Contract Details Vicinity Map


Description

LPV-103.01 - Lakefront Levee OEB - Orleans Canal to London Ave
Raise levees to authorized level per DM + calculated overbuild.

LPV-103.1A1 - Lakefront Levee OEB - 17th St. Canal to London Av. Canal - Phase 1A
Marconi gate, Orleans and Bayou St John work

This contract consists of strengthening the existing Marconi Floodgate, converting I-wall to T-wall, and modifying or replacing existing Bayou St. John I-walls. The existing heights range from +12 to +17 feet. New elevations will be to 100-year elevations of +16 feet. In addition, the sector gate at Bayou St. John will be raised.

LPV-103.1A2 - Gate Structure Lakefront OEB - Orleans Canal to London Ave.
Replace ramps between Topaz and London Ave, to include the Canal St ramp, Rail St and Lake Terrace

This contract consists of new gates to be constructed across Lakeshore Drive near Rail Street and Lake Terrace. Gates will be built to authorized elevations of +18 and +18.5 feet respectively. I-wall will be converted to L-wall at Rail Street to elevation +18 feet.


CONTRACT INFORMATION

LPV-103.01
Contract Award 12-03-2007
Contract Value $5.2M
LPV-103.1A1
Contract Award 08-07-2009
Contract Value $10.17M
LPV-103.1A2
Contract Award 07-22-2010
Contract Value $5.42M


CONSTRUCTION ACTIVITIES

LPV-103.01 - Construction complete.

LPV-103.1A1 - Construction complete.

LPV-103.1A2 - 23 July 2010: Contract awarded 22 July 2010.

LPV 103 Vicinity Map
LPV 103 Pump Station Locations

Photos

Orleans Canal to London Ave Canal facing west
Lakefront levee, Orleans Canal to London Ave Canal facing west.

Orleans Canal to London Ave Canal facing east
LPV103.1a1, Bayou St. John floodwall work

Revision Date: Friday, October 19, 2012