- Engineering Changes
General Information: All Engineering Change Proposals (ECPs), Value
Engineering Change Proposals (VECPs), and Requests for Deviation (RFDs)
must be submitted electronically. Please refer to the clause in your
contract entitled Configuration Control - Engineering Changes for
acceptable formats. The forms suggested below are Microsoft Word
files that can be saved onto your PC, completed, and submitted per
the directions specified in the clause.
For questions regarding this information,
Please contact The Product Data Management Team at (586) 282-5372.
- Zinc Phosphate Coating on Metal Surfaces
Pre-approval of the process for Zinc Phosphate Coating on metal surfaces is
required. If the contractor has a government-approved process already
in place, pre-production approval in accordance with (IAW) section 3
of TT-C-490 may be waived or amended at the discretion of the
government. Requests for Deviation (RFD) shall be submitted to the
government for approval. There is no QPL list of vendors for this
process
- Technical Data and Drawings
Unless
another POC is listed by the individual topic, send comments or
questions to the ACC - Warren ProcurementNetwork via E-MAIL to:
USARMY Detroit Arsenal ACC Mailbox WRN Web Page .
|