Argonne National Laboratory Nuclear Engineering Division

Think, explore, discover, innovate
U.S. Department of Energy

Nuclear Waste Management using Electrometallurgical Technology

Bookmark and Share  

The NE system engineering activities involve the conceptual design, through the manufacturing and qualification testing of the Mk-IV and Mk-V electrorefiner and the cathode processor. These first-of-a-kind large scale electrometallurgical process equipment have been installed in the Fuel Conditioning Facility at Idaho National Laboratory and have been operating since 1995.
The prototype cathode was designed, built and installed in Building 308 where experiments are conducted.

EBR-II Spent Fuel Treatment FlowsheetEBR-II Spent Fuel Treatment Flowsheet.
Click on photo to view a larger image.

A prototype cathode processor, essentially identical to the unit located in the hot cell at Idaho National Laboratory, was built and installed in Building 308 at Argonne. This unit is used for tests which explore different crucibles, crucible coatings, and processing methods. The prototype is well-suited for this task because it is easier to modify than the unit at Idaho National Laboratory and is not constrained by the need to continually process electrorefiner product.

For more information see also:

Go to: [ «« Nuclear Fuel Cycle and Waste Management Technologies ]

Last Modified: Tue, January 25, 2011 4:28 PM

 

RELATED RESOURCES

Facilities

Other Related Resources

For more information:

Engineering Development and Applications Dept.
Dept. Manager: C. Grandy
Fax:  +1 630-252-7577

C. Grandy's Executive Bio

 

U.S. Department of Energy | UChicago Argonne LLC
Privacy & Security Notice | Contact Us | Site Map | Search   go to top