Program Office 
Quick Reference Guide

Take a look at the Planning Process Map: http://www.easc.noaa.gov/APG/CP/Image_Map_Planning.htm.

1. Begin with a review of the Planning Chapter Section 1.1, Defining Requirements: http://www.easc.noaa.gov/APG/Planning/Planning-1-1-0DefiningRequirements.htm;

2. Write a rough draft of requirements: See templates:

a. Work Statements: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/NOAA-Work-Statements.doc

b. Generic SOW Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Generic-SOW-Template.doc;

c. SOO Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/SOO-Template.doc;

d. PWS Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Performance-Work-Statement-Template.doc;

3. Review Section 0.3 Ethics: http://www.easc.noaa.gov/APG/Introduction/Introduction-0-3-0.htm

a. If you find a potential Organizational Conflict of Interest, contact the KO and assist the KO in written analysis (this may result in mitigations or restrictions);

b. If none, proceed to market research;

4. Conduct Market Research following the guidance and citations at 1.3 Market Research: http://www.easc.noaa.gov/APG/Planning/Planning-130MarketResearch.htm:

a. See Helpful Hints at: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Market-Research-Helpful-Hints.doc;

b. See Market Research Checklist at: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Market%20Research%20Checklist%209-28-07.doc;

5. Work jointly with ERAD to develop a milestone plan or narrative plan with milestone plan. See 1.4 Acquisition Planning: http://www.easc.noaa.gov/APG/Planning/Planning-140AcqPlanning.htm;

a. Consider the acquisition methods at 1.5 Methods of Procurement: http://www.easc.noaa.gov/APG/Planning/Planning-150MethodsProc.htm;

b. Consider the contract types at 1.6: http://www.easc.noaa.gov/APG/Planning/Planning-160ContractTypes.htm (KO must execute Determination and Findings (D&F) for certain contract types);

c. Consider small business and socio-economic goals, complete the required CD-570 and determine applicable mandatory set-asides: http://www.easc.noaa.gov/APG/Planning/Planning-170SCCP.htm:

d. Complete EIT/508 checklist: http://www.easc.noaa.gov/APG/Planning/Planning-172ECS508C.htm;

e. Consider applicability of the Service Contract Act, include applicable clauses, and applicable wage determination(s): http://www.easc.noaa.gov/APG/Planning/Planning-173SCA.htm;

f. Determine applicable Security Clauses (IT and physical): http://www.easc.noaa.gov/APG/Planning/Planning-174CSC.htm;

g. Complete the IT Security Checklist: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/DOC IT Security Checklist.docx;

h. Determine advisory and assistance applicability and any clauses and reviews: http://www.easc.noaa.gov/APG/Planning/Planning-177AAS.htm;

i. Complete required D&Fs: http://www.easc.noaa.gov/APG/Planning/Planning-178DF.htm (especially consider the need to complete the D&F for Use of Contractor Support for Certain non-inherently Governmental Functions: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Sample-DF-Contractor-Support-for-Non-Inherently-Governmental-Functions.doc);

6. Following completion of the above planning activities, prepare a Procurement Request Package: http://www.easc.noaa.gov/APG/Planning/Planning-1-10PRP.htm:

a. (Section B) Cost Estimate: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/NOAA%20Independent%20Government%20Cost%20Estimate%20GUIDE.doc;

b. (Section C) Statement of Work (finalize from draft): See templates:

i. NOAA Work Statements: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/NOAA-Work-Statements.doc

ii. Generic SOW Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Generic-SOW-Template.doc;

iii. SOO Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/SOO-Template.doc;

iv. PWS Template: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/Performance-Work-Statement-Template.doc;

c. (Section J) CDRLS: http://www.easc.noaa.gov/APG/Planning/Plan_Docs/CDRL-Acq-Data-Rights.doc;

d. (Section L) Proposal instructions;

e. (Section M) Evaluation Criteria;

NOAA Acquisition Process Guide Samples & Templates

 

 


 

 
 

