Model Transition Team
TRAINING AND DOCUMENTATION MATERIALS:
• WCOSS Transition Request Form (10/11/12) • WCOSS User Account Application (5/15/12) • WCOSS Transition Test Checklist and Certification Document (4/23/12) • IBM docs page for eddy • IBM docs page for current • Documentation • Master WCOSS Transition Spreadsheet (12/6/12) • Master WCOSS graphics and util spreadsheet (10/5/12) • Master WCOSS Libraries List (10/11/12) • WCOSS high level overview (7/25/12) • Approved Part I WCOSS Transition Checklist and Certification Documents • WCOSS Task Order 002 information briefing (4/24/12) • Locations Of Compiled Libraries On WCOSS Early Access System (Current 1 & 2) (4/24/12) |
NEWS AND UPDATES:
|
||||||||||||||||||||||||||||||||||||||
IMPORTANT INFORMATION AND FAQs: click [+/-] to open information if not already open Once you have successfully logged into both Current1 and Eddy please forward any further software or hardware information requests/queries to wcoss-helpdesk@noaa.gov. IBM Docs page for Eddy: http://ibmdocs.ncep.noaa.gov/eddy/ Latest Information as of July 6: [+/-] GEMPAK: The preliminary compile of GEMPAK has been done on zeus and current. It is available for testing at: /home/Bradley.Mabe on zeus and /u/wx11bm/nawips1 on current. Not all of the Gui programs are available due to some problems with the link step, however all of the GEMPAK libraries are available and look to be working correctly in tests with the decoders. IBM Docs page for Current (2 node WCOSS machine): http://ibmdocs.ncep.noaa.gov/current/ System Specifications (current 1 and 2): Intel S2R2 Series SDP (Romley-EP): 2x Intel Xeon Processor E5-2680 (8-Core, Sandy Bridge-EP, C1, QBEB) [2.70GHz, 20MB Cache, 8.0GT/s QPI] 16x 4GB PC3L-10600R ECC RAM (64GB total) 1x 1TB 7200 RPM 3.5" SATA HDD Supports up to 4 3.5" SAS HDDs in hot-swap bay Intel Server board S2600CP (Canoe Pass) 4U Rackmount Chassis (Union Peak-M) MEETING MINUTES: July 16, 2012 [Luis Cano]
May 14, 2012 [Luis Cano]
April 23, 2012 [Luis Cano]
|