Awarded Contracts
AZ | CA | CO | HI | ID | KS | NE | NV | NM | ND | OK | SD | TX | UT | WY
Arizona
AZ FTNP/PLH/NPS GLCA 5(2) & 99(1)Awarded to: SBBI, Inc. AZ PFH 3-1(2), Clint's Well RoadAwarded to: Fann Contracting, Inc. (928-776-0170) AZ NPS GRCA 12(8), Tusayan Shuttle Bus Parking LotAwarded to: West Point Contractors, Inc. (520-742-6565) AZ PFH 49-1(1), Apache Trail Retaining WallsAwarded to: Technology Construction, Inc. AZ BLM 93(1), Monolith Gardens Trailhead TurnoffAwarded to: McCormick Construction Company AZ PRA CACH 10(2), South Rim DriveAwarded to: Ledcor CMI, Inc (602-595-3017) AZ GRCA PRES 1(10), Grand Canyon Pave Pres - South RimAwarded to: Fann Contracting, Inc (928-778-0170)
AZ PFH 43-1(4), Sunrise Park - Big Lake RoadAwarded to: SBBI, Inc.Contract Amount:$7,543,396.00 Schedule A, Options X & Y Date of Award: 12/3/09 AZ ERFO 39-1(8), General Hitchcock HighwayAwarded to: Intermountain West Civil Constructors, Inc. (928-474-4988)Contract Amount: $1,161,115.00 Date of Award: 7/24/09 AZ PFH 43-1(3), Sunrise Park - Big Lake RoadAwarded to: GRG Construction Co., Inc. (520-544-8933)Contract Amount:$4,956,800.00 (Schedule B) Date of Award: 06/18/09 AZ PRA GRCA 12(6), CVIP & Mather Point ImprovementsAwarded to: Brown and White, Inc. (520-624-9860)Contract Amount:$5,341,391.41 (Schedule A & Option Y) Date of Award: 04/03/09 AZ PRA PEFO 10(4), Repair & Overlay Park RoadsAwarded to: Intermountain West Civil Constructors, Inc.Contract Amount: 1,474,695.50 (Schedule B & Option X) Date of Award: 02/12/09 AZ PFH 3-1(1), Flagstaff-Clints Well RoadAwarded to: Vastco, Inc (928-636-3880)Contract Amount: $10,946,500.00 (Schedule C) Date of Award:1/13/09 |
AZ PRA GRCA 15(1) & 12(3), Hermit Road & South Entrane RoadAwarded to: Fann Contracting, Inc (928-778-0170) AZ/NV HPP 93(4), Hoover Dam Bypass Interim SurfacingAwarded to: Las Vegas Paving Corporation (702-251-5800)Contract Amount: $6,505,066.50 (Schedule A & Options X and Y) Date of Award: 12/06/07 AZ PRA FLAG 10(2), Sunset Crater-Wupatki Loop RoadAwarded to: Fann Contracting, Inc. (928-778-0170)Contract Amount: $6,867,377.00 (Schedule A & Option X) Date of Award: 12/27/06 AZ PFH 43-1(2), Sunrise Park-Big Lake RoadAwarded to: FANN Contracting, Inc. 928-778-0170Contract Amount: $15,523,539.00 Date of Award: 6/26/06 AZ PRA SAGU 500(1) & 100(1), Cactus Forest DriveAwarded to: Granite Construction Schedule BContract Amount: $ 2,025,893.00 Date of Award: 4/18/06 AZ PFH 43-1(1), Sunrise Park - Big Lake RoadNo bids received.No award will be made as solicited. AZ-NV HPP 93(3), Hoover Dam Bypass Colorado River BridgeAwarded to: Obayashi Corporation/PSM Construction USA, Inc.A Joint Venture (650-952-4910) Contract Amount: $114,000,000.00 Date of Award: 10/22/04 |
California
