Figure 1: Projected Highway Trust Fund Balance, Fiscal Years 2011 through 2022
Figure 3: Authentication Analysis Results of Part with Invalid Date Codes
Figure 2: Authentication Analysis Results of Obsolete or Rare Parts
Figure 1: Status of Parts Purchased and Tested
Figure 1: Potential Origins of Common Suppliers of Laptop Components
Figure 3: U.S. Attorney’s Office Process for Addressing Referrals Received from the Secretary of the Senate and Clerk of the House
Figure 4: Status of LDA Enforcement Actions for LD-2 Reporting (as of February 22, 2012)
Figure 4: KC-46 Planned Program Events Compared to GAO Best Practices
Figure 3: Planned KC-46 Program Concurrency between Development and Production
AHRQ's Recovery Act CER Funds ($474 million total)
Figure 1: AHRQ’s Standard Competitive Process for Selecting Grant Recipients
Figure 2: Title IV-E Eligibility Review 3-Year Cyclical Process
Figure 3: Foster Care Program Outlays for Fiscal Year 2010 Covered under IPIA Reporting
Figure 5: Compound Comprising Five Buildings Constructed in a Non-Secure Location outside the Perimeter of a Base
Figure 1: Shower/Toilet Facility Constructed without Holes in the Walls or Flooring for Plumbing and Drain
Figure 2: Poor-Quality Materials—Crumbling Cement Blocks
Figure 3: Unstable Staircase for Guard Towers
Figure 4: Cement Block Wall with Large Holes That Remained When Scaffolding Was Removed