Untitled Document
The TDWorld Channel
Search Our Videos
Advertisement
Video of the Week
Thumbnail
Over time, flood waters deposit sand and gravel in the normally dry Gila riverbed in the desert west of Phoenix. As a result, the distance between the ground and a major power line that crosses the riverbed can shrink. In this time-lapse video, watch how SRP crews solved the problem by raising this massive 500-kV tower to increase the distance and ensure continued safe operation of the line.
Most Viewed This Week
Recent Postings
d
   
IEEE PES