CA PRA GOGA 104(1) & 105(2), Bunker & Mitchell Rds.Awarded to: Maggiora & Ghilotti, Inc. CA FTNP JOTR 11(3), Pinto Basin RoadAwarded to: Granite Construction Company CA PFH 112-1(2)Awarded to: West Coast Contractors, Inc. CA PRA/NPS SEKI BRIDGE PRES 1(11)Awarded to: T.L. Peterson, Inc. (530-529-0768) CA PRA/NPS YOSE PRES 1(12)Awarded to: Eagle Peak Rock & Paving, Inc. CA PFH 190-1(1), Fish Hatchery RoadAwarded to: Martin Brothers Construction, Inc.(916-381-0911) CA PFH 169-1(1), Old Red Bluff RoadAwarded to: Dig It Construction, Inc. CA RRP STLA 100(1) & 904(1), Entrance Road - Stone Lakes National Wildlife Refuge (8(a) Set-Aside)Awarded to: Martin Brothers Construction CA PRA/NPS SEKI-PRES 10(1) & 10(9a), Generals Highway Pavement Preservation and Halstead Meadows Bridge Construction - Sequoia Kings Canyon National ParkAwarded to: Martin Brothers Construction (916-381-0911) CA PFH 119-1(3), Quincy-Oroville RoadAwarded to: Steve Manning Construction, Inc. CA PRA SEKI 205(1), Kings River BridgeAwarded to: Allen Engineering Contractor, Inc. (909-478-5500) CA PFH 138-1(1), Mammoth Scenic LoopAwarded to: Qualcon Contractors, Inc. Contract Amount: $4,922,880.00 (Schedule A) Date of Award: 6/2/10 CA BLM 19006(1), Panoche Access Road & TrailheadAwarded to: Alpine Diversified, Inc. (559) 924-8324) Contract Amount: $1,388,417.50 (Schedule A, Options T and Y) Date of Award: 5/26/10 CA PRA SEKI 10(8), Generals HighwayAwarded to: Allen Engineering Contractor, Inc. (909-478-5500)Contract Amount: $13,451,012.50 (Schedule B and Option X) Date of Award: 2/3/10 CA PRA YOSE 14(4), Wawona RoadAwarded to: Granite Construction Company, (831-724-1011) CA PRA/NPS PWR-PRES-2(09), Pacific West Pave PresAwarded to: Cactus Transport, Inc. Schedule A, Options W, X, Y & Z CA PRA GOGA 109(1), et al Conzelman Road - Golden Gate National Recreation Area Awarded to:Ghilotti Bros, Inc. (415-454-7011) CA PRA DEVA 109(1), Ubehebe Crater Road Awarded to: Hal Hays Construction, Inc. (951-788-0703) CA PRA/NPS PWR-PRES-1(09) Awarded to:Franklin Construction,Inc.(530-343-9600) CA PFH 137-1(4), Wentworth Springs Road Awarded to: Teichert Construction (916-386-6800) CA PRA-DEVA 11(2), Bonnie Clare Road Awarded to: Eagle Peak Rock and Paving, Inc. (530-233-4568) CA PRA YOSE 15(1), Glacier Point Road Awarded to: Eagle Peak Rock and Paving, Inc. (530-233-4568) CA PFH 123-1(1), Washington Road Awarded to: Abide International (707-935-1577) CA PRA SEKI 10(9), Generals Highway Awarded to: Construction Development Systems (559-251-3425) CA PFH 112-1(1), South Fork Smith River RoadAwarded to: Tidewater Contractors, Inc (541-469-5341)Contract Amount: $13,869,876.20 (Schedule C & Option X) Date of Award: January 30, 2009 CA ERFO 13(1), Six Rivers OrleansAwarded to: Hard Rock Construction (530-695-3100)Contract Amount: $2,482,371.00 Date of Award: June 9, 2008 CA ERFO 82(2), Klamath-Elk Creek RoadAwarded to: Oregon Mt. Constructors, Inc. (530-224-1337)Contract Amount: $767,660.00 Date of Award: May 30, 2008 CA ERFO 102(1), Sawyers Bar RoadAwarded to Hayes & Sons, Inc. (530-493-2679)Contract Amount: $1,237,500.00 Date of Award: May 30, 2008 CA ERFO 4(1), 6(1), Six Rivers - Lower TrinityAwarded to R. Brown Construction Company, Inc (530-629-3702)Contract Amount: $732,021.50 Date of Award: May 27, 2008 CA PFH 114-1(1), Hyampom RoadAwarded to Steve Manning Construction (530-222-0810)Contract Amount: $16,995,397.80 Date of Award: May 19, 2008 |
