Contract Details Vicinity Map


Description

LGM-028A - S. L. Crawfish Farm Pump Station Discharge
A-E DESIGN SERVICES CONTRACT

The project plan is to stabilize the Crawfish Farm Pumping Station I-wall using Phase 1 Criteria. The professional services required of the A-E include detailed engineering and design (E&D). The E&D consists of incorporating the various design data, investigations and information provided into a constructible set of Plans and Specifications. The A-E will need to provide: (1) detailed geotechnical analysis and design including a geotechnical report and (2) structural analysis and design on the project’s components at existing elevations. The A-E shall provide detailed plans, specifications, quantities, cost estimates, and design documentation required by this scope. If the final plan is different from the above assumptions, appropriate contracting measures will be necessary.


CONTRACT INFORMATION

LGM-028A
Contract Award 10-04-2009
Contract Value $4.42M


CONSTRUCTION ACTIVITIES

LGM-028A - Construction complete.

Vicinity Map

Photos
Revision Date: Friday, October 19, 2012