Description
WBV-MRL 01.1 - Oak Point to Oakville
Interim Engineered Advanced Measure - Clay - Bring to design elevation. Provide 100 year level of protection.
This contract will address deficiencies along the MRLsystem by raising levee heights that are deficient by approximately 5 feet. This contract reach includes the Chevron Oronite Plant and the community of Oakville. The scope includes the construction of approximately 16,100 LF of stabilized soil.
|