CA ERFO 1(1) Los Padres 2005 Various RoutesAwarded to: Jurin Construction, Inc. ((530) 629-4534)
CA PRA YOSE 16(2), El Portal RoadAwarded to: Emmett's Excavation, Inc (559-299-1256)Contract Amount: $8,748,620.00 Date of Award: September 12, 2007 CA ERFO 8(1), Old Ridge RouteAwarded to: K.C. Equipment, Inc., (619-443-9730) CA ERFO 5(1), Los Padres 2005 Santa YnezAwarded to: CKY, Incorporated (310-519-4000)Contract Amount: $734,500.00 Date of Award: September 6, 2007 CA PRA 102(1), Crescent Meadow Road, Morro Rock Loop,and Parking Areas - Sequoia Kings Canyon National ParkAwarded to: Construction Development Systems (559-251-3425)Contract Amount: $2,388,520.00 Date of Award: August 22, 2007 CA PRA YOSE 13(4), Big Oak Flat RoadAwarded to: Intermountain Slurry Seal, Inc. (831-724-1011)Contract Amount: $1,986,451.40 Date of Award: August 16, 2007 CA PFH 116-1(1), Trinity Mountain RoadAwarded to: Eagle Peak Rock & Paving, Inc. (530-233-4568)Contract Amount: $4,292,676.00 Date of Award: July 24, 2007 CA PRAJOTR 13(1), Keys View RoadAwarded to: Vance Corporation (909-355-4333)Contract Amount: $7,688.699.10 Date of Award: February 26, 2007 CA PRA LAVO 10(2), Lassen Park RoadAwarded to: Steve Manning Construction, Inc. (530-222-0810)Contract Amount: $9,878,548.50 Date of Award: January 30, 2007 CA PFH 81-1(1), Lake Mary RoadAwarded to: Carlson Construction Company (775-782-2006)Contract Amount: $4,551,024.00 Date of Award: November 7, 2006 CA PFH 149-1(2a), Mad River Road Slide RepairAwarded to: Mercer Fraser Company (707-443-6371)Contract Amount: $1,969,485.00 Date of Award: September 19, 2006 CA PRA YOSE 500(1), Valley Loop RoadAwarded to: George Reed, Inc.Contract Amount: $14,711,407.20 Date of Award: September 8, 2006 CA PRA SEKI 10(6R), Generals Highway SequoiaAwarded to: AGEE Construction Corporation (559-299-3290)Contract Amount: $ 11,539,438.00 Schedule A Date of Award: June 13, 2006 CA PFH 119-1(4), Oroville-QuincyAwarded to: Mercer-Fraser Company (707-433-6371)Contract Amount: $15,494,923.75 Date of Award: January 10, 2006 CA PRA DEVA 10(2), Death Valley National ParkAwarded to: Mercer Fraser Company (707-443-6371)Contract Amount: $ 6,477,325.80 Date of Award: August 4, 2005 CA PFH 93-1(2), Cecilviile-CallahanAwarded to: Mercer Fraser Company (707-443-6371)Contract Amount: $ 5,263,388.00 Date of Award: May 4, 2005 CA PFH 24-2(1), Gold Lake RoadAwarded to: Eagle Peak Rock & Paving (530-233-4568)Contract Amount: $5,062,897.00 Date of Award: May 4, 2005 CA PRA YOSE 14(3) & 16(5), Merced River Bridge/El Portal RoadAwarded to: American Civil Constructors - West Coast (707-746-8028)Contract Amount: $5,279,287.50 Date of Award: 03/18/05 CA PFH 120-1(3), Quincy-LaPorte RoadAwarded to: DD-M/Nova, A Joint Venture (510-769-8707)Contract Amount: $3,898,324.00 Date of Award: 08/05/04 CA RRP DOED 10(1), Marshlands Road - Don Edwards SF Bay NWRAwarded to: RGW Construction, Inc. (925-606-2400)Contract Amount: $1,161,904.00 Date of Award: 07/26/04 CA PFH 93-1(1), Cecilville-CallahanAwarded to: Mercer, Fraser