Idaho

Status

Purchase of Contract Entitlement in Deadwood Reservoir for Salmon Flow Augmentation 01/2012 FONSI
Construction of a Third Hydroelectric Generating Unit - Black Canyon Final EA/FONSI 10/2011 FONSI
Palisades Dam Security Enhancement Project Final EA and FONSI 03/2011 Final

Ririe Dam and Reservoir Proposed Interim Operations Environmental Assessment

01/2011 Scoping

Minidoka Dam Spillway Replacement Project EIS

08/2010 Final

Repairs to Deadwood Dam Access Bridge and Operational Changes to Support Research Activities in the Deadwood River Environmental Assessment 08/2010 FONSI
Anderson Ranch Dam Security Enhancement Project EA and FONSI 07/2010 FONSI
Little Wood River Irrigation District Pressurized Pipeline Irrigation Delivery System Draft EA 03/2010 Draft
Deer Flat Dam Lower Embankment Security Enhancement Environmental Assessment 12/2009 Draft
Pioneer Irrigation District Title Transfer Proposal EA and FONSI 12/2007 FONSI
Fort Hall National Historic Landmark Bank Stabilization Project EA and FONSI 06/2007 FONSI
Poison Creek Campground Replacement Project Environmental Assessment 05/2007 EA
Teton River Canyon RMP/FONSI/EA 12/2006 RMP
Deer Flat Dam Upper Embankment Project EA and FONSI 09/2006 FONSI
Idaho Irrigation District Lands Inclusion/Exclusion EA 04/2006 EA
Partial Assignment of New Union Ditch Company Ltd.'s Contract Entitlement in Lucky Peak Reservoir FONSI/EA 11/2005 FONSI

American Falls Reservoir District #2 Proposed Title Transfer EA

09/2005 FONSI

Minidoka North Side RMP/FONSI/EA 01/2005 RMP

Fremont-Madison Irrigation District Title Transfer EA

09/2004 FONSI

Black Canyon Reservoir & Montour Wildlife Management Area RMP/FONSI/EA

07/2004 RMP

Lucky Peak Water Service Contracts Renewal or Conversion EA and FONSI

04/2004 FONSI

Programmatic EA for Implementing Fish Habitat Improvement Measures in Four Mountain Snake Province Subbasins

04/2003 FONSI

Lake Cascade RMP/FONSI/EA

02/2002 RMP

Ririe Reservoir RMP/FONSI/EA

11/2001 RMP
 

Montana

 

Upper Columbia Alternative Flood Control and Fish Operations EIS

08/2009 ROD
   

Oregon

Status

West Extension Irrigation District Boundary Adjustment Final EA and FONSI 09/2012 FONSI
City of Hermiston Recycled Water Pipeline and Outfall License Agreement
Draft Environmental Assessment
04/2011 FONSI
One Year Water Rental from Skyline Farms for Salmon Flow Augmentation FONSI 04/2010 FONSI

Tumalo Feed Canal Piping Project Environmental Assessment

07/2010 FONSI

Arthur R. Bowman Dam Safety of Dams Modifications Environmental Assessment and FONSI

02/2010 FONSI

Proposed Water Service Contract Palmer Creek Water District Improvement Company Environmental Assessment

04/2009 FONSI
Klum Landing Campground Improvement Project EA and FONSI 03/2009 FONSI
Central Oregon Irrigation District Water Conservation Project EA and FONSI 11/2007 FONSI
Greenberry Irrigation District Proposed Water Service Contract EA 06/2007 FONSI

Request for Contract to Conduct Mining Activities in the Sucker Creek Withdrawal

03/2007 FONSI

Powder House Cove Expansion Environmental Assessment

10/2006 FONSI

Indian Rock Estates Access Road Easement EA

09/2006 FONSI

Savage Rapids Dam Fish Passage Improvements Project EA

04/2006 FONSI

Proposed Wanapa Energy Center Record of Decision

07/2005 ROD

Farmers Irrigation District Lower Distribution Pressurization Project EA

04/2005 EA

Prineville Reservoir Repeater Tower EA

04/2005 EA

Larson Creek Pipeline and Fish Passage Project EA

09/2004 FONSI

Proposed Boundary Adjustment for the Westland Irrigation District EA

06/2004 FONSI

Henry Hagg Lake RMP/FONSI/EA

05/2004 FONSI

Tyler Creek Wasteway Stabilization Programmatic EA

03/2004 FONSI

Programmatic EA for Implementing Fish Habitat Improvement Measures in Three John Day Subbasins

05/2003 FONSI

Prineville Reservoir RMP/FONSI/EA

05/2003 RMP
 

Washington

Status

Hidden Beach Stabilization Project EA and FONSI 07/2012 FONSI
Grand Coulee's Third Powerplant 500-Kilovolt Transmission Line Replacement Project EA (BPA document) 05/2011 Draft EA
Yakima River Basin Integrated Water Resource Management Plan Draft PEIS 11/2011 DRAFT PEIS
Cle Elum Fish Passage Facilities and Fish Reintroduction Project EIS 08/2011 ROD
John W. Keys III Pump-Generating Plant Modernization Final EA and FONSI 03/2012 FONSI
Cle Elum Dam Fish Passage Facilities & Fish Reintroduction Final EIS 04/2011 Final
Odessa Subarea Special Study Final Environmental Impact Statement 08/2012 Final
Entiat River Offstream Water Wells Implementation EA and FONSI 09/2010 FONSI
Preston Reach Habitat Complexity Project – Phase 1 EA and FONSI 08/2010 FONSI
Third Powerplant Generating Units Overhaul Activities EA 05/2010 FONSI

Steamboat Rock State Park Campground Addition Environmental Assessment

03/2010 FONSI
Sunnyside Division RRM Water Conservation Project Environmental Assessment 03/2010 FONSI
Sunnyside Division Phase 2 Conservation Plan EA and FONSI 09/2009 FONSI
Upper Columbia Alternative Flood Control and Fish Operations EIS 08/2009 ROD
Lake Roosevelt Incremental Storage Releases Project FONSI and EA 06/2009 FONSI
Yakima River Basin Water Storage Feasibility Study Planning Report and EIS 12/2008 Final
Benton Irrigation District Water Conservation Program Feasibility Study Environmental Assessment and FONSI 10/2008 FONSI
Cline Irrigation District Water Conservation Project FONSI 01/2008 FONSI

Potholes Reservoir Supplemental Feed Route FONSI and EA

08/2007 FONSI

Sunnyside Division Board of Control Water Conservation Program EA

09/2004 FONSI

Banks Lake Drawdown EIS

06/2004 ROD

Potholes Reservoir RMP/ROD/EIS

08/2002 RMP

Banks Lake Resource Management Plan

07/2001 RMP
 

Last Update: October 4, 2012 2:36 PM