian Reservation - final design and initial constuction of bypass | $1,000,000 | $1,000,000 | |
New York | Saratoga Monument, within the Saratoga National Historical Park, Town of Saratoga, Village of Victory, Saratoga County - improve visitor access and circulation: construct parking lot, sidewalks, restrooms, lighting and visitor orientation devices | $280,000 | $280,000 | |
North Dakota | Confluence Trail, at the confluence of the Yellowstone and Missouri Rivers, Fort Union Trading Post National Historic Site, Williams County - construction of 3.6 mile trail with 2 small bridges | $400,000 | $400,000 | |
North Dakota | Lewis & Clark Bicentennial Roadway on ND 23, from the Drags Wolf Village and Bakersfield housing areas easterly 2.3 miles to Lake Sakakawea, on the Fort Berthold Indian Reservation, Mountrail County - reconstruction of 2.3 miles of roadway through the tribal headquarters and casino area of the reservation | $1,000,000 | $1,000,000 | |
Oregon | US 26, 40 miles east of Portland, from Zigzag to Rhododendron, at the western boundary of the Mt. Hood National Forest, Clackamas County - widen a 2-lane section of highway to 4-lanes with turn refuges, and replace an existing 2-lane bridge with a 4-lane facility that enhances fish passage | $1,750,000 | $1,750,000 | |
Pennsylvania | Route 113 Heritage Corridor Partnership Land Use/Transportation Study - Conduct of a two year study to evaluate infrastructure needs and historic context to enable preparation of appropriate land use policies to guide growth, preserve history and guide strategic infrastructure investments | $170,000 | $170,000 | |
Rhode Island | Woonsocket Depot, in the John H. Chafee Blackstone River Valley National Heritage Corridor, Providence County - restoration and renovation of the historic Woonsocket Depot | $650,000 | $650,000 | |
Rhode Island | Blackstone River Bikeway in the John H. Chafee Blackstone River Valley National Heritage Corridor, Lincoln and Cumberland - construct Segment 4B of the bikeway | $1,500,000 | $1,500,000 | |
South Dakota | Highway #10 in Wind Cave National Park, Custer County - roadway rehabilitation, including pavement resurfacing, curb and gutter, and guardrail | $1,250,000 | $1,250,000 | |
South Dakota | SD 63 within the Standing Rock Indian Reservation from the North Dakota/South Dakota stateline south for 6 miles, and from within the community of McLaughlin south for 4.7 miles, Corson County - roadway reconstruction | $4,000,000 | $4,000,000 | |
South Dakota | Bureau of Indian Affairs (BIA) Road #15 and Marshall County Road #10, from SD 10, north on BIA # 15 for 4.3 miles then continuing northeast on Marshall County Road # 10 for 2.8 miles to the west boundary of Sica Hollow State Park, Marshall County - design and right-of-way acquisition for roadway reconstruction | $400,000 | $400,000 | |
Texas | Amistad National Recreation Area Box Canyon Ramp Road, west of US 90 for 8.3 miles through Box Canyon Estates to the Amistad National Park Service boat ramp, Val Verde County - paving of dirt roadway | $4,500,000 | $4,500,000 | |
Texas | Ivy Mountain Road, from FM 116 to FM 3470, in Fort Hood Military Reservation, Coryell County - 3.3 miles of roadway rehabilitation | $1,000,000 | $1,000,000 | |
Utah | Arches National Park, Grand County - Relocate main entrance intersection and construct a road from the new intersection to the existing park entrance road | $1,000,000 | $1,000,000 | |
Utah | State Route 153, within Fishlake National Forest connecting Beaver and Piute Counties - Prepare environmental documents and preliminary design for road surface improvement | $1,000,000 | $1,000,000 | |
Utah | Bear River Migratory Bird Refuge Access Road, from the Bear River Migratory Bird Refuge (Reference Point 0) to the I-15 Southbound ramps (Reference post 15+4.838), North-Central, Utah, West of Brigham City, Box Elder County - additional environmental clearance and preliminary design of roadway reconstruction | $250,000 | $250,000 | |
Vermont | Blueberry Lake Dam, on Town Highway Number 28, Plunkton Road, Town of Warren, Washington County - major maintenance work on the earthen dam that underlies Plunkton Road at the southern end of Blueberry Lake, including provisions for reducing damaging erosion from Plunkton Road, and replacement of the guardrail along Plunkton Road to meet highway standards | $500,000 | $500,000 | |
Virginia | Route 600, adjacent to and within the Mount Rogers National Recreation Area, north of Route 603, Smyth County - realign/reconstruct 3.046-mile section of road south of Rte 762 and 1.357-mile section north of Rte 603 | $750,000 | $750,000 | |
Virginia | Herbert H. Bateman Educational and Administrative Center, Chincoteague National Wildlife Refuge, Assateague Island, Accomack County - demolition of existing buildings, construction of buildings, parking lots, access roads, pedestrian and bicycle trails, and realignment of Beach Road | $1,500,000 | $1,500,000 | |
Virginia | Traffic Circle at the Mount Vernon Memorial Parkway (George Washington Memorial Parkway) and Virginia State Route 235 at the entrance to the Mt. Vernon Estate and Gardens, Fairfax County - study and design of trail improvement alternatives at the traffic circle intersection of the Mt. Vernon Memorial Highway and Virginia State Route 235 | $100,000 | $100,000 | |
Virginia | U.S. Marine Corps Heritage Center Access Improvements, starting at Route 1, just south of Route 619, and looping to the West and then ending again at a point further to the South on Route 1 - design and construction of a two-lane access road to the construction site of the Marine Corps Heritage Center | $800,000 | $800,000 | |
Virginia | 14th Street Bridges over the Potomac River and Ohio Drive, George Washington Memorial Parkway and the Humpback Bridge, George Washington Memorial Parkway's Columbia Island Marina - safety and traffic operation improvements to the 14th Street Bridges, I-395 approaching the 14th Street Bridges, GWMP Humpback Bridge, and the interchange between them. Work also includes access improvements to the Columbia Island Marina. Bridge construction may include widening for acceleration and deceleration lanes and other safety improvements to the bridges and approaches. The project may also include improvements on roads within the District of Columbia. | $11,000,000 | $11,000,000 | |
West Virginia | Glade Creek Road, Brooklyn Road and Cunard Road, New River Gorge National River, Fayette County - preliminary engineering (design), construction, and construction engineering (oversight) for roadway reconstruction and rehabilitation of Glade Creek Road, Brooklyn Road, and Cunard Road, including drainage repair, correction of slope failures, gravel and asphalt overlay, and pavement markings | $3,500,000 | $3,500,000 | |
Wyoming | Fort Washakie to Ft. Stephens Road, Fremont County - right-of-way acquisition and utilities work along the 17 Mile Road section | $939,649 | $939,649 | |
TOTALS | 69 Projects | $127,247,649 | $126,308,000 | $939,649 |
Footnotes
1. This funding was designated by Congress in the FY 2002 DOT Appropriations Act (Public Law 107-87) conference report (House Report 107-308).