Company (707-443-6371)Contract Amount: $4,298,946.00 Date of Award: 05/19/04 CA ERFO/PRA SEQU 10(7), Generals Highway-Sequoia Kings CanyonAwarded to: Stimpel-Wiebelhaus Associates (530-223-6605)Contract Amount: $1,981,104.00 Date of Award: 01/16/04 CA PRA YOSE 14(2), South Fork Merced River Bridge/CA PRA YOSE 16(4),El Portal Road Micro-Surfacing - Yosemite National ParkAwarded to: Mitchell Engineering (415-227-1040)Date of Award: 12/18/03 CA PFH 119-2(3), Oroville-Quincy Highway, Plumas National ForestAwarded to: Viking/Stimpel A Joint Venture (530-223-6605)Contract Amount: $6,926,739.00 Date of Award: 11/26/03 CA PFH 149-1(2), Mad River Road, Shasta-Trinity National ForestsAwarded to: Tidewater Contractors, Inc. (541-469-5341) CA PFH 148-1(1), 148-1(2) & 149-1(3), Trinity County Bridges Awarded to: Hooker Creek, Inc Contract Amount: $10,527,113.00 Date of Award: May 3, 2011 |
Colorado
CO PFH 81-1(4), Tarryall Creek RoadAwarded to: Kirkland Construction (719-489-3385) Contract Amount: $8,772,541.50 (Schedule A, Option X & Y) Date of Award: 12/18/12 CO PRA/NPS MEVE PRES 1(12), Mesa Verde Pavement Pres.Awarded to: Spanish Springs Construction, Inc.(775-425-4000) Contract Amount: $3,324,444.00 Date of Award: 02/21/2012 CO RRP ALAM 100(1), Bluff Overlook DriveAwarded to: Robins Construction ( 719-376-2351 ) Contract Amount: $259,971.00 Date of Award: 04/15/2011 CO PFH 81-1(3), Tarryall Creek RoadAwarded to: Ledcor CMI Inc. CO RRP MOVI 10(2), Auto Tour RouteAwarded to: RMS Utilities Inc (719-589-4263)Contract Amount: $354,550.00 (Schedule A) Date of Award: 07/16/2009 CO PRA MEVE 10(9), Main Entrance RoadAwarded to: Ledcor CMI (602-595-3017)Contract Amount: $11,461,273.00 (Schedule A, Options X, Y, Z) Date of Award: 05/21/2009 CO PRA ROMO 10(5), Trail Ridge RoadAwarded to: Coulson Excavating Company, IncContract Amount: $6,884,666.40 Date of Award: 03/16/2009 CO IMR-PRES 1(08), Canyonlands National Park (Pavement Preservation)Awarded to: Intermountain Slurry Seal, Inc. (831-724-1011)Contract Amount:$5,237,960.00 Date of Award: 08/05/08 CO PFH 80-2(3), Guanella Pass RoadAwarded to: SEMA Construction, Inc. (303-627-2600)Contract Amount: $31,547,589.30 Date of Award: 06/13/2008 CO RRP ROMO 103(1), Lower Derby Lake RoadAwarded to: JE Hurley Construction, Inc (719-265-8668)Contract Amount: $729,777.60 Date of Award: 05/13/2008 CO PFH 16-1(2), Marvine-YampaAwarded to:American Civil Constructors, Inc (303-730-4534)Contract Amount: 1,859,495.00 Date of Award: 11/20/2007 |
CO PRA MEVE 10(8) & 200(1), Chapin Mesa & Wetherill Mesa RoadsAwarded to: Kirkland Construction LLLP (719-489-3385)Contract Amount: 14,449,357.00 Date of Award: 04/06/2007 CO PRA ROMO 10(4), Trail Ridge RoadAwarded to: Kiewet Western Company (303-979-9330) CO RRP BRPA 10(1) Browns Park NWR Wildlife DriveAwarded to : Creative Times, Inc (719-278-0901)Contract Amount: $1,999,270.00 Date of Award: 08/16/2006 CO PFH 81-1(2), Tarryall Creek RoadAwarded to: American Civil Constructors (303-795-2582)Contract Amount: $10,524,265.20 Date of Award: 05/25/06 CO PRA COLM 10(1), Rim