Description
WBV-MRL 07.1 - West Crossover Pt. to Parish Line
Interim Engineered Advanced Measure - Soil Ridge - Bring to design elevation. Provide 100 year level of protection.
This contract will address deficiencies along the MRL system by raising levee heights that are deficient by approximately 1.5 to 0 feet. This contract reach includes the Coast Guard facility. The scope includes the construction of approximately 5,850 LF of clay soil ridge.
|