Contract Details Vicinity Map


Description

LPV-06a.2 - Bayou Trepagnier Complex Floodwall - Phase 2
Construct floodwall tie-ins to 100-year level of protection.

Interim protection on floodwall tie-ins at Bonne Carre & Trepagnier.


CONTRACT INFORMATION

LPV-06a.2
Contract Award 12-23-2009
Contract Value $5.9M


CONSTRUCTION ACTIVITIES

LPV-06a.2 - 16 November 2010: Contractor plans to install and test 30" pipe, will remove the last 72" pipe and drive the rest of the H-pile and sheet pile for Monolith 5 and will begin to place rip-rap to fill the hole left from the old gate structure.