Rock DriveAwarded to: Kiewit Western Company (303-979-9330)Contract Amount: $8,334,605.00 Date of Award: 05/09/06 CO PRA GRSA 10(1), Entrance Road (Great Sand Dunes)Awarded to: Asphalt Constructors, Inc. (719-589-6671)Contract Amount: $2,922,456.00 Date of Award: 04/10/06 CO PFH 16-1(1), Marvine PhippsburgAwarded to: RB Constructors, LLC (208-656-9404)Contract Amount: $4.047,300.00 Date of Award: 03/16/05 CO OM-AD 300(50), Minuteman Missile Access RoadsAwarded to: Pine Bluffs Gravel & ExcavatingContract Amount: $578,368.00 Date of Award: 07/28/04 CO PRA CURE 10(2), Lake Fork, Elk Creek & Iola (Curecanti)Awarded to: Oldcastle SW Group, Inc. dba United Companies of Mesa County (970-243-4900)Contract Award Amount: $3,927,418.00 Date of Award: 04/21/06 CO PRA MEVE 10(7), Main Entrance Road, Mesa Verde National ParkAwarded to: Kirkland Construction, LLP (719-489-3385)Contract Amount: $5,077,350.00 Date of Award: 04/08/04 CO PFH 80-1(1) & 2(2), Guanella Pass Road including 7th St. BridgeAwarded to: American Civil Constructors, Inc. (303-795-2582)Contract Amount: $20,114,704.40 Date of Award: 01/08/04 |
Hawaii
HI A-AD 6(7), SADDLE ROAD- WEST SIDEAwarded to: Goodfellow Bros., Inc. (808) 879-5205 Contract Amount: $30,807,760.00 (Schedule A+X) Date of Award: 9/5/12 HI A-AD 6(6), SADDLE ROAD- WEST SIDEAwarded to: Kirkland Construction LLLP (719) 489-3385 Contract Amount: $33,772,860.00 (Schedule B+X) Date of Award: 8/22/11 HI PRA HAVO 10(1), HI PRA HAVO 1-(3) & HI NPS PWR 1(11) CRATER RIM DRIVEAwarded to: Jas. A. Glover, Ltd (808) 935-0871 Contract Amount: $15,012,578.70 Date of Award: 5/26/11 HI A-AD 6(5), State Route 200, Saddle RoadAwarded to: Goodfellow Brothers, Inc. (808) 887-6511Contract Amount: $34,621,625.00 Date of Award: 10/24/08 HI STP/PLH KEPO 10(3), Kealia PondAwarded to: Jennings Pacific LLC (808) 537-1710Contract Amount: $747,261.50 Date of Award:10/21/08 HI A-AD 6(4), State Route 200, Saddle RoadAwarded to: Goodfellow Brothers, Inc. (808) 887-6522Contract Amount: $9,278,727.00 Date of Award: 10/25/07 |
HI A-AD/STP 6(3), Saddle Road & 200(1) Pohakuloa Training AreaAwarded to: Goodfellow Brothers, Inc. (808) 879-5205 HI PLH SR 11-1(1), Volcano HighwayAwarded to: Isemoto Contracting Co., Ltd. (808) 935-7194Contract Amount: $2,734,595.50 Date of Award: 06/03/05 HI RRP/FWS, HAFO 10(1), Keanakolu Road/Hakalau National ForestAwarded to: Willocks Construction Corp. (808) 982-9099Contract Amount: $1,228,302.00 Date of Award: 5/27/05 HI 6(2), & EMP 6(1A), Saddle Road & Palila Mitigation Site FencingAwarded to: Kiewit Pacific Company (808) 674-1088Contract Amount: $9,986,824.00 Date of Award: 03/31/05 HI A-AD 6(1), Saddle RoadAwarded to: Kiewit Pacific Company (808) 674-1088Contract Amount: $11,123,862.00 Date of Award: 01/09/04 |
Idaho
NO CONTRACTS AWARDED FOR THE STATE OF IDAHO |
Kansas
KS PRA/PLH FOLS 10(1), Fort LarnedAwarded to: Victor Corporation |
Montana
NE/SD NPS/PRA MWR PRES 1(11), Midwest Region Pavement PreservationAwarded to: Bailey Construction Services, Inc. |
Nebraska
