Tag Types
Related Image Tags
![Image Icon](https://webarchive.library.unt.edu/web/20121111124558im_/http://d3.static.dvidshub.net/images/cameraIcon.jpg)
Image Tags: 2/1 AD
![Email Subscriptions for 21-ad DVIDS Subscriptions](https://webarchive.library.unt.edu/web/20121111124558im_/http://d2.static.dvidshub.net/images/subscriptions.png)
NIE 13.1 inserts OPFOR, soldiers react using NETT Warrior
Photo by Lt. Col. Deanna Bague | Brigade Modernization Command | Date: 10.26.2012Soldiers from 1st Battalion, 35th Armored Regiment, 2nd Brigade Combat Team, 1st Armored Division, drive through a mock village at Dona Ana Range, N.M., in their Mine Resistant Ambush Protected mine sweeper... View Image
Communication exercises in full swing as Army preps for its next large-scale network test [Image 1 of 4]
Courtesy Photo | ASA(ALT) System of Systems Integration Directorate Public Affairs | Date: 09.17.2012More than 360 vehicles were integrated for NIE 13.1 at the Integration Motor Pool (IMP), located at Fort Bliss, Texas. At the IMP, the Army's System of Systems Integration (SoSI) Directorate leads integration of... View Image
Communication exercises in full swing as Army preps for its next large-scale network test [Image 2 of 4]
Photo by Katie Cain | ASA(ALT) System of Systems Integration Directorate Public Affairs | Date: 09.17.2012In the months leading up to each Network Integration Evaluation (NIE), soldiers, engineers, combat developers and test officials integrate hundreds of vehicles and systems at the Integration Motor Pool at Fort... View Image
Communication exercises in full swing as Army preps for its next large-scale network test [Image 3 of 4]
Photo by Katie Cain | ASA(ALT) System of Systems Integration Directorate Public Affairs | Date: 09.17.2012In the months leading up to each Network Integration Evaluation (NIE), soldiers, engineers, combat developers and test officials integrate hundreds of vehicles and systems at the Integration Motor Pool at Fort... View Image
Communication exercises in full swing as Army preps for its next large-scale network test [Image 4 of 4]
Photo by Katie Cain | ASA(ALT) System of Systems Integration Directorate Public Affairs | Date: 09.17.2012In the months leading up to each Network Integration Evaluation (NIE), Soldiers, engineers, combat developers and test officials integrate hundreds of vehicles and systems at the Integration Motor Pool at Fort... View Image