NOAA Acquisition Process Guide Templates

Module Section Templates currently contained in the Acquisition Process Guide as of 1/31/11 Source
1.11 Source Selection Plan Template NOAA
1.4 Simplified Acquisition Procedures and Federal Supply Schedule Plan of Action and Milestones Template NOAA
1.4 SAP and FSS POA&M Template NOAA
1.4 Emergency Acquisition Contracting AP Template NOAA
3 Simplified Acquisition Documentation Record NOAA
3 SAP Pre/Post-Negotiation BCM Template NOAA
3 SAP Post-Negotiation BCM Template NOAA
3.8 Simplified Acquisition Documentation Record NOAA
1.12.2 SAP Pre/Post-Negotiation BCM Template NOAA
1.12.2 SAP Post-Negotiation BCM Template, NOAA
1.3.2 Pre-Solicitation Brief Template NOAA
1.4.2 Simplified Acquisition Procedures and Federal Supply Schedule Planning and Acquisition Milestones NOAA
1.4.2 NOAA Milestone Plan Template NOAA
1.4.3 NOAA AP Milestone Template. NOAA
1.5.13 http://www.ogc.doc.gov/gen_law.html DOC
1.5.9.2 D&F for T&M Template. NOAA
1.6.5 D&F for T&M Contract Template NOAA
1.6.6 D&F for UCA Template NOAA
1.7.3.2 General and Specific Information Technology Requirements NOAA
1.7.3.2 NOAA PWS Template; NOAA
1.7.3.3 NOAA Acquisition Strategy Requirements Template NOAA
1.7.8 D&F for UCA Template NOAA
1.8.3.3 Simplified Acquisition Sole Source Justification Template – General NOAA
1.8.3.3 Simplified Acquisition Sole Source Justification Template – Supplies NOAA
2.3.2.13 Past Performance Questionnaire Template NOAA
3.1.1 Simplified Acquisition Documentation Record NOAA
3.1.1 SAP Pre/Post-Negotiation BCM Template NOAA
3.1.1 SAP Post-Negotiation BCM Template NOAA
3.1.5 Simplified Acquisition Documentation Record NOAA
3.1.5.1 Simplified Acquisition Documentation Record NOAA
3.1.5.2 SAP Pre/Post-Negotiation BCM Template NOAA
3.1.5.2 SAP Post-Negotiation BCM NOAA
3.2.1 Source Selection Kickoff Memo Template NOAA
3.2.1 Source Selection NDA Template NOAA
3.2.2 Contractors as Evaluators NOAA
3.2.2 Source Selection Plan Template NOAA
3.2.2 D&F Template To Use Contractors as Evaluators NOAA
3.2.3 Source Selection Kickoff Memo Template NOAA
3.2.5 Past Performance Questionnaire Template NOAA
3.2.5 PPET Report Template. NOAA
3.6.2 Proposed Debriefing Agenda Template NOAA
3.8.1.1 FAR 15 BCM Template NOAA
3.8.1.1 SAP Pre/Post-Negotiation BCM Template NOAA
3.8.1.2 FAR 15 BCM Template NOAA
3.8.1.2 SAP Post-Negotiation BCM Template NOAA
3.8.1.3 FAR 15 BCM Template NOAA
3.8.1.3 SAP Pre/Post-Negotiation BCM Template NOAA
3.8.5 Simplified Acquisition Documentation Record NOAA
3.8.5 SAP Pre/Post-Negotiation BCM Template NOAA
3.8.5 SAP Post-Negotiation BCM Template NOAA
3.8.7 FAR Part 15 BCM Template NOAA
3.8.7.11 Lease Determination Worksheet NOAA
3.8.9 Simplified Acquisition Documentation Record (for requirements between $2,500 to the SAT) NOAA
3.8.9 SAP Pre/Post-Negotiation BCM Template (for requirements pursuant to FAR Subpart 13.5) NOAA
3.8.9 SAP Post-Negotiation BCM Template (for requirements pursuant to FAR Subpart 13.5) NOAA
3.8.9 FAR Part 15 BCM Template (for requirements pursuant to FAR Part 15) NOAA
4.2.1 Pre-award Notice of Exclusion Template  NOAA
4.2.2 Small Business Challenge Letter Template NOAA
4.4.1 SAP Pre/Post-Negotiation BCM Template NOAA
4.4.1 SAP Post-Negotiation BCM Template) NOAA
4.4.1 Simplified Acquisition Documentation Record NOAA
4.6.3 Debriefing Agenda Template NOAA
5.10.3 TAR Template NOAA
5.4.2.1 Contract Funding Summary Spreadsheet NOAA
5.4.2.1 Limitation of Funds Non-Compliance Letter Template. NOAA