NE/SD NPS/PRA MWR PRES 1(11), Midwest Region Pavement PreservationAwarded to: Bailey Construction Services, Inc. NE OMAD 36(36), CO OMAD 300(52) & WY OMAD 301(49), Minuteman Missile Access RoadsAwarded to: KSK Contracting, Inc.Contract Amount: $1,640,376.00 Awarded Schedule A & Option 1 Date of Award: 06/05/07 NE OMAD 36(35) & CO OMAD 300(51), Minuteman Missile Access RdsAwarded to: Federal Services, Inc. (701) 265-8262Contract Amount: $1,768,980.00 Awarded Schedule A, Option 1, Option 2 and Option 3 Date of Award: 05/04/06 |
NE OM-AD 36(34), Minuteman Missile Access RoadsAwarded to: Pine Bluffs Gravel & Excavating, Inc. (307) 245-3426Contract Amount: $1,721,858.64 Date of Award: 06/08/05 NE OM-AD 36(33), Minuteman Missile Access RoadsAwarded to: S & L IndustrialContract Amount: $898,630.00 Date of Award: 07/27/04 |
Nevada
NV PRA LAME 112-1(2)Awarded to: Las Vegas Paving Corporation NV PRA/NPS LAKE PRES 1(11) and NV PRA LAKE 1(5D),Lake Mead National Recreation Area Pavement Preservation and West End Culvert Repairs Awarded to: Abide International (707-935-1577) NV PFH 2(1), Mount Rose HighwayAwarded to: E&M Enterprises NV PFH 31(1), Lamoille Canyon RoadAwarded to: Eagle Peak Rock & Paving, Inc.(530-233-4568)Schedule A, Options W, X and Z Contract Amount: $4,323,828.00 Date of Award: 12/15/09 NV PRA LAME 1(8), Northshore RoadAwarded to: Frehner Construction Company (702-649-2530)Contract Amount: $10,725,159.88 (Schedule A) Date of Award:08/21/2008 NV/AZ HPP 93(4), Hoover Dam Bypass Interim SurfacingAwarded to: Las Vegas Paving Corporation (702-251-5800)Contract Amount: $6,505,066.50 (Schedule A & Options X and Y) Date of Award: 12/06/07 |
NV ERFO 103(1), Virgin Valley RoadAwarded to: Eagle Peak Rock & Paving, Inc.(530-233-4568)Contract Amount: $502,165.00 Date of Award: 9/10/07 NV PRA LAME 1(6), 1(7) & 2(1), Northshore Road and Lake Mead Blvd.Awarded to: Frehner Construction Company (702-253-0919)Contract Amount: $13,906,507.90 Date of Award: 12/21/05 NV-AZ HPP 93(3), Hoover Dam Bypass Colorado River BridgeAwarded to: Obayashi Corporation/PSM Construction USA, Inc.A Joint Venture (650-952-4910) Contract Amount: $114,000,000.00 Date of Award: 10/22/04 |
New Mexico
NM PFH 35-1(1), ALAMOGORDO-ELKAwarded to: Southwest Paving Solutions, LLC
| NM PFH 12-1(6), CUBA-LACUEVAAwarded to: Twin Mountain Construction II Company (505) 884-9715 NM PRA BAND 10(1), Bandelier National MonumentAwarded to: Twin Mountain Construction II Company (505) 884-9715Contract Amount: $1,573,151.60 Date of Award: 07/19/04 NM PRH 45-1(5), Sacramento River RoadAwarded to: Delhur Industries, Inc. (360) 457-1133Contract Amount: $10,158,250.12 Date of Award: 12/03/03 |
North Dakota
ND ERFO 10(1) & PRA THRO 11(5)Awarded to: Steve Manning Construction, Inc. Contract Amount: $6,345,776.00 (Schedule A and Option X) ND RRP CLSA 12(2), Auto Tour Route, J. Clark Salyer NWRAwarded to: Industrial Builders, Inc. (701-282-4977) Contract Amount: $2,544,243.50 (Schedule C) ND PRA THRO 10(3), North Unit Scenic Drive, Theodore Roosevelt NPAwarded to: DLM Contraccting, Inc. (406-586-2881)Contract Amount: $6,953,975.00 (Schedule A & Option X) Date of Award: 05/20/2009 ND PRA THRO 10(4), North Unit Spot Repai, Theodore Roosevelt NPAwarded to: Bituminous Paving, Inc (320-273-2113)Contract Amount: $1,313,994.50 (Schedule C) Date of Award: 06/18/08 |
