For 2012 |
P12-IV-01 |
Safety Belts and Lines (30 C.F.R. §§ 56/57.15005) |
P12-V-01 |
Reissue of P09-V-08 - Procedures for Revoking MSHA Certifications to Take Respirable Dust Samples or to Maintain and Calibrate
Approved Dust Sampling Devices |
P12-V-02 |
Examination, Testing, and Maintenance of Conveyor Belt Emergency Stop Devices under 30 C.F.R. § 77.502 |
P12-V-03 |
Reporting of Unplanned Roof Falls in Accordance with 30 C.F.R. § 50.10 |
P12-V-04 |
Reissue of P10-V-02 - Requirements of 30 C.F. R. § 75.313 and Two-Way Communication and Electronic Tracking Systems Operation after an Underground Coal Mine Accident |
P12-V-05 |
Reissue of P10-V-6 - Bleeder System Examinations |
P12-V-06 |
Longwall Lighting Cables |
P12-V-07 |
Circuit Identification under 30 C.F.R. § 75.903 and 75.904 |
P12-V-08 |
Application of 30 C.F.R. Part 75.323(e) to Bleeder Systems |
For 2011 |
P11-III-01 |
Part 41 Legal Identification Numbers for Auger and Highwall Miner Operators and Providing MSHA Notification of the
Relocation of These Portable Mining Operations |
P11-IV-01 |
Reissue of P10-IV-3: Examination of working places (30 CFR §§ 56/57.18002) |
P11-V-01 |
Clarification on Repairs or Maintenance of Machinery, 30 C.F.R. § 75.1725(c) |
P11-V-02 |
Application of Title 30, Code of Federal Regulations (C.F.R.) § 75.523-2 to Mobile Bridge Carriers Connected to Continuous Miners That Form Component Part of Self-Propelled Electric Face Equipment |
P11-V-03 |
Electric Equipment; Examination, Testing and Maintenance |
P11-V-04 |
Remote Restarting of Conveyor Belts when a Slip Switch Stops the Belt |
P11-V-05 |
Temporary Employment Agency Contracting and Part 50 Reporting |
P11-V-06 |
Check In - Check Out System |
P11-V-07 |
Two-Way Communication and Electronic Tracking System: Potential Interference of RF Electromagnetic Fields with Electric Blasting Circuits |
P11-V-08 |
Tests for Methane at the Working Face, Using Extendable Probes or Other Acceptable Means |
P11-V-09 |
Guidance on Issuance of Orders Under Sections 103(j) and (k) of the Mine Act |
P11-V-10 |
Approval Plate for Caterpillar Model 3306 PCNA Diesel Engine |
P11-V-11 |
Approval of Communication and Tracking Devices Required by the Mine Improvement and New Emergency Response Act of 2006 (MINER Act) |
P11-V-12 |
Re-Issue of P07-V-04 - Revision of MSHA Program Policy Manual, Volume II, Section 18.45- Insulation of Cable Reel and Spooling Devices |
P11-V-13 |
Guidance for Compliance with Post-Accident Two-Way Communications and Electronic Tracking Requirements of the Mine Improvement and New Emergency Response Act (MINER Act) |
P11-V-14 |
Water Sprinkler Fire Protection of Underground Belt Conveyors and Belt Takeup Storage Units |
P11-V-15 |
Interpretation of 30 C.F.R. 75.1100-1 and 2 Regarding Water Delivery Capability of Coal Mine Waterlines when Fighting a Fire
with a Firehose and Nozzle |
P11-V-16 |
Suitability, Safety and Performance of Circuit Breakers |
P11-V-17 |
Brass Compressed Gas Cylinder Valves and Associated Fittings Used in Refuge Alternatives |