Description
WBV-11 - Belle Chasse Pump Station #2 Fronting Protection and Modifications
PS fronting protection, modifications, floodwall tie-ins to the detention-basin elevation.
This contract involves fronting protection constructed to elevation +9.5 and consist of pile-supported T-walls that tie into the adjacent levee sections. Butterfly valves will prevent backflow.
|