ND RRP UPSO 11(1), Prairie Marsh Scenic DriveAwarded to: TEK Industries (701-290-2841)Contract Amount: $1,659,745.60 Date of Award: 05/16/06 ND PRA THRO 11(4), South Loop Road, Theodore Roosevelt NPAwarded to: Northern Improvement Company (701-277-1225)Contract Amount: $6,437,171.00 Date of Award: 07/20/04 |
Oklahoma
OK RRP WIMO 11(1) & 10(1), Wichita Mountains NWRAwarded to: Laforge & Budd Construction Company, Inc. (620) 421-4470 OK PRA CHICK 10(2)ETAL, Perimeter Road, Veterans Lake Dam, Veterans Lake Picnic & Trails, Chickasaw Recreation AreaAwarded to: Seal Masters, Inc/PSI (580) 369-2393Contract Amount: $ 1,152,750.00 Date of Award: 09/06/2007 |
South Dakota
SD PRA BADL 10(7), Dillon PassAwarded to: Bituminous Paving, Inc. NE/SD NPS/PRA MWR PRES 1(11), Midwest Region Pavement PreservationAwarded to: Bailey Construction Services, Inc. SD PFH 27-1(1), Iron Creek - Spearfish Road, Black Hills National ForestAwarded to: Bituminous Paving, Inc (320-273-2113)Contract Amount: $ 3,580,146.93 Date of Award: 04/11/07 SD PFH 17-1(6), Hill City to Lead Spot RepairAwarded to: Red Wilk Construction (605-352-0735)Contract Amount: $ 3,138,571.56 Date of Award: 02/11/10 |
SD RRP LAAN 101(1), North and South Dike RoadAwarded to: Doug O'Bryan Contracting, Inc.Contract Amount: $1,378,132.60 Date of Award: 09/05/07 |
Texas
TX PRA/NPS IMR PRES 1(12), Texas Pavement PreservationAwarded to: Intermountain Slurry Seal, Inc. TX RRP TRRI 101(1), Champion Lake RoadAwarded to: Kimrick Performance Group, LLC (832-722-7623) TX PRA BIBE 11(2), 13(4), 233(1) & ERFO BIBE 16(5), Big Bend - N&W Entrance Roads, Chisos Basin Campground and Santa Elena Canyon RoadAwarded to: Reece Albert, Inc. TX NPS BIBE PRES 1(10), Big Bend Pave PresAwarded to: Intermountain Slurry Seal, Inc. 831-724-1011Contract Amount: $5,024,990.00 Date of Award:5/13/2010 TX PRA BIBE 13(5), West Entrance RoadAwarded to: ERS, Inc. (601-982.7788)Contract Amount: $887,667.00 Date of Award:7/1/2009 TX RRP BRAZ 10(3), Brazoria Auto Tour Loop RoadAwarded to: Garner Paving and Construction, Ltd.Contract Amount: $1,525,420.00 (Schedule A) Date of Award: 2/27/2009 TX RRP BACA 100(1), Balcones CanyonlandsAwarded to: Decatur Construction, Inc.Contract Amount: $565,173.00 Date of Award: 02/04/09 |
TX RRP BRAZ 10(2), Brazoria Tour Loop RoadAwarded to: MAPCO, Inc. TX PRA BIBE 16(4) & 109(1), Castolon to Santa ElenaAwarded to: Gilbert Texas Construction, L.P.Contract Amount: $2,074,604.86 Date of Award: 06/09/05 TX RRP/FWS ANAH 10(1), Anahuac Entrance Road and Bridge ReplacementAwarded to: W.T. Byler Company, LP 281-445-2070Contract Amount: $3,549,665.75 Date of Award: 05/26/05 TX FWS HAGE 10(1), Hagerman National Wildlife Refuge(Schedule A)Awarded to: North Texas Bridge Company, Inc. (972-509-1359) TX FWS ANAH 10(2), Anahuac Various Roads Awarded to: Ledcor CMI, Inc Contract Amount- $3,391,197.00 Date of Award: 6/21/11
|
Utah
UT PFH 46-1(2), La Sal Mountain Loop RoadAwarded to: LeGrand Johnson Construction, Inc. UT PFH 29-1(1), Beaver to JunctionAwarded to: Interstate Rock Products, Inc. UT/WY NPS/PRA IMR PRES 1(11)Awarded to: PnK Constructors, LLC. UT PRA CARE 10(1), Capitol Reef Scenic DriveAwarded to: Geary Construction, Inc. UT ZION 10(5), Zion - Mt. Carmel SwitchbacksAwarded to: A-T Asphalt, Inc. UT PLH 523-1(1), Bear River Access RoadAwarded to: Staker & Parson CompaniesContract Amount: $6,338,246.60 (Schedule C, Options X, Y, & Z) Date of Award:06/19/2008 UT PFH 39-1(2), Sevenmile-Gooseberry Rd, Phase IIAwarded to: RAM Constructors, Inc (801-225-7662)Contract Amount: $8,610,513.00 Date of Award: 01/14/2008 UT PRA CARE 227(1), Burr Trail RoadAwarded to: Brown Brothers Construction CompanyContract Amount: $622,602.47 Date of Award: 08/22/07 |
UT PFH 46-1(1), Mill Creek Bridge ReplacementAwarded to: Adams & Smith, Inc. UT PFH 8-1(1), Ephraim-OrangevilleAwarded to: Brown Brothers Construction CO. (435-836-2685) UT PRA GLCA 7(1), Halls Crossing RoadAwarded to: LeGrand Johnson Construction Company (435-752-2000)Contract Amount: $3,763,536.00 (Schedule A only) Date of Award: 03/06/06 UT PRA DINO 10(2) & 100(1), Cub Creek & Quarry AccessAwarded to: Burdick Paving (435-722-5013)Contract Amount: $ 2,467,890.75 (includes Schedule A and Option Y) Date of Award: 07/15/05 UT PFH 39-1(1a), Sevenmile-Gooseberry Phase 1 PavingAwarded to: Hales Sand & Gravel, Inc. (435-529-7434)Contract Amount: $2,805,600.50 Date of Award: 06/22/05 UT PRA ZION 10(3) & 11(2), Zion Canyon Scenic DriveAwarded to: Interstate Rock Products, Inc. (435-635-2628)Contract Amount: $2,891,828.90 Awarded Schedule A, Option Y and Modified Contract to Include Option Z Date of Award: 04/15/05 |
Wyoming
WY HPP 4-1(7), Beartooth Highway (U.S. 212)Awarded to: LaForge & Budd Construction Company, Inc. WY ERFO 261(1), Cedar Pass RoadAwarded to: Rocky Mountain Excavators, Inc.,303-841-0292 Contract Amount: $835,238.77 Awarded Schedule A Date of Award: 7-25-11 WY PFH 26(2), Sage Creek RoadAwarded to: LaForge & Budd Constructors Contract Amount: $8,952,935.00 Awarded Schedule A & Option X Date of Award: 6-28-11 WY HPP 4-1(6), Beartooth Highway (U.S. 212)Awarded to: American Civil Constructors, Inc.(303-730-4534) WY PFH 26-1(1), Sage Creek RoadAwarded to: Motzko Company USA, LLC (952-955-1845)Contract Amount: $1,059,545.25 Awarded Schedule A and Option X Date of Award: 4/13/09 WY HPP 4-1(5), Beartooth HighwayAwarded to: HK Contractors, Inc. (208-523-6600) |
WY PFH 23-1(2), Louis Lake RoadAwarded to: High Country Construction, Inc. (307-332-4933) WY HPP 4-1(4), Beartooth HighwaySOLICITATION CANCELLEDNo award will be made as solicited. A new solicitation will be repackaged at a later date. No other information is available at this time. WY HPP 4-1(3B), Beartooth Clearing ContractAwarded to: S&L Industrial (307-548-2242) WY RRP SEED 12(1), Seedskadee National Wildlife RefugeDesert Sage Contractors, Inc. (208-552-1144)Contract Amount: $520,999.00 Date of Award: 